City Construction Projects
1004 W 1st ST
- Case Date:
- 10/10/2022
The contractor that did the construction in the basement did it without permits, it also violates the fire code. This facility treats disabled individuals struggling with mental health and addiction.
City Construction Projects
1206 S Woodlawn AVE
- Case Date:
- 9/10/2022
I am requesting that a speed bump and a flashing speed indicator be installed in a location along W Woodlawn Ave, somewhere between S Weatherstone Ln and E Wilson St. The speed limit on S Woodlawn Ave is 25 MPH, but the average vehicle's speed in front of my approximate address is closer to 45 MPH, with many vehicles regularly reaching speeds over 60 MPH and even 80 MPH at least daily. The reason why the speed limit is 25 MPH on S Woodlawn Ave is because of its proximity to Indiana University foot and bike commuters, Bryan Park, the Bryan Park Pool, a bus stop, and Union Elementary School. In addition to these elements, S Woodlawn Ave is also hilly which contributes to dangers associated with limited lines of sight between vehicles and pedestrians. Being a thoroughfare between Hillside Ave and streets north of it, traffic naturally flows faster than 25 MPH especially with the only stop sign between 1st St and Hillside Ave being at Sheridan Ave. Drivers frequently “floor” their vehicles through S Woodlawn Ave, and the police speed enforcement seems to never pull anyone over for speeding. For the above reasons, the current traffic pattern on S Woodlawn Ave is incompatible with its intended use. Installing a speed bump and a flashing speed indicator (for both northbound and southbound traffic) will hopefully greatly reduce thoroughfare excessive speeds. I am worried that this is a formula for someone to get hurt and it is only a matter of time unless the City does something about this. Please at least conduct a traffic study. Thank you for receiving my note, and I will be following up on this.
City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
323 1/2 S Lincoln ST
- Case Date:
- 1/27/2023
The signs giving instructions for the back-in parking should have the diagram (map) rotated 180 degrees. The standard for such diagrams is to have the direction of movement going UP the page, not down. Also, the parking spaces are shown on the right side of the diagram; it looks like you are instructed to front into spaces on the right (the small arrows pointing down are hard to notice, while the up-&-right arrow is large).
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
1019 E Miller DR
- Case Date:
- 4/18/2024
There is a road drain across the street from me, North side, and I notice the drain there has the beginnings of cavitation, which if it goes, could be dangerous
City Construction Projects
1020 S Woodlawn AVE
- Case Date:
- 6/10/2024
Why there road work sign near Bryan park pool
- Case Date:
- 12/18/2017
I am writing to complain about being towed from Bedrak Cafe parking lot at 8:30p by Tow Time and being charged $215. This is an extortion rate. The Bedrak Cafe has signs posted but you cannot see them when it is dark. They are tiny and dark in color. We were not given warning that we would be towed and then to be charged such an exorbitant amount is unreasonable. My fiance met me and we had 2 other friends that parked there. We were gone from our cars less than 20 minutes and 3 of the 4 cars were gone and the 4th one was in the process of being towed. The towing company has to be lying in wait for anyone to park there and then stealing your car and charging you this astronomical price. He then basically threatened us stating if we did not pay him immediately that it would cost us $20-40 more and that we would have to make an appointment to get the cars back at their convenience. This is extortion, we felt intimidated, and backed into a corner. Then on top of this he tells us that he has a contract with the owner of Bedrak Cafe to keep the lot cleaned out of all cars except when they are open. So how much of a kick back is Bedrak getting from Tow Time. And where is Tow Time located. I could not find a Bloomington address for Tow Time. What is the city regulations on parking and fees for being towed? This makes the city of Bloomington look very bad. No one will want to go down town if you cannot park in a lot where the business is closed. This is outrageous!