Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
Rolling Lane Closure for Fiber Installation - AT&T W Country Club Dr at S Madison St; S Rogers St between W Ralston Dr and W Watson St August 30, 2024 to December 31, 2024
Lineal will be working for AT&T to install fiber to connect to existing infrastructure for about 2 weeks between September and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53768325285297 39.13604253720001,-86.53709024499783 39.13601780782696,-86.53722414999739 39.1371207294211),LINESTRING(-86.53911157284814 39.13840167945304,-86.53844842427895 39.13837695090854,-86.53828263713665 39.136799251816626))
Conduit installation along S Walnut St Pike and E Winslow Rd S Walnut St Pike & E Winslow Rd; S Henderson St & E Winslow Rd September 23, 2024 to December 27, 2024
Lineal will be installing conduit for AT&T to connect some of their existing infrastructure at the intersections of E Winslow Rd, S Walnut St Pike, and S Henderson St. The work is estimated to take about 7 days to complete and will include a lane and sidewalk closure at the locations. The work is planned between September 2024 and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52873739116825 39.13589253529207,-86.52881526461753 39.13599488412237,-86.52887777603895 39.13607704257987),LINESTRING(-86.52880758360358 39.13599840018847,-86.52684219541364 39.13605889434348),LINESTRING(-86.52695179841065 39.13439149649986,-86.52678625012067 39.13439716166707))
Flock Safety Camera Installation Along E Kirkwood Ave and N Walnut St Intersections of E Kirkwood Ave/ S Dunn St, E Kirkwood Ave/ S Grant St, W Kirkwood Ave/ N Walnut St, and N Walnut St/E 7th St October 23, 2024 to February 23, 2025
Flock Safety is working with the Bloomington Police Department to install live video feed cameras in the right-of-way to aid in BPD investigations. The cameras will be placed in 4 locations along E Kirkwood Ave and N Walnut St. The installation will require a lane closure at each location and is expected to take 5 days to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53357133571649 39.1686589718461,-86.53357444106325 39.1685795228299,-86.53346575392663 39.1685795228299),LINESTRING(-86.52827554433638 39.16662837741421,-86.52827554433638 39.16655735276254,-86.52846807583555 39.166564575611716),LINESTRING(-86.52991059769879 39.16653703479517,-86.5298158846226 39.1665334233692,-86.52981743729597 39.16644554528119),LINESTRING(-86.5335836883135 39.166679163000026,-86.5335836883135 39.16660452697732,-86.53343773701573 39.166608138399596))
AT&T Fiber Installation at the Intersection of S Madison St & W Smith Ave W Smith Ave & S Madison St October 24, 2024 to January 31, 2025
AT&T will be installing underground fiber at the intersection of S Madison St and W Smith Ave between October 14, 2024 and January 2025. When work begins the installation will require the temporary closure of W Smith Ave during day time hours and will not last more than 3 days once started.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53753840412124 39.16287163325691,-86.53741892384477 39.16286931726947,-86.5372392830538 39.1628658351396),LINESTRING(-86.53741127766757 39.162987595502756,-86.53741875569426 39.162874532315385))
Duke Energy Pole Removal 1798 S Rogers Street November 20, 2024 to February 18, 2025
Single day lane closure adjacent to 1798 S Rogers Street to remove two temporary poles MNI-13983 and MNI-11785 and install a new anchor. Closure will occur in the date range of 11/20/24 to 02/18/2025.
