closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.

closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.

closed #151354

City Construction Projects

Indiana University, Bloomington

Case Date:
4/4/2016

Road closed signs are knocked over and are in the southbound lane of Woodlawn.

closed #154032

City Construction Projects

Case Date:
7/12/2016

Citizen called, wanted to stay anonymous, reporting dangerous behavior by road crew working on Old 46. Drove toward her in her lane, head-on.

closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #165360

City Construction Projects

800 East 10th Street

Case Date:
8/3/2018

Please see attached photo. This location is at 10th and Park and has been reported to the IU Grounds Dept. as a tripping hazard. The gray bucket is there to indicate a bus pickup for the Boy Scouts that are in town but the metal and the sandbags are blocking the sidewalk, our crews moved the items off the sidewalk and into the homeowners yard. Please pickup. Thanks Jill.

closed #166580

City Construction Projects

2907 S McIntyre Dr, Bloomington, Indiana, 47403

Case Date:
11/19/2018

New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see

closed #168153

City Construction Projects

1700-1748 W 17th St, Bloomington, Indiana, 47404

Case Date:
4/17/2019

Unsafe and hazardous conditions for pedestrians to cross the road to use the modified 2 west bus route in a low income area. Additionally line of sight issues with improper construction truck storage

closed #168788

City Construction Projects

3744-3812 E 10th St, Bloomington, Indiana, 47408

Case Date:
6/3/2019

The drilling contractors on 10th Street near Barrington Place and Woodbridge Apartments appears to have left potentially hazardous items on the ground. At the very least, these items constitute unsightly and unwanted litter. At worst, the items could be leaking in an area that ultimately drains to Griffy Lake via a nearby stream located downslope.