uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (63)

closed #56366

City Construction Projects

1809 E Southdowns DR

Case Date:
10/4/1999

STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK

closed #63397

City Construction Projects

1901 S Weimer RD

Case Date:
6/23/1998

Ms Sudbury is unhappy with the amount of traffic that is using Wapehani Road as a cut-through from the Wapehani Hills development.

closed #186167

City Construction Projects

1907 S Sussex DR

Case Date:
11/1/2023

Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.

closed #74542

City Construction Projects

1924 E Marilyn DR

Case Date:
4/5/2011

Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.

closed #68215

City Construction Projects

1969 S Henderson ST

Case Date:
4/18/1997

ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.

closed #59168

City Construction Projects

2100 S Bent Tree DR

Case Date:
2/3/1999

Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.

closed #112096

City Construction Projects

2202 S Rockport RD

Case Date:
4/18/2000

There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.

closed #172047

City Construction Projects

2208 E Arden DR

Case Date:
3/22/2020

Hello -- this cover has a hole in it and that seems dangerous.

closed #179625

City Construction Projects

2225 S High ST

Case Date:
4/23/2022

A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?

closed #63048

City Construction Projects

2308 S Cutter CT

Case Date:
7/8/1998

(Please call the above complainant for additional information). Says Utilities dug a hole to install a manhole and did not finish grading around it.