Utilities Construction
1210 1/2 S Walnut ST
- Case Date:
- 6/26/2018
Hello,
There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well.
As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street).
Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue.
Sincerely,
Brandon Fricke
Blocked Street
121-199 W Hoosier St, Bloomington, Indiana, 47403
- Case Date:
- 4/5/2019
A camper has been parked on W Hoosier St on the for over a week, taking up the road the neighborhood uses for extra parking. My neighbors don't know who it belongs to.
Abandoned Vehicle
121 West Allen Street
- Case Date:
- 7/30/2018
Vehicles from the auto salvage yard parked on the street for months, in various stages of being dismantled.
- Case Date:
- 5/24/2007
can exceeds size limit
- Case Date:
- 7/31/2003
no sticker
- Case Date:
- 6/13/2002
no sticker
Water Utility Problems
121 W Hoosier ST
- Case Date:
- 4/26/2019
We have had decreasing water pressure since lunchtime today. Now we have no water coming into the house.
Sidewalk Snow Removal
121 W Allen St
- Case Date:
- 1/7/2025
Very large mound of plowed snow blocks the critical bike/ped access on W Allen at the bridge between Walnut and Morton. Thank you in advance for resolving (and hopefully not letting it keep happening).
Street Snow Removal
121 W Allen St
- Case Date:
- 1/14/2025
Snow has been plowed into large piles on this portion of Allen, making it impassable. This is part of a bicycle greenway, but bikes cannot get through.
Street Snow Removal
121 W Allen St
- Case Date:
- 1/16/2025
W. Allen St (Particularly the section between the closed bridge and the B-Line trail) hasn't been cleared making it extremely difficult to navigate on foot or bike. Also . the crossing median/island where Allen St. crosses Walnut St. is full of snow making it useless in assisting bikes and pedestrians with crossing Walnut.