closed #100935
Recycling
219 E Allen ST
- Case Date:
- 6/4/2004
recycling and non recycling mixed, items not collected in program, not sorted
recycling and non recycling mixed, items not collected in program, not sorted
One of the tree plots/rain gardens along E. Allen St. has lots of branches and debris in it that need to be cleaned.
Recycable items not properly sorted.
Motor oil?, brush & logs.
2 trucks parked in backyard.
weeds and brush overgrown badly, obscuring stop sign, encroaching, just plain dangerous
Our trash was not picked up on Thursday 6/26, our recycling was picked up. Normally we could wait, however we lost power for over 2 days and our container is filled with perishable food. I have called multiple times today and gave not been able to speak to anyone. Message says they are closed. Please help, we will have an extreme health issue if this is not resolved ASAP. Thank you,
College Movers along with many other derivatives of that name, all owned and operated Braden Trimpe of Bloomington. Apparently, he believes he can put his signs everywhere. This is on Moores and Hillside. Please begin citing these abusers.
Walk sign to cross high street came on with audio "cross high street" at the same time the left arrow of traffic on hillside was given a protected green. I confirmed both white wall sign, audio crossing notice, and the green protected turn light were all on simultaneously. Almost got struck by a turning car (car making left turn from east hillside northbound onto high street). Request was made using the pedestrian cross button on the northwest corner of hillside and high. Thank you for looking into this.
The north/south stop light at High St/Moores Pike is not programmed correctly. The southbound traffic always goes through the left hand turn signal phase of the light, regardless if there is a car in that lane or not. This creates extended delays for the northbound traffic, especially since there is a no turn on red sign for northbound on High. This is has been like this for months, but it’s especially important now that the Sare Road construction project is rerouting a high volume of cars into High St.