uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (120500)

closed #200780

Utilities Yardwork

654 S Solitude CT

Case Date:
2/7/2025

water from bathroom and toilet not going down.

closed #201277

Utilities Yardwork

724 S Park AVE

Case Date:
3/3/2025

Our yard was dug up this winter probably to access that pipe, but it’s been left with just dirt all over our grass and our sidewalk

closed #202206

Utilities Yardwork

616 S Swain AVE

Case Date:
4/22/2025

New hydrant has deep erosion ditch that is hazardous

closed #203468

Utilities Yardwork

Arden Drive and Windsor

Case Date:
6/17/2025

waste of city water

closed #179529

Utility Construction Projects

E Winslow Farm Dr, Bloomington, IN 47401, USA

Case Date:
4/13/2022

Reported by Joanne Freeman to me. Unfinished AT&T fiber project started last summer has left exposed conduit, foot-deep holes and sand fill in rights of way (meaning grass doesn't grow). She wants City inspectors to contact Michael or Sharon Dalton who are the property managers for the subdivision to get this situation addressed. AT&T has been unresponsive to neighborhood contact. Pegasus contact info is (812) 824-3239 and pegasus.properties.gmail.com. They can provide more detailed information.

closed #179592

Utility Construction Projects

Case Date:
4/21/2022

The electrical poll is damaged and looks to be falling.The poll is on Hillside Drive Bloomington Indiana.

closed #179861

Utility Construction Projects

316 E Cottage Grove AVE

Case Date:
5/14/2022

Att box knocke I Br

closed #180579

Utility Construction Projects

3857 S Mill Stone WAY

Case Date:
7/11/2022

2 things: (1) large city tree at SE corner of Sare and Mill Stone Way severely damaged, broken and dangling branches causing hazard for drivers -dangerous, needs immediate attention; (2) damage caused by water main being hit during Smithville contractor work, the same corner is in disarray, lawns torn up, streets are a mess, and city drain affected.

closed #181002

Utility Construction Projects

3304 E Winston ST

Case Date:
8/12/2022

AT&T left large holes in ground after installing high speed internet.

closed #181095

Utility Construction Projects

2200 E Moores Pike, Bloomington, IN 47401, USA

Case Date:
8/18/2022

AT&T lines need to be resupported. They were sagging and a truck snagged them. It broke a power pole that Duke replaced but the AT&T lines are just temporarily tied up. The whole line is a mess from High Street east with broken poles and sagging lines.