closed #131167

City Construction Projects

1016 S Mitchell ST

Case Date:
4/2/2013

A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.

closed #129266

City Construction Projects

Case Date:
10/16/2012

i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you

closed #74542

City Construction Projects

1924 E Marilyn DR

Case Date:
4/5/2011

Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.

closed #102185

City Construction Projects

1124 S College Mall RD

Case Date:
10/16/2003

Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.

closed #47159

City Construction Projects

5900 N MAPLE GROVE RD

Case Date:
11/8/2001

Fax was received stating that Mike and Julie Donham were upset with the final yard work at 515 S. Washington St. in Bloomington, IN. They feel add'l. topsoil and seeding are needed along sidewalk and 2 depressesions needed on south side of house.

closed #57792

City Construction Projects

309 N Walnut ST

Case Date:
6/16/1999

sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)

closed #116841

City Construction Projects

423 E Kirkwood AVE

Case Date:
7/2/1998

Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.

closed #116842

City Construction Projects

423 E Kirkwood AVE

Case Date:
7/2/1998

Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.

closed #118795

City Construction Projects

304 S Rogers ST

Case Date:
8/28/1997

After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed. See letter

closed #118910

City Construction Projects

425 E KIRKWOOD AVE

Case Date:
8/11/1997

Citizen is manager of Jiffy Treet. Says sidewalk in front of business is very bad and several older people have almost tripped. Did not realize property owner is responsible....he rents from Claire Young, 812-597-5711. JA told him we'd have Street check it out (Tom Goldman).