closed #171454
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.
Huge hole in the road on the corner of 8th and Fountain.
Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.
This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.
Why there detour sign on seventh street
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
Pavement in even, swerving cars due to pavement issues almost caused several accidents
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark
Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.