closed #205536
City Construction Projects
1510 S Rogers St
- Case Date:
- 9/6/2025
laying in the grass opposite the kitchen by some utility boxes there's a construction sign that has been forgotten
laying in the grass opposite the kitchen by some utility boxes there's a construction sign that has been forgotten
There are 2 holes located in the grass area between the sidewalk and Heather on the north side of the street. I would like them to be filled in for safety. Both are before you get to Laurel Ct. Thank you, Kaye Beavers, Peppergrass HOA, landscaping
I’m not sure what the rules of construction activity that is permissible, but I would assume that blocking private driveways and working in a residential neighborhood at 3AM is not allowed. My son and his roommates are seeing construction workers using their private yard to eat lunch and even order food to their address. This is absolutely unacceptable and do not believe it’s allowed by law to work a construction site, pouring concrete, etc. in the middle of the night in a residential neighborhood.
Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.
Construction continues to obstruct private driveway of my son’s rental. They are placing cones and blockades well onto their private drive. Additionally they are pouring concrete and making noise at 3-4 AM waking residents and renters. Not acceptable!!!!!
Late construction in the middle of the week. Sometimes between the hours 12am-5am.
On Rogers St South of Patterson, the obstruction was on the north bound lane without warning or chaperone. The flagger was stationed at the first roadside flag, the second was behind him amidst the construction area, there was not a third sign as required by law. This scene is after I parked, I got out to record the issue though there were finally people from the site moving the barricade. I have video that offers more information but this scene was incredibly dangerous.
a few weeks ago i wrote on ureport about the missing crosswalk button device at the intersection of west 3rd street & franklin. later when i looked at ureport again i could see that a city engineer had contacted the i-69 project to tell them it was their problem. it still didn't get fixed, so i called the phone # for 1-69 & left a voice message. a man from there called me back & said that their project doesn't go that far, so it's up to the city to fix that. his name is kirk roth so if there is still a dispute, please call him at the phone# on their website. this needs to get resolved please for pedestrian safety at a very busy intersection. people who live on yancy etc need to cross there to get to the bus-stop across the street to go to work. thanks
What used to be a 10 minute drive to work now takes close to 35. Why? Construction on Tapp, 37, Rodgers, Walnut, 10th Street, Dunn, Fee, and Gordon Pike closed. There is literally not any route left to get to work. Everyone on the south side is forced to sit in traffic for two to three times the normal length due to terrible planning by the city in the closing of streets and construction that has effectivity shut down part of the city and prevent us from going anywhere or doing anything.
To: Mayor Hamilton, if you could please look at ureport case #161401 from october 3. now it is 2 months later & that crosswalk button at a very busy intersection (west 3rd st & franklin) still isn't fixed. i see mr. cibor's note there from oct.18 but even if he has to coordinate with another agency, it still shouldn't take this long. i am afraid i am going to get hit by a big truck. i cannot walk very fast because of medical problems. also, there will be snow & ice soon, making crossing there even more difficult.