closed #179583
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots
Construction site utilizing alleyway creating potholes and divots
Why there detour sign on seventh street
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
Pavement in even, swerving cars due to pavement issues almost caused several accidents
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark
Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.
AEG was working again in our tree plot yesterday. The storm drain just west of our house, at the alley, is caked with mud and trash. This is the third time they have dug in this plot and the third time they have left a mess. We aren’t cleaning it up this time.
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!
please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.
This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired