closed #59115
City Construction Projects
1150 S Clarizz BLVD
- Case Date:
- 2/9/1999
Clarizz Boulevard gate open despite local plan for site that requires it to be closed until mid April. Please take legal action.
Clarizz Boulevard gate open despite local plan for site that requires it to be closed until mid April. Please take legal action.
SANITARY SEWER BACKUP IN BASEMENT
LEAK AT METER PIT
STORM INLET NEEDS CLEANED OUT, BACKS UP WHEN IT RAINS
MANHOLE LID OFF
THERE IS A RETENTION POND THAT IS NOT DRAINING CORRECTLY.
NEEDS GRAVEL IN DRIVEWAY. CBU HAD REPLACED HIS WATER SERVICE AND HAD DISTURBED HIS DRIVEWAY.
WATER STANDING IN STREET MOST OF THE TIME.
S
At the end of the property (3536 Bainbridge) the bushes have overgrown onto the street; trash and limbs under the bushes.