Engineering
LINESTRING(-86.5388618439407 39.147853213148636,-86.5388343177871 39.148829638985575)
Duke N Fee Ln Lane Closure & Pole Installation 825 N Fee Lane December 2, 2024 to March 15, 2025
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 12/2/24-3/15/25.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)
Duke Energy Lane and Sidewalk Closure 1200 W Grimes Ln December 13, 2024 to January 3, 2025
Single-day closure of the northern lane and sidewalk of W Grimes Ln adjacent to 120 W Grimes Ln to Replace the riser on pole 761-710, install a new pad mount transformer and bore primary cable between new transformer and existing transformer 1D1. Work and closures will occur in the date range of 12/13/2024 to 01/03/2025
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5356767315483 39.153388828260546,-86.53482305439523 39.15337562145396),LINESTRING(-86.5356767315483 39.15342019441627,-86.53482944100735 39.15340368591501))
Residential Cable Connection Installation - 3148 S Coppertree Dr 3148 S Coppertree Dr December 16, 2024 to January 16, 2025
Between 12/16/2024 and 1/16/2025, QC Communications will be installing a cable connection to the residence of 3148 S Coppertree Dr. The work is expected to take up to a day of work and will include boring underneath Coppertree Dr to the residence.
Engineering
LINESTRING(-86.50437633563978 39.13463022662313,-86.50431488161009 39.13467572763744)
Utility Cabinet Install on east side of S Walnut St S Walnut St just south of E Winslow Rd on the east side December 16, 2024 to March 28, 2025
AT&T will be installing a utility cabinet on the east side of S Walnut St just south of E Winslow Rd that will take 2-3 days to install. The work is scheduled between 12/16/2024 and 3/28/2025. The work will primarily be on the road shoulder, but may include brief lane closures during the installation.
Engineering
LINESTRING(-86.53140196468983 39.134648252684315,-86.53139168876503 39.1347890677836,-86.53135058506582 39.134916598196554)
Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr 705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr. December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)
AT&T Fiber Installation along S Woodscrest Dr and E 3rd St S Woodscrest at E 2nd St intersection heading north towards 410 S Woodscrest; E 3rd St at S College Mall Rd intersection December 16, 2024 to February 28, 2025
AT&T will be installing fiber along S Woodscrest Dr and E 3rd St between 12/16/2024 and 2/28/2025 for 2-3 days max once begun. The work will involve a short sidewalk closure and temporary lane closures for equipment
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5000792424787 39.16421410144247,-86.49890808733562 39.16422524306569,-86.49871768481235 39.16416396411611,-86.49837998977111 39.16416396411611,-86.49830095476145 39.16380464556485),LINESTRING(-86.50295732782295 39.160970161846706,-86.50245507079751 39.16096242467813,-86.5024650494139 39.1618754046973,-86.50246837561937 39.16244278743983))
CBU Unscheduled Road Closure 12:45 pm today 617 S Fess Avenue both lanes between E 2nd St & E University St December 18, 2024 12:44 pm to 16:45 pm daily for 10 times
CLOSING BOTH LANES AT 617 S FESS AVENUE BETWEEN E 2ND ST & E UNIVERSITY ST FOR APPROXIMATEL 4 HRS. TODAY 12/18 TO REPAIR A WATER SERVICE HIT.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52592115478065 39.161306985743636,-86.52592803729522 39.160389101220034),LINESTRING(-86.52592115478065 39.161306985743636,-86.52592115478065 39.161306985743636),LINESTRING(-86.52592115478065 39.161296312736596,-86.52591427226609 39.160394437792576,-86.52592115478065 39.1613016492403))
Alley Closure for Emergency Conduit Repair Alleyway between E Grimes Ln and E Wilson St that is east of S Walnut St December 19, 2024 to December 31, 2024
AT&T is repairing a section of conduit that was damaged between E Grimes Ln and E Wilson St east of S Walnut St in the following days. The work will involve an alley closure and will not impact the neighboring streets.
Engineering
LINESTRING(-86.53307361844308 39.153319431830994,-86.53309484548039 39.15154576898692)
204 E 17th St Alley Paving 204 E 17th St December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
Smithville Fiber Installation along S Union St from E 7th St to E 4th St S Union St between E 7th St and E 4th St, E 4th St between S Union St and S Jefferson St December 26, 2024 to January 24, 2025
Smithville will be installing new fiber conduit along S Union St and E 4th St to connect to the Fire Station #4 area.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50945070068101 39.168069689466165,-86.50939072807897 39.16556813037789,-86.50714775276222 39.16560532893419),LINESTRING(-86.50659600482334 39.165549531092324,-86.50657201578252 39.164703258397594))
AT&T Fiber Installation along N Smith Rd N Smith Rd between E Grandview Dr and E Morningside Dr, Morningside Dr to E Saratoga Dr December 30, 2024 to March 28, 2025
AT&T will be installing fiber along N Smith Rd from E Morningside Dr and E Saratoga Dr between 12/30/2024 and 3/28/2025. The work will take 2-3 days once started and will only include a lane closure during that time period. The sidewalks will not be impacted.
