Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Crown Castle Small Cell Tower Work 1314 N Eagleson Ave September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167 Location: In the ROW at the corner of E 17th St and the private driveway. Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work. Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day. Expected date and/or duration: 9/8/2025-3/8/2026 Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Poplars Redevelopment 400 E 7th St November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
ROW2025-11-2135 Indiana AVE from Cottage Grove to 13th January 24, 2026 to February 12, 2026
Closures on Indiana Ave for work on poles
Engineering
LINESTRING(-86.52693332190438 39.172647363872784,-86.5269547795765 39.17339177516254,-86.52695299154631 39.173440293305134,-86.5269470823199 39.17387264720841,-86.52694350609578 39.1743342582989,-86.52695244673798 39.174963597001295,-86.52698820947028 39.174962210819984,-86.5269917856125 39.17353228770159,-86.5269917856125 39.173390892032586,-86.5269703279404 39.172642321988945,-86.52693277701418 39.17264370821596)
ROW2026-01-2204 717 S Henderson January 26, 2026 to February 9, 2026
Alley closures for electric work
Engineering
LINESTRING(-86.52651812657633 39.15992603556103,-86.52651812657633 39.15980125055415,-86.52664150819105 39.159802637066036,-86.52663971999712 39.15977213398895,-86.52651991460655 39.15977352053315,-86.52651991460655 39.15969587636536,-86.52648594006817 39.15969587636536,-86.52648594006817 39.15977629352619,-86.52636792287151 39.15977213398895,-86.52637149909563 39.159802637066036,-86.52648772809836 39.159802637066036,-86.52648772809836 39.15992326257387,-86.52651633838244 39.15992326257387)
Bloomington Convention Center Skywalk Installation 302 S College Ave January 26, 2026 to February 9, 2026
Phase 2: Sidewalk and road closures on S College, south of 3rd St as part of the project located at location. This request is to accommodate installation of the connector or “skybridge” . The traffic control would be in place from January 26th, 2026 through February 12, 2026 with a detour for vehicular traffic to Rogers St and a pedestrian detour to Walnut St and 2nd St Phase 3: Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53488292459176 39.1635679969427,-86.53488292459176 39.164478104245234)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
ROW2025-10-2011 W 11th from W Fountain Dr. to N. Adams St. January 29, 2026 to February 12, 2026
This phase will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.55041877968597 39.17324963255015,-86.54980902406079 39.173241315132316,-86.54717509472646 39.173239928853576,-86.54717330653254 39.173213590377856,-86.54819254603996 39.17321636284109,-86.5482479783323 39.17321913530421,-86.5488577338756 39.173217749088536,-86.54984121056887 39.17321774912028,-86.55013804167255 39.173220521583346,-86.55042056771607 39.17322468029363,-86.55042056771607 39.17324963255015)
ROW2025-09-1983 Banneker CC. February 2, 2026 to February 23, 2026
Full Closure of W 7th
Engineering
LINESTRING(-86.54524698146696 39.16865761066893,-86.54524698146696 39.16862017983675,-86.54495015028142 39.168618793498666,-86.54495015028142 39.168656224331585,-86.54524519335493 39.168656224331585)
Duke Energy Conduit Boring 1210 W Arlington RD February 6, 2026 to February 18, 2026
-Install pole on the west side of W Arlington Rd, bore in cable in conduit under W Arlington Rd. -Close south bound lane of W Arlington Rd. Use guided pedestrian walk through on sidewalk on the west side of W Arlington Rd -Work will take two non-consecutive days between 1/13-1/30 and one day between 2/3-2/17.
External Project
LINESTRING(-86.5490983958452 39.18080347665267,-86.54864046606082 39.180194958969196)