Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Hopewell Project South Morton Street from West 1st Street to West 2nd Street. August 7, 2023 to November 30, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
1st Street Reconstruction Project 1st Street between South College Ave to South Rogers Street March 18, 2024 to November 30, 2024
Closure of 1st Street between South College Ave to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53860272873037 39.15942790212222,-86.53504216360619 39.15940182915014)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
1st Street Reconstruction Project West 1st Street Between South Fairview Street to South Rogers Street May 13, 2024 to November 30, 2024
Closure of 1st Street between South Fairview Street to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53873635585423 39.15942941125837,-86.54245334738789 39.159439631532734)
Downtown Street Maintenance Project 6th Street from Walnut to near Indiana Ave. August 26, 2024 to December 2, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53363224373408 39.16561155500605,-86.52690403825018 39.165552529069174)
Downtown Street Maintenance Project College from 4th Street to 11th Street August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5347999512804 39.17329156881223,-86.53484833322103 39.165571947686345)
Downtown Street Maintenance Project Walnut Street from 3rd Street to 11th street. August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53356436993373 39.17321867995096,-86.53359843186503 39.164504105324795)
Downtown Street Maintenance Project 4th Street from Madison Street to Indiana. August 26, 2024 to December 7, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5374249646552 39.16555616012397,-86.52697360310442 39.16557286773963)
Temporary Lane Restriction for Utility Pole Maintenance from Storm Damage S Walnut St between E Burks Dr and E Rhorer Rd/W Gordon Pike August 29, 2024 to November 28, 2024
Smithville will be on the shoulders of S Walnut St with the potential for a 30 minute lane closure between August 28th, 2024 and November 28th, 2024 while they reattach down guys to the poles after the recent storm damage. The work is not expected to take the full 3 month period, but only a few days.
Engineering
LINESTRING(-86.53137836111604 39.12665877608285,-86.53136833979904 39.121504382067144)
Rolling Lane Closure for Fiber Installation - AT&T W Country Club Dr at S Madison St; S Rogers St between W Ralston Dr and W Watson St August 30, 2024 to December 31, 2024
Lineal will be working for AT&T to install fiber to connect to existing infrastructure for about 2 weeks between September and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53768325285297 39.13604253720001,-86.53709024499783 39.13601780782696,-86.53722414999739 39.1371207294211),LINESTRING(-86.53911157284814 39.13840167945304,-86.53844842427895 39.13837695090854,-86.53828263713665 39.136799251816626))
Bloomington Gateway Phase 1 - Old 37 at College & Walnut Road Closure N Old State Rd 37 between N College Ave and N Walnut St September 2, 2024 to November 15, 2024
The Bloomington Gateway Phase 1 Project will be closing the cut-thru of Old State Rd 37 between N College Ave and N Walnut St for their reconstruction of the median and roadway. Vehicles will be detoured to W 17th St and the Bypass and pedestrians will be detoured along College Ave and Walnut St for the duration of the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5345684940967 39.183402760340044,-86.53429222656817 39.183399641758854,-86.53419030262559 39.18337261404943),LINESTRING(-86.53457251741023 39.18333830963414,-86.5341889615211 39.183353902552284))
Conduit installation along S Walnut St Pike and E Winslow Rd S Walnut St Pike & E Winslow Rd; S Henderson St & E Winslow Rd September 23, 2024 to December 27, 2024
Lineal will be installing conduit for AT&T to connect some of their existing infrastructure at the intersections of E Winslow Rd, S Walnut St Pike, and S Henderson St. The work is estimated to take about 7 days to complete and will include a lane and sidewalk closure at the locations. The work is planned between September 2024 and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52873739116825 39.13589253529207,-86.52881526461753 39.13599488412237,-86.52887777603895 39.13607704257987),LINESTRING(-86.52880758360358 39.13599840018847,-86.52684219541364 39.13605889434348),LINESTRING(-86.52695179841065 39.13439149649986,-86.52678625012067 39.13439716166707))
W 3rd St Maintenance Project, from Franklin Rd to Patterson Dr This project will have lane restrictions and sidewalk restrictions along W 3rd St between Franklin Rd and Patterson Dr. September 23, 2024 to November 26, 2024 daily until September 27, 2024
This project includes replacing curb ramps and sidewalk areas along W 3rd St. It also includes the milling and resurfacing of all lanes of W 3rd St. There will also be lane markings reinstalled along W 3rd St. This is between Franklin Rd and Patterson Dr.
