Utilities Yardwork
4021 E Morningside DR
- Case Date:
- 3/29/2020
Fire hydrant was recently replaced in front yard. Big hole was dug as part of the work. Was filled in (Friday?). Ground where dug now is several inches obviously below rest of ground level. Assuming settled with aid of rain. Needs leveled.
Utilities Yardwork
1612 W 8th ST
- Case Date:
- 3/29/2020
Power or communication cables are tied down to a seemingly dead tree on the back of my property. Also large growth on neighboring pole in my front/side yard.
Utilities Yardwork
4021 E Morningside DR
- Case Date:
- 5/19/2020
Area near the hydrant replacement remains significantly depressed. Is a trip/fall hazard. I was waiting to see if grass would sprout and what that effect would be, but exceptionally minimal grass has grown despite significant moisture and coverage.
4021 E. Morningside Drive
Utilities Yardwork
3617 E Post RD
- Case Date:
- 2/23/2024
I would like to know who installed this on my property. It’s leaking e. coli and that needs to be fixed.
Utilities Construction
115 E Cottage Grove AVE
- Case Date:
- 4/19/2019
I am a resident of Bloomington and live at:
3445 Constance Avenue
I am enrolled in a college course called Environmental Technology.
I have a project to perform and was asked by my instructor for the following items of the city where I live, Water Treatment Facility.
1. Types of pipe material
2. Initial cost of the water treatment system
3. Design water flow rate
4. Number of water towers and pumping stations
5. Problems with the system since it was built in 1967
6. Change in elevation from highest to lowest compared to where the location of water treatment facility
7. Types of disinfectant used
I found three websites with a lot of information that I need but is there any other sites that would give me some of the answers to the questions listed above?
I called the site at 812- 824-9311 with little success.
thank you for your time.
Sincerely,
Joe Schartz
Utilities Construction
2700 N Blue Ridge CT
- Case Date:
- 5/21/2013
On Friday May 17 white flags were placed on both sides of our street - Blue Ridge Drive. Is there some type of work planned for this area? Thanks,
Karen Watkins
Utilities Construction
211 S Kimble DR
- Case Date:
- 8/13/2013
During heavy rain, storm drain is not draining fast enough
Utilities Construction
103 N College AVE
- Case Date:
- 11/4/2013
Customer says water is coming into basement from underground, not sure why. Please check on this.
Utilities Construction
222 W Kirkwood AVE
- Case Date:
- 11/12/2013
Water coming out of bldg.
Utilities Construction
3963 N Ironwood CT
- Case Date:
- 11/13/2013
customer hears water running in the storm drain in front of his house.