Sidewalk & Curb Complaints
3333 E Moores PIKE
- Case Date:
- 4/11/2020
Sidewalk is falling into road. Had to dodge a brick the other day.
Sidewalk is falling into road. Had to dodge a brick the other day.
The sidewalk was removed here last year for gas line connections to new apartments in this area. However, the sidewalk has not been patched after removal.
Sidewalk is raised about 5-6 inches by tree root, making it dangerous for pedestrians and individuals with walkers or wheelchairs. This is on the north side of East Canada drive at 2519.
The sidewalk is damaged on The Stands Dr. across from Autumn Drive ever since the city removed a street tree at that location.
The sidewalk on the north side of East Moore's between Olcott Rd to just west of Fenbrook is narrow and too close to the road. The road itself is narrow there and there's a lot of fast traffic. It's dangerous, several times I have had trucks speeding by inches from me. West of Fenbrook the sidewalk is crumbling into the road.
There is a lot of vegetation growing across the sidewalk covering more than half the sidewalk and it's invasive stuff, so it should be pulled not just cut back. This extends along the city owned property and somewhat to the adjacent home owner's property.
Sewer line Digging in yard has caused large amounts of fresh mud on sidewalk. Ongoing problem of errosion for months
The trash and recycling bins were on the sidewalk in front of the house this evening (Thursday). Since the bins were full and their trash day is Monday, I suspect the bins were placed out 4 days early.
This section of sidewalk on the west side of Sare Rd between Rogers and the SOCC parking lot entrance has been missing for years. It impedes mobility for persons with mobility disabilities and could cause a problem for someone with limited sight. I suspect that Vectren removed the sidewalk and didn't replace it. Thanks, John
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.