Engineering
LINESTRING(-86.48127986784151 39.168652953912726,-86.48124060360924 39.16624806013084,-86.48099193013813 39.16624298642836,-86.48045531896362 39.16638504995993,-86.48019355741508 39.16600452199816)
Duke Energy Pole Replacement - W Tapp Rd and W Graham Dr Near 1722 W Tapp RD and near 913 W Graham Dr January 1, 2025 to April 30, 2025
WO# 40995283. 1-2 hour closure of the southern lane of W Graham Dr near S Broadview Dr for a pole replacement. 1-2 hour closure of the northern lane of W Tapp Rd near S Boardwalk Cir for a pole replacement. Closures will occur in the date range of 01/01/2025 to 04/30/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55877613398205 39.13654860840089,-86.55780002275073 39.1365412720169),LINESTRING(-86.54365036332634 39.13994197229269,-86.54247186295382 39.13991791829332))
Lane and Sidewalk Closures for Duke Energy Work E Hillside Dr January 1, 2025 to March 31, 2025
WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail/S Walnut Street, E Hillside Drive/S Henderson Street, and S High Street in Bloomington, IN 47403 Permitted closures include: - 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St. - 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr. - 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr. Closures will occur in the date range of 01/01/2025 03/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))
Duke Energy Overhead work and Pole Replacement S Walnut St Pike January 1, 2025 to March 31, 2025
Rolling lane closures and shoulder work along S Walnut St Pike between S Walnut St and E Winslow Rd to replace overhead equipment on six poles and replace two poles. Lane closures will occur over 3 days in the date range of 01/01/2025 to 03/31/2025.
Engineering
LINESTRING(-86.52980615723311 39.13724019435821,-86.52901702137609 39.1362388677575)
Duke Energy Pole Maintenance and Lane Closure 300 W 1st St January 1, 2025 to March 31, 2025
Duke Energy Will be replacing overhead equipment on pole # 152-631. 1-2 day lane closure on S Morton St between W 1st St and W 2nd St occuring between 1/1/25 and 3/31/25. No overnight closure will occur.
Engineering
LINESTRING(-86.53629041294062 39.15972695157808,-86.53628327644239 39.16022912794409)
Duke Energy Pole Maintenance and Lane Closure 2333 E 3rd ST January 1, 2025 to March 31, 2025
1-2 day lane closure on the east bound lane of E 3rd St adjacent to 2420 E 3rd St occuring between 1/1/25 and 3/31/25. Duke Energy will be replacing overhead equipment on pole # 168-648. No overnight closure will occur.
Engineering
LINESTRING(-86.50515985143561 39.1642149742589,-86.50417888918273 39.16421732606571)
E Weymouth Ln Lift Station E Weymouth Ln January 1, 2025 to February 28, 2025
Road and sidewalk closure on E Weymouth Ln to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on January 1, 2025, and end on February 28, 2025
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47448619867475 39.174443691933334,-86.47303366642517 39.17383204414776),LINESTRING(-86.47442650185764 39.17450735674015,-86.47300195409574 39.17391407058781))
Duke Energy Work 4000 N Kinser Pike January 1, 2025 to January 31, 2025
WO # 47538323, 1-2 day lane closure for to replace overhead equipment on pole # 155-461.
External Project
LINESTRING(-86.54741228999647 39.21062850444568,-86.54743031227328 39.209586771065005)
Duke W Smith Ave Bike Lane Closure 350 S Walnut ST January 1, 2025 to March 31, 2025
WO#46628241. Replacing overhead equipment on pole # 764-554. 1-2 day lane closure of the east bound bike lane on the south side of W Smith Ave between S College Ave and S Walnut St. Vehicle lane to remain open. No overnight closure.
