City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
Excessive Growth
301 E University ST
- Case Date:
- 12/17/1998
Someone has cut on a tree and stacked it on the sidewalk.
Biking & Walking
301 E University ST
- Case Date:
- 8/10/2016
Vegetation blocking sidewalk
Blocked Sidewalk
301 E 3rd St, Bloomington, IN 47401, USA
- Case Date:
- 8/20/2021
Car parked on sidewalk and blocking ADA ramp. On northeast corner of 3rd and Lincoln
Street Trees
3003 E Winston St Bloomington, IN 47401, USA
- Case Date:
- 6/25/2023
A tree planted by the city a few years ago was damaged by the storm today, June 25 2023. A large branch has fallen, blocking the sidewalk. It is too large for us to move. The city will have to remove it and probably plant a new tree.
Trash
3001 S Forrester ST
- Case Date:
- 9/18/1998
Other/Trash: Lady said the 4 bags are tagged. She moved the bags off the sidewalk to the corner vacant lot. Will you pick them up?
Blocked Sidewalk
300 W Gordon PIKE
- Case Date:
- 1/17/2017
Sidewalk impassible in front of old water treatment plant on S Walnut across from Royal (west side of street.
Blocked Street
300 S Smith RD
- Case Date:
- 8/21/1995
Needs to install a mail box in the sidewalk.
Street Snow Removal
300 S Fairview ST
- Case Date:
- 1/25/2011
snow and ice still have not been shovelled for entire street (few exceptions) has called in to complain before
Street Snow Removal
300 S Fairview ST
- Case Date:
- 12/28/2010
snow and ice not removed on sidewalk throughout street