uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (129679)

closed #125251

Other

Case Date:
3/8/2012

asdfasdf

closed #125248

Parking on Unimproved Surface

Case Date:
3/8/2012

Vehicle parked in the grass at this location.

closed #125247

Temporary Signage w/o permit

Case Date:
3/8/2012

Oversized rental sign without a permit, there are 16 units at this location so a temporary sign permit is needed.

closed #125236

Parking Permits

Case Date:
3/6/2012

The Elementary School Crossing located at S. High and Greenbriar St. 2 light fixtures of the in-street School Crossing flasher have been knocked out. Traffic has one of the lights, and the other on is in the Parking Office on my desk.

closed #125209

Parking Meters and Citations

Case Date:
2/29/2012

200 N. Lincoln - combo Zone 4/2hr parking sign on Northeast side of block-the Zone 4 part of the sign has been removed (rubbing and scraping it off).

closed #125191

Parking Meters and Citations

Case Date:
2/27/2012

Missing Neighborhood Sign (Zone #1) located at 900 S. Ballentine (southend of block/westside of street)

closed #125093

Parking Meters and Citations

Case Date:
2/16/2012

200 W 11th St/north side 2 hr parking sign down. Post broke off at ground

closed #125024

City Construction Projects

Case Date:
2/7/2012

Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east

closed #125753

Website & Web Services Feedback

Case Date:
4/16/2012

ureport custom fields should be displayed on top in a block. then default fields. then contact info fields.

closed #125730

Blocked Street

Case Date:
4/16/2012

I bicycle commute from Park Ridge East to Indiana Ave. following the bicycle path along the railroad. Due to the bypass construction last week I had to cross the working site where the path meets the bypass, or one time I crossed at the light on 10th street. This morning my crossing was muddy. Detours for bicycles require more effort than detours for cars, especially in a hilly town like Bloomington. Moreover, they might require bicyclist to engage in high traffic stretches of roads or unsafe roads, as in the case I describe above. It appears to me that inconveniences and changes affecting car drivers are taken into account when construction works are planned. It does not appear to me that the needs of bicyclist are ever taken into account in these occasions. What is the plan you have in place for those following my commuting route? For how long I will have to expect construction on the bypass affecting my commute? Thank you, Stefano Fiorini