Street Snow Removal
717 S Rogers ST
- Case Date:
- 2/7/2022
Streets around the old hospital have been neglected in snow plowing. There are elderly residents who live in the area and an ambulance has been called in at least one instance with the snow. Residents would like the streets to be clear of snow.
Street Snow Removal
2718 S Pinehurst DR
- Case Date:
- 2/6/2022
Our street is full of snow and it seems like no trucks have came to clean it up. Please have someone come plow the snow from the roads, or salt it. there is speed bumps in the road so me sure to miss those. Thank you.
Street Snow Removal
2455 E Rogers RD
- Case Date:
- 2/5/2022
Who is responsible for clearing these sidewalks? The multiuse path on Rogers is pretty useless if the sidewalk is not also clear
Street Snow Removal
2455 S Maston CT
- Case Date:
- 2/4/2022
We still can’t get out of our cul de sac because there has been no snow removal.
Biking & Walking
932 S Henderson ST
- Case Date:
- 2/4/2022
The reflective signs designating the runoff/curb/flower boxes on Allen Street are white. They completely disappear in the snow. Several cars have driven into and over the curbs. Large yellow/green/red signs are needed to make these less hazardous.
Street & Traffic Signs
932 S Henderson ST
- Case Date:
- 2/4/2022
The reflective signs designating the runoff/curb/flower boxes on Allen Street are white. They completely disappear in the snow. Several cars have driven into and over the curbs. Large yellow/green/red signs are needed to make these less hazardous.
Sewer Problems (Storm Sewers)
3210 E Kensington Park DR
- Case Date:
- 2/4/2022
Snow plows bury the one drain for our whole street! After more critical issues are handled right now, can the one outside of our house be cleared so flooding when the snow melts doesn't become a major issue? Thank you!
Trails
2104 E Rock Creek DR
- Case Date:
- 1/28/2022
So when we have a 5 ft concrete sidewalk WE are responsible to clear it for the kids. As propertty owners. Then the city replaces it with 10 ft of asphalt, assuring us that we are no longer responsible for it. “We will take care of it, Parks and Rec will deal with it in a timely manner”. We get 0.7 inches of snow, the path is icy, and the city is nowhere to be seen. We have to clear the now TEN ft of path ourselves to avoid being sued. FU Hamiltlon! This is is less than an inch!
Street Snow Removal
2012 E Cheyanne LN
- Case Date:
- 1/28/2022
Snow removal/deicer -- thank you!
Blocked Sidewalk
914 E University ST
- Case Date:
- 1/19/2022
This car consistently either blocks the sidewalk or parks in the street without a permit