Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street.
The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street.
Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
North Jefferson Street North Jefferson Street; 8th to 10th April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
ROW2026-04-2436 711 E Cottage Grove Avenue May 21, 2026 to June 25, 2026
3 phases of 3 day closures between the listed dates
Engineering
LINESTRING(-86.52527259943822 39.17263101095142,-86.5252299785262 39.17263149579409,-86.52524094476512 39.173064236598776,-86.52527037828621 39.17306472414509,-86.52527037828621 39.17263221597463)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-04-2420 North Woodlawn Avenue, Between East 13th Street and E 12th Street June 1, 2026 to July 17, 2026
Full road closure for work associated with ROW2026-04-2420
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52363343342134 39.175180011100736,-86.52357676134712 39.17517835324318,-86.52356235488244 39.17517793180343,-86.52353467405678 39.174556420441746,-86.52351149891358 39.17432510842613,-86.52358971502188 39.17432510842613,-86.52361031242812 39.17454024856099,-86.52361299463715 39.17470763331403,-86.52363445230927 39.17517891077475,-86.52360763021912 39.17517891077475),LINESTRING(-86.52360763021912 39.17517891077475,-86.52357678481546 39.175177871126124))
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
Milling and Resurfacing on S Zona Ct S Zona Ct from W Countryside Ln to the Dead End June 11, 2026 06:00 am to 16:00 pm June 25, 2026
Lane Restrictions and No Parking on S Zona Ct from W Countryside Ln to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54632463492159 39.14313550103364,-86.54623122026172 39.14278203324969,-86.54612365186551 39.14253394610529,-86.54593116105121 39.14213876123782)
Milling and Resurfacing on S Rockport Rd from W Tapp Rd to W Graham Dr S Rockport Rd from W Tapp Rd to W Graham Dr June 11, 2026 06:00 am to 16:00 pm June 25, 2026
Lane Restrictions and No Parking on S Rockport Rd from W Tapp Rd to W Graham Dr for milling and resurfacing.
Street
LINESTRING(-86.54863066898712 39.13643992214705,-86.5463776134146 39.13867012107181,-86.54514379726776 39.13997658538935)
Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. June 14, 2026 to June 27, 2026
Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. This will be for the installation of new curb ramps, bump-outs, and crosswalks.
Engineering
LINESTRING(-86.53869286625962 39.1614839237445,-86.53867363029752 39.16454450173788)
Moving Lane Closures Along Indiana Ave East side of Indiana Avenue between E 13th St and E 3rd St. June 18, 2026 to June 27, 2026
Fiber boring project working along the east side of Indiana Ave. Multiple lane closures will occur as the work advances over the course of a week or so.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52695261383738 39.17517641062099,-86.52694350801626 39.17448462534668),LINESTRING(-86.52694350801626 39.174188143859936,-86.52693440219511 39.17358105881988),LINESTRING(-86.52695261383738 39.17331281027208,-86.52693440219511 39.17268453993145),LINESTRING(-86.52693440219511 39.1724304065138,-86.52692529637396 39.17175977225202),LINESTRING(-86.52694110527642 39.17152523099148,-86.52692963266067 39.17058243493011),LINESTRING(-86.52689521481348 39.170315603561335,-86.52688374219774 39.16957736483238),LINESTRING(-86.5269066874292 39.16932831869383,-86.52689521481348 39.16866122647767),LINESTRING(-86.52690659685281 39.168346826529046,-86.52686323308262 39.16448046042518))
CBU - Sanitary Sewer Main Replacement North Washington Street between East Cottage Grove Avenue and just south of East 11th Street for an additional week. June 22, 2026 to July 3, 2026
This project began on 5/26 and projects delays have extended the original timeline. Local access to residences and businesses will be maintained throughout the project whenever possible. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53232442635785 39.17256124668796,-86.532311874042 39.17439067837003)
Milling and Resurfacing on E Sunny Slopes Dr E Sunny Slopes Dr from S Brookside Dr to S Walnut Street Pike June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Sunny Slopes Dr from E Ridgeview Dr to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.53063890578146 39.13367223884842,-86.5300243068952 39.1336770542965,-86.52978840025197 39.133600007087324,-86.52956490974788 39.133474805192634,-86.52947799677406 39.13337849589141,-86.52931658696555 39.133108829147204,-86.52916138522659 39.132940286907655,-86.52893168665292 39.13282471485314,-86.52865853159237 39.13279100630152,-86.52836054425356 39.13279100630152,-86.52818051023638 39.132786190792814,-86.52798806008008 39.13274766671137,-86.52765282432391 39.132651356415664,-86.52739208540247 39.132564677036925,-86.52703822543765 39.13253096836081,-86.5268519833509 39.13253096836081)
Milling and Resurfacing on E Ridgeview Dr E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St for milling and resurfacing.