Engineering
LINESTRING(-86.53367690841516 39.16284345646315,-86.53486691439286 39.16283897746581)
Duke - S High St Lane Closure 2000 E Wexley Rd January 1, 2025 09:00 am to 14:30 pm March 31, 2025
WO# 46628237. Replacing overhead equipment on pole # MNI-6099. 1-2 day lane closure of S High St south of E Wexley Rd in the date range of 01/01/2025 to 03/31/2025. No overnight closure.
Engineering
LINESTRING(-86.50816896765443 39.13690697494957,-86.50817648644521 39.13735456822633)
Bloomington Fire Station #3 water main connection 810 N Woodlawn AVE January 6, 2025 to January 10, 2025
Closure of E 11th St and the northern sidewalk between N Woodlawn Ave and N Forrest Ave from 01/06/2025 to 01/10/2025 for the Bloomington Fire Station #3 water main connection.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52346933797818 39.17343057949691,-86.52241795887392 39.17342183886609),LINESTRING(-86.52340450755054 39.173491764298745,-86.52249124530402 39.17348739394558))
712 W Country Club DR Water Line Install 712 W Country Club DR January 6, 2025
1-day closure of the northern lane and sidewalk of W Country Club Dr adjacent to 712 W Country Club Dr to install a waterline for 712 W Country Club Dr.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54207005594776 39.13618328447603,-86.5408134410243 39.13613959501296),LINESTRING(-86.54206066821621 39.13622697391196,-86.54080539439725 39.13618640515094))
Bloomington Fire Station #3 water main connection 810 N Woodlawn AVE January 13, 2025 to January 17, 2025
Closure of E 11th St and the northern sidewalk between N Woodlawn Ave and N Forrest Ave from 01/06/2025 to 01/10/2025 for the Bloomington Fire Station #3 water main connection.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52346933797818 39.17343057949691,-86.52241795887392 39.17342183886609),LINESTRING(-86.52340450755054 39.173491764298745,-86.52249124530402 39.17348739394558))
Lane and Sidewalk Closure for Fiber Installation - E Winslow Rd E Winslow Rd between S Walnut St and S Walnut St Pike January 13, 2025 to January 15, 2025
Lineal will be installing fiber for AT&T along E Winslow Rd on the north side between S Walnut St and S Walnut St Pike. The work will include a temporary lane and sidewalk closure when at the intersection installing fiber at the manhole there.
Engineering
LINESTRING(-86.52967931644935 39.135977479073716,-86.52884380834121 39.13599204226466)
800 Block of E University Street will be closed until 3:00pm today 800 Block E University Street January 13, 2025
800 Block of E University Street will be closed until 3:00pm today
Utilities
LINESTRING(-86.52342342011076 39.1603723368882,-86.52269204503796 39.16037080833115)
Duke Energy Pole Relocation 1020 N Monroe St January 17, 2025 to January 31, 2025
Single-day closure of the eastern lane, sidewalk, and crosswalk adjacent to 1020 N Monroe St to remove one pole, install a new pole 25 ft south of the original pole, and replace overhead wire to the new pole. Work will occur in the date range of 01/17/2025-01/31/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54727264892446 39.175707021371636,-86.54727495253911 39.1762123983045),LINESTRING(-86.54719202241155 39.176239184966335,-86.5471943260262 39.17553737105686))
Emergency Road Closure 100 block of E 19th, between N Walnut & N Washington St, both lanes 9:15 am to 3 pm. January 21, 2025
Emergency Road Closure -100 block of E 19th, between N Walnut & N Washington St, both lanes 9:15 am to 3 pm.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53237548204613 39.18133644162458,-86.53237548204613 39.18133644162458,-86.53372436010811 39.18148155801384),LINESTRING(-86.53350354732929 39.18145365103919,-86.53372436010811 39.181488999871874))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.