Engineering
LINESTRING(-86.57022929212846 39.16453550162967,-86.55195583143485 39.164370756674714)
Duke N Fee Ln Lane Closure & Pole Installation 825 N Fee Lane October 1, 2024 to December 31, 2024
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 10/1/24-12/31/24.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)
Flock Safety Camera Installation Along E Kirkwood Ave and N Walnut St Intersections of E Kirkwood Ave/ S Dunn St, E Kirkwood Ave/ S Grant St, W Kirkwood Ave/ N Walnut St, and N Walnut St/E 7th St October 23, 2024 to February 23, 2025
Flock Safety is working with the Bloomington Police Department to install live video feed cameras in the right-of-way to aid in BPD investigations. The cameras will be placed in 4 locations along E Kirkwood Ave and N Walnut St. The installation will require a lane closure at each location and is expected to take 5 days to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53357133571649 39.1686589718461,-86.53357444106325 39.1685795228299,-86.53346575392663 39.1685795228299),LINESTRING(-86.52827554433638 39.16662837741421,-86.52827554433638 39.16655735276254,-86.52846807583555 39.166564575611716),LINESTRING(-86.52991059769879 39.16653703479517,-86.5298158846226 39.1665334233692,-86.52981743729597 39.16644554528119),LINESTRING(-86.5335836883135 39.166679163000026,-86.5335836883135 39.16660452697732,-86.53343773701573 39.166608138399596))
AT&T Fiber Installation at the Intersection of S Madison St & W Smith Ave W Smith Ave & S Madison St October 24, 2024 to January 31, 2025
AT&T will be installing underground fiber at the intersection of S Madison St and W Smith Ave between October 14, 2024 and January 2025. When work begins the installation will require the temporary closure of W Smith Ave during day time hours and will not last more than 3 days once started.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53753840412124 39.16287163325691,-86.53741892384477 39.16286931726947,-86.5372392830538 39.1628658351396),LINESTRING(-86.53741127766757 39.162987595502756,-86.53741875569426 39.162874532315385))
CBU UNSCHEDULED ROAD CLOSING N LINCOLN CLOSED BETWEEN EAST 7TH & EAST 8TH. October 28, 2024 daily until November 11, 2024
CITY UTILITIES HAS CLOSED N LINCOLN BETWEEN E 7TH & E 8TH ALL DAY TODAY.
Utilities
LINESTRING(-86.53103722786581 39.16945835215631,-86.53103722786581 39.169436925390215,-86.53102801539748 39.1684441447357)
CITY UTILITIES ROAD CLOSING 400 BLK N LINCOLN BETWEEN E 8TH & 3 9TH ST October 28, 2024 daily until November 11, 2024
CITY UTILITIES WILL CLOSE BOTH LANES OF N LINCOLN ST BETWEEN E 8TH & E 9TH FOR 1 HOUR BEGINNING 12:45 PM FOR 1 HOUR.
Utilities
LINESTRING(-86.53105646548518 39.17041975262279,-86.53106230984936 39.169477305748416)
2214 E Maxwell LN Sewer Connection and Lane Closure 2214 E Maxwell LN November 4, 2024 to November 15, 2024
3 day lane closure on E Maxwell Ln adjacent to 2214 E Maxwell Ln for a new construction sewer connection. Occurring in the date range of 11/4/24 to 11/15/24.
Engineering
LINESTRING(-86.508101704502 39.15778607816296,-86.50709081692877 39.157786078208915)
1st Street Reconstruction Project S College Ave Between W 2nd Street to W 1st Street. November 4, 2024 to November 15, 2024 weekly on Monday, Tuesday, Wednesday, Thursday, Friday and Saturday until November 24, 2024
Lane restriction, installing new traffic signals.
Engineering
LINESTRING(-86.5349500292704 39.161149626511786,-86.53499382095859 39.15927189620692)
Duke Energy Pole Installation and Lane Restriction 2517 S Banta AVE November 7, 2024 to November 21, 2024
Install new pole. 1-day lane closure of the southbound lane of S Banta Ave occurring in the date range of 11/7/24 to 11/21/24.
Engineering
LINESTRING(-86.54479178197519 39.13862690719239,-86.5447964615297 39.139218532181246)
Duke Energy Pole Installation and Lane Restriction 1419 W 12th ST November 7, 2024 to November 21, 2024
1 day lane closure of the east bound lane on W 12th St adjacent to 1419 W 12th St in order to install a new pole, occuring in the date range of 11/7/24-11/21/24.
Engineering
LINESTRING(-86.55147236121707 39.17422037022183,-86.55188649427261 39.17422452887297)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.