Street
LINESTRING(-86.52796476408695 39.13271231234182,-86.5279816575028 39.13226240726084,-86.52802670661178 39.1321313664055,-86.52812243596834 39.13202653354563,-86.52826884557248 39.13194790879831,-86.528454673147 39.131899860298404,-86.52964284339603 39.131886756156376,-86.53029605547609 39.131873652011905,-86.53045372735745 39.131869283963226,-86.53074091542715 39.13191296443799,-86.53094926755612 39.13195664488569,-86.53113509513061 39.1319697490147,-86.53138286522994 39.131987221182925)
Milling and Resurfacing on S Brookside Dr S Brookside Dr from E Ridgeview Dr to E Sunny Slopes Dr June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on S Brookside Dr from E Sunny Slopes Dr to E Ridgeview Dr for milling and resurfacing.
Street
LINESTRING(-86.53071400558765 39.13194682305814,-86.53065657794518 39.13365626711817)
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Lincoln and Washington June 22, 2026 to July 1, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53116852983791 39.166563238379524,-86.53228402846483 39.16657370606072)
Speed Hump Installation on S Pine Meadows Dr S Pine Meadows Dr from S Pinehurst Dr to W Pinehurst Dr June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54995373563573 39.136926792648666,-86.54923419578516 39.13692992806281,-86.54885825642504 39.13711805265618,-86.54867635028303 39.137353207691035,-86.5486278419785 39.13756954962946,-86.54864401141334 39.138557189164686)
Speed Hump Installation on S Pinehurst Dr S Pinehurst Dr between S Pine Meadows Dr and W Pine Meadows Dr June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54996730506858 39.13692200390281,-86.54997837354102 39.137691801308705,-86.54991565219714 39.1379264590671,-86.54978652001853 39.13813536104769,-86.54961311395007 39.13830133752188,-86.54943970788163 39.138415803827854,-86.54915561708869 39.138527408296966,-86.5489305581488 39.13857605634354,-86.54865015684665 39.13858177964093)
Speed Hump Installation on W Pinehurst Dr W Pinehurst Dr between W Pine Meadows Dr and S Southern Pines Ct June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54859451745618 39.13857946683348,-86.5474628749398 39.13850802395493)
Half Day Lane Closure Southbound Kinser Pike Southbound lane of Kinser Pike, just north of the Napa entrance off Kinser. June 24, 2026 to June 26, 2026
Utility spotting for a fiber boring project, lasting approximately 2-3 hours.
Engineering
LINESTRING(-86.53776079969234 39.179568019100316,-86.53776079969234 39.179435789209634)
W Allen St Closed for Tree Removal W Allen St between S Adams St and S Larkspur Ln June 24, 2026 07:00 am to 15:00 pm
W Allen St between S Adams St and S Larkspur Ln will be closed for tree removal. Signs will be in place.
