City Construction Projects
1969 S Henderson ST
- Case Date:
- 4/18/1997
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.
City Construction Projects
1604 S Rogers ST
- Case Date:
- 4/7/1997
A CONCERNED CITIZEN CAME INTO THE ENGINEERING DEPARTMENT REGARDING THE CULVERT PIPE INSTALLED ON SOUTH ROGERS STREET ( A FEW YARDS NORTH OF #1604) AT THE RAILROAD TRACKS. THE GROUND/ROAD ON THE SOUTHEAST CORNER IS ERODING AWAY CAUSING A STEEP DROP OFF. REYNOLDS COMPANY DID A ROAD PROJECT AT THIS AREA APPROXIMATELY LAST YEAR OR THE YEAR BEFORE. THE CITIZEN IS CONCERNED THAT THE ROAD WILL CONTINUE TO ERODE AWAY, COULD SOMEONE FROM THE ENGINEERING DEPARTMENT TAKE A LOOK AT THE PIPE.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
1809 E Southdowns DR
- Case Date:
- 10/4/1999
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
City Construction Projects
2100 S Bent Tree DR
- Case Date:
- 2/3/1999
Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.
City Construction Projects
925 S Ballantine RD
- Case Date:
- 10/22/1998
The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.
City Construction Projects
2610 S Rockport RD
- Case Date:
- 8/31/1998
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.
City Construction Projects
2308 S Cutter CT
- Case Date:
- 7/8/1998
(Please call the above complainant for additional information). Says Utilities dug a hole to install a manhole and did not finish grading around it.