Utility Construction Projects
720 W 3rd ST
- Case Date:
- 5/4/2025
Gigabtye Contracted companies placed these while laying lines but have not returned to address their lack of filling in the side. This one just a great example but many if not all are this bad. Easy to fall into or wreck your bike if you don’t see the ruts on all sides. Especially for those of us who walk/ride at night. Where’s the oversight if any? Please fix these.
Utility Construction Projects
3365 E Longview Ave
- Case Date:
- 5/12/2025
This huge break in the road was not properly marked - the cone was well over a foot from the edge - and I hadn't realized how far in it went until it was too late to avoid it. Two of my tires popped, and my car had to be towed. I'd like the city to reimburse me for replacing them, but more importantly, I'd like for them to make sure these holes are properly marked.
Utility Construction Projects
819 N Indiana Ave
- Case Date:
- 9/3/2024
Fiber optic installation created some cylindrical holes in the concrete and asphalt about 6" in diameter in various locations. At this intersection, there is one that was apparently refilled with gravel, but another was left open and a stepping hazard. It is on the north part of the intersection, just north of where 11th crosses and closer to the east side of the street than the west. We found a concrete core by the side of the road that likely came out of the hole originally so we placed it back in the hole, but it sunk down a ways because it was unsupported beneath and now it needs to be topped off with gravel or the core should be removed and the entire hole filled with gravel.
Water Utility Problems
3242 S Coppertree DR
- Case Date:
- 5/30/2024
This is a photo of a storm water drain which has a visible cable present. This is not a request for action, just making you aware
Website & Web Services Feedback
800-848 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 5/1/2020
Hello, I am wondering if there are plans to finish the bikepath from Henderson along Winslow all the way up to Highland and the Winslow Sports complex. I live in Sherwood Oaks, and this would make biking to work on campus and biking downtown much safer for me. It would be great if someone from the city could reach out to Sherwood Oaks Neighborhood and let us know up sidewalk and bikepath plans along winslow, henderson and rhorer. I would also like to see a sidewalk all the way from Henderson to Jackson Creek Middle along Rhorer.
Website & Web Services Feedback
Bloomington City Hall
- Case Date:
- 7/31/2020
Hello, I live on Euclid Ave and have to make frequent turns onto W 2nd St. On the corner of these streets, across from the church there are overgrown plants/weeds beyond the sidewalk. It's impossible to see any cars coming from the left while on Euclid Ave. The hill makes it difficult but the plants take any vision left. I've accidentally almost involved myself in accidents due to this. I and I'm sure others would appreciate the obstruction be removed if at all possible.
Website & Web Services Feedback
1981 S Henderson St, Bloomington, IN 47401, USA
- Case Date:
- 9/7/2020
The new median installed seems like an addition to try to help pedestrians make a safe transition across the street. I think that’s a great step as I often have worried about students at dismissal from south trying to safely make their way across that intersection to the bus stop. However as it currently is, it is not safe for drivers & maybe not even pedestrians. I watched 2 cars drive right over it just after dark, one definitely popped a tire. When I passed it another time I noticed multiple tire marks over the median. There does not seem to be clear enough markings on the median to warn drivers that they need to swerve to the side to avoid it. This is certainly true at night, yet I believe may be true during the daytime too as there are no signs or markings to show that the driver must shift to the right around the median or slow down in any way. Perhaps this measure taken to try to improve safety is actually more dangerous to all. A pedestrian may have a false sense of safety standing on an unmarked median that is not early visible or marked for cars to see. Can it be made into an official crosswalk with proper signage and clear expectations for drivers to slow, be aware and stop for pedestrians? Please take steps to make this safer for drivers and pedestrians. If school ever resumes this seems even more dangerous than it was before the addition of this median. Thank you!
Website & Web Services Feedback
3151 N Kingsley DR
- Case Date:
- 10/4/2020
Bush at the corner of the property near the intersection needs to be trimmed back to make traffic more visible. The bush makes it hard to see oncoming traffic coming over the hill toward the intersection.
Website & Web Services Feedback
- Case Date:
- 10/22/2020
I'm writing with a suggestion. I spend quite a bit of time walking and running within Bloomington. Outside of the B-line (where my experience has been mixed), I find that car drivers rarely yield to pedestrians and marked pedestrian crosswalks. I wanted to suggest that the city consider adding flashing lights to the signage at crosswalks, in the hope that it would make drivers aware they're approaching a crosswalk, and be more likely to yield to pedestrians. Thanks.
Website & Web Services Feedback
- Case Date:
- 11/1/2020
Please post an update on the Vernal Pike/Seventeenth Street project. Seventeenth Street was closed in April 2019 and was to be reopened in November 2019. When will the street be opened?