uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (54)

closed #182158

Blocked Street

2923 S Rogers ST

Case Date:
11/29/2022

I forgot to report this at 10pm last night when I observed it. I have not gone by this morning to see if it is still an issue. But, as of yesterday, S. Rogers Street was a mess from the construction site. It was covered in gravel and mud. It was very dangerous in a car and would likely cause bicycle and motorcycle accidents. They apparently do not have a tire washout station setup because they dragged the mess into the road and made it everyone else's problem.

closed #183310

Blocked Street

Case Date:
4/2/2023

You’ve done nothing over past several years to address culvert issues at 2001 east hillside. You weakened soil by doing nothing and now there’s a very big tree about to fall across high st. Enjoy!

closed #182259

City Construction Projects

E 19th St, Bloomington, IN, USA

Case Date:
12/12/2022

The apartment construction by Varsity properties on East 19th Street has caused an excessive level of dust on the road. Whenever a vehicle drives by, the dust becomes airborne. In addition, the dust also falls on to nearby vehicles, causing a significant amount of scratches and inconvenience. No effort has been made to clean up the street. It is especially disgusting to walk on when it rains.

closed #175971

City Performance

3230 S Walnut St, Bloomington, IN 47401, USA

Case Date:
6/1/2021

On Saturday, May 29, 2021, this City-owned site was producing a lot of loud construction noises after 10:30pm. The noises included audible beeping from trucks or equipment backing up and loud banging noises, possibly the sound of either dump truck tailgates slamming on the bed of the trucks or some sort of excavator hitting the ground repeatedly. City ordinances only allow construction noises up to 10pm. Can the City be a better neighbor and not produce these loud, annoying noises at such late hours of the day?

closed #184539

Debris Removal

Case Date:
7/10/2023

I am one of the Utility Dept. volunteers checking and clearing storm drains in Sycamore Knolls. I and my fellow volunteers having been clearing storm drains at the intersection of Queensway and Montclair, Queensway from High to Montclair, and Sussex Dr from Queensway to Montclair. We have been making piles of plant and street debris near some of the drains. They are now getting large and because of their mix of plant and asphalt debris cannot put them in the weekly waste pickups. Would it be possible for a city street crew to remove these piles near the following locations? North sides of the Montclair and Queensway, Southside of the Chelsey and Queensway, and Sussex Dr. near 1912-1919 and 2216 -2219 Thank you

closed #184824

Debris Removal

2375 1/2 S Walnut ST

Case Date:
7/30/2023

this whole area along walnut where community dealrship and jeep and kia, are the curbs and street are filled with grass and debris. who ever mows this does it on sat afternoon and sundays. they always fill the street with grass. it clogs up the sewer drains and looks awafull. i talked to someone at the dealership a couple of times. i told them they need to talk to the mowing guy. but they never do anything. thx hope it can get cleaned up, and find out whos doing the mowing and teel them not to do this.

open #188153

Debris Removal

111 N Hampton CT

Case Date:
4/25/2024

house next to have pool filled in and have mud in street. could a street sweeper clean it?

closed #174484

Drainage or Runoff

1601 S Rogers St, Bloomington, IN 47403, USA

Case Date:
1/12/2021

Silt fence has been removed; dirt will easily runoff into stream

closed #178109

Drainage or Runoff

2713 E Rock Creek CT

Case Date:
11/8/2021

Large tree trunk in Jackson Creek. Another big chunk about to go down. Potential issue with flooding.

closed #179535

Drainage or Runoff

Case Date:
4/14/2022

Last night there was mud and new stones, as well as pretty deep ponding, on W. 17th St. in front of Tri-North Middle School (facing north). Perhaps it’s the first big rain since that project finished? The water, mud, and stones were just pouring down the driveway onto Tri-North. The construction head of the Tri-North project wasn’t very proactive about erosion control from the beginning of the project last year. And the designers must not have been careful enough when planning for rain.