uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (115277)

closed #129149

Potholes, Other Street Repair

Case Date:
10/5/2012

The stree sign is down at the South end of Baldwin Drive where it intersects Fenbrook.

closed #129150

Graffiti

Case Date:
10/5/2012

This is my second notification in 6 wks: on First St at Highland graffiti was left on both the street and the sidewalk. I believe both are the purview of the city. Will you clean it up, please? The street graffiti is pro Marx and the sidewalk graffiti is multiple f**ks. Thank you.

closed #129202

Open311 API Key Request

Case Date:
10/10/2012

We are writing a application to work with Open311 and would like to use your test server!

closed #129203

Potholes, Other Street Repair

Case Date:
10/10/2012

Address: 2907 Spangle Rd, Bloomingotn. There is a grate near the curb at the end of my driveway. The concrete is beginning to erode around the grate making it hazordous to walk and eventually drive on. I'm afraid someone will sprain an ankle if not repaired. Thanks.

closed #129217

Potholes, Other Street Repair

Case Date:
10/11/2012

There are a few pot holes in the alleys/entrances of our apartment buildings located at: 303/315 E. 8th St and 417 N. Grant St.

closed #129218

Potholes, Other Street Repair

Case Date:
10/11/2012

On Walnut Street northbound in front of the pet store near BHSS, there is a water/utility cover that is open or raised up in the street. I saw it yesterday, but hit it in the dark this morning.

closed #129228

Potholes, Other Street Repair

Case Date:
10/11/2012

Before bad weather gets here, can you PLEASE repair the pothole on Covey Lane right where it intersects with Thornton Drive? The hole just keeps getting bigger!! Thanks so much!!!

closed #129229

Traffic Related Complaints

Case Date:
10/11/2012

Because of the construction happening on S. Walnut I was recently stopped for almost ten minutes at the intersection of Walnut and Second. This is a road I use daily and I am accustomed to some delays. However, this evening (Thursday, 10/11/12 at about 6:40) the construction crew parked a cement mixer diagonally across the intersection making any driving impossible. There was no warning that this was taking place and no attempt to redirect traffic. After sitting through around 7 light cycles my boyfriend approached the driver at the head of the line and asked if they would mind turning right and going oh of their way so that he cars lined up with us could make our way around he impass. In the future I would suggest scheduling these events so temporary detours may be set up. Expecting citizens to spontaneously adjust to major construction set ups is unreasonable.

closed #129230

Fire Hazards

Case Date:
10/12/2012

Damaged fire hydrant, 2nd and Grant

closed #129232

Traffic Signals

Case Date:
10/14/2012

The stop sign at 11th and Grant is down, and people aren't breaking at either intersection.