closed #169891
Trails
1900 E Arden DR
- Case Date:
- 8/15/2019
A man was very aggressive towards me on the Limestone trail this morning
A man was very aggressive towards me on the Limestone trail this morning
Tree down on Bryan Park trail neR bathroom.
Down tree blocking path
the bushes along East southern eastern side of the trail at this park is taking over the path, people are running on the side in the grass creating mud creating a mess
There has been some construction on the trails near the Wesley Sports complex. I use the trail to commute to work by bike every day and noted its bad constitution - especially after heavy rain. I had hope for some improvements but the 'closed for construction' signs have been removed and while the trail is now wider it seems like the construction has been stopped half way. The trail is still very sandy / muddy and parts are very soft so that my bike sinks into the sandy surface which makes it very uncomfortable to rise and also somewhat unsafe. Is the construction already done or just paused?
This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.
Light number 56 on the B-Line is not working. Its located across from Cardinal Spirits between Allen and Dodds.
A tree on southside of road, between gate and parking lot, has partially fallen and is hung up on a tree on northside of road. Leaning enough to possibly prevent vehicles with bikes on top from going past.
So when we have a 5 ft concrete sidewalk WE are responsible to clear it for the kids. As propertty owners. Then the city replaces it with 10 ft of asphalt, assuring us that we are no longer responsible for it. “We will take care of it, Parks and Rec will deal with it in a timely manner”. We get 0.7 inches of snow, the path is icy, and the city is nowhere to be seen. We have to clear the now TEN ft of path ourselves to avoid being sued. FU Hamiltlon! This is is less than an inch!
Dead deer at trail head