Sewer Problems (Storm Sewers)
1205 S Fess AVE
- Case Date:
- 8/28/2013
He is making improvements to the property for the property manager (Linda Quillan at Action Property Management) and says we need to do something about the water that comes in the back yard and floods the basement.
Excessive Growth
S Washington ST
- Case Date:
- 8/28/2013
3rd and S. Washington, 8 foot tall weeds
Utilities Construction
6000 S Handy RD
- Case Date:
- 8/28/2013
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
- Case Date:
- 8/28/2013
Mark Todd from 5874 S. Handy Rd called and said fence and fence post was damaged when work was done. He says he will fix and will bill us, needs to know who to bill and where to send bill to. His phone # is 812-369-8300.
Excessive Growth
1300 E 1st ST
- Case Date:
- 8/27/2013
Sewer Problems (Storm Sewers)
1918 E Ruby LN
- Case Date:
- 8/27/2013
This complaint was emailed to Nancy Axsom (in engineering dept.) from the customer to remove debris from storm sewer ditch. Nancy told customer he was on a list to have debris removed. She notified the customer by email of this and emailed me a copy of the emails.
Sewer Problems (Sanitary Sewers)
560 E Hillside DR
- Case Date:
- 8/27/2013
Sewer back up
Sewer Problems (Sanitary Sewers)
346 S Rogers ST
- Case Date:
- 8/27/2013
Customer had sewer back up on 8-23-13 CBU ran sewer line, it was ok ( see case # 133616 ) on 8-26-13 customer calls back and says Roto Rooter tv'd line and said problem is damage to sewer line where it connects to main.
Utilities Construction
E 17th ST
- Case Date:
- 8/27/2013
ON 17TH STREET EAST OF WALNUT GROVE, THE PAVEMENT IS SINKING IN DUE TO A STREET CUT
- Case Date:
- 8/27/2013
The light pole on the east side of the square in front of superior shoes is very loose at the base.