Street
LINESTRING(-86.55054560778291 39.15585649582246,-86.54798072748586 39.15576665501996)
Kirkwood, Patterson Rogers Grimes Road Maintenance Project West Patterson Drive, from Rogers to To South Walnut Street. This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only. June 29, 2026 to July 6, 2026
This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53863251104782 39.15381689322689,-86.53813471743484 39.15380736196971,-86.53791347582907 39.153759705664356,-86.53703465500617 39.153421344968336,-86.53685028700136 39.15338321971754,-86.53589157337636 39.153364157084354),LINESTRING(-86.53589157337636 39.153364157084354,-86.53589771897653 39.15336892274311))
ROW2026-06-2572 1935 S. Locust Court June 29, 2026 to July 1, 2026
Lane closure for street cut
Engineering
LINESTRING(-86.50896749067537 39.14506477789078,-86.50896593898453 39.144826501509925)
CBU - Service Line Maintenance Near 1309 North Kinser Pike June 29, 2026
CBU Crews will be closing the Southbound Lane of North Kinser Pike, just north of West 17th Street to address a service line issue.
Utilities
LINESTRING(-86.53777963356184 39.17948636244199,-86.53777570988349 39.17998818092016)
Roll gate repairs for HUB 2 Project 205 E 17th St June 30, 2026 to July 2, 2026
ROW2026-06-2546
2-3 days of sidewalk closure on the north side of E 17th St for roll gate repairs. no overnight closures.
External Project
LINESTRING(-86.53219301349496 39.179021549422686,-86.53106777529756 39.179021549422686)
Bloomington Convention Center Skywalk Work 302 S College Ave June 30, 2026 to July 24, 2026
Weddle Brothers is requesting approval of a temporary right-of-way closure at South College Avenue to accommodate completing the enclosure at the connector portion of the Bloomington Convention Center Expansion Project that will span from the new expansion on the east side of South College Avenue to the west side of College Avenue. The request includes temporary closures of: the western sidewalk, the existing eastern pedestrian diversion, and College Avenue south of 3rd Street, as necessary to safely complete the work. The closure(s) are proposed from June 30, 2026 through July 24, 2026. Pedestrian and vehicular traffic will be maintained, shifted, or rerouted in accordance with the approved maintenance of traffic plan. In addition to the right-of-way closure requests Weddle Brothers has also submitted a noise permit application that would only be used to meet the deadline of reopening the right-of-way on July 24, 2026.
External Project
LINESTRING(-86.5349109547624 39.164474784477534,-86.53491999233634 39.16405201798375)
ROW2026-04-2445 3108 E Kensington July 1, 2026 to July 31, 2026
Lane closures for DUKE
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52377876868866 39.12147233493138,-86.51759706206178 39.121453659579146),LINESTRING(-86.51142514858715 39.12147230267135,-86.50918756618826 39.1214641908073),LINESTRING(-86.4966328198572 39.14318153318331,-86.49661612728588 39.14296662473882,-86.4965894191718 39.14249019885966,-86.49657940362901 39.14218207388387),LINESTRING(-86.4965856533735 39.14085691567303,-86.49655754002136 39.13854313720762),LINESTRING(-86.49560844654047 39.13591188944821,-86.49547215998619 39.13593760288052,-86.49525115476307 39.13594045992798,-86.49489386298568 39.13594045992798,-86.49368938451963 39.135914746496695))
ROW2026-04-2431 3274 E Moores Pike July 1, 2026 to July 31, 2026
Lane closures for Duke
Engineering
LINESTRING(-86.49811144528441 39.150457070952484,-86.49709813604936 39.1504711033063,-86.49540627152295 39.150407957691925,-86.49356060113054 39.150351828209324,-86.49099113842736 39.15028868248788,-86.48686552225608 39.150183439492906,-86.48454337226009 39.15020881077777)
ROW2026-06-2574 711 E Cottage Grove Avenue July 1, 2026 to July 3, 2026
Short term closures of Cottage Grove with access maintained
Engineering
LINESTRING(-86.52522243389923 39.17256359217973,-86.52522243389923 39.172514783543875,-86.52469725168474 39.17251158045039,-86.52469859278925 39.17255108858646,-86.52522162354715 39.172555247336305)
ROW2026-06-2561 ROW2026-06-2562 ROW2026-06-2563 714 West 4th Street July 1, 2026 to July 15, 2026
Lane closures for gas work.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54165276176894 39.16564274090413,-86.54100653453756 39.16564080640583,-86.54095806963407 39.16564066132483),LINESTRING(-86.54095404632055 39.16564378069373,-86.54165678508245 39.16564274090413))
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.