City Construction Projects
418 W Joy ST
- Case Date:
- 1/17/1996
Wants information regarding proposed development at the intersection of S. Rogers and Rockport Road. Also, upset that these roads and sidewalks may be widened unnecssarily and the elderly do not need extra taxes. The speed limit on rogers should be lowered too.
City Construction Projects
1204 E Wylie ST
- Case Date:
- 5/17/1995
A section of sidewalk was removed last fall and was never replaced.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
City Construction Projects
2380 E Linden Hill DR
- Case Date:
- 6/17/2003
City Construction Projects
615 E Atwater AVE
- Case Date:
- 9/21/2001
Address approx. for entry. Street Dept. received a phone call from citizen regarding a street cut that has caved in on Atwater between fess and Henderson.
City Construction Projects
2202 S Rockport RD
- Case Date:
- 4/18/2000
There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.
City Construction Projects
5717 S Rogers ST
- Case Date:
- 2/24/1998
Mr. Stidd called and said that the road at 5717 S. Rogers was supposed to have been cleaned up by CBU contractor, but it is extremely dusty and dirty.
City Construction Projects
1427 W Allen ST
- Case Date:
- 1/1/2022
Please have public streetlights installed at the entrance of Whittington Commons on Allen Street. It is very dark, and it is difficult to see entrance. I know this is a private road within WC, but Allen is a public street and it is a hazard to not have streetlights at entrance given the public sidewalk crosses the entrance. Light it up!
City Construction Projects
2225 S High ST
- Case Date:
- 4/23/2022
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?
City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.