closed #208496
Sidewalk Snow Removal
215 E 9th ST
- Case Date:
- 2/8/2026
No attempt to remove snow after two weeks.
No attempt to remove snow after two weeks.
Sidewalk still hasn't been shoveled 2 weeks after the snow. This is a street with fairly high pedestrian and car traffic.
Snow blocking the sidewalk along E Hillside Dr.
at 2 weeks after the snow, the sidewalk if not shoveled
UnCleared sidewalks both Highland and 1st St
Uncleared sidewalk
Uncleared sidewalk not possible to pass without walking on the street
Unclear sidewalk difficult to pass
several sidewalks on the south side are not shovelled. The south side has the only sidewalks
Both retirement homes along e moores pike by clarrizz have not shoveled the sidewalks.