Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
ROW2026-04-2420 North Woodlawn Avenue, Between East 13th Street and E 12th Street June 1, 2026 to July 17, 2026
Full road closure for work associated with ROW2026-04-2420
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52363343342134 39.175180011100736,-86.52357676134712 39.17517835324318,-86.52356235488244 39.17517793180343,-86.52353467405678 39.174556420441746,-86.52351149891358 39.17432510842613,-86.52358971502188 39.17432510842613,-86.52361031242812 39.17454024856099,-86.52361299463715 39.17470763331403,-86.52363445230927 39.17517891077475,-86.52360763021912 39.17517891077475),LINESTRING(-86.52360763021912 39.17517891077475,-86.52357678481546 39.175177871126124))
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
Kirkwood, Patterson Rogers Grimes Road Maintenance Project West Patterson Drive, from Rogers to To South Walnut Street. This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only. June 29, 2026 to July 6, 2026
This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53863251104782 39.15381689322689,-86.53813471743484 39.15380736196971,-86.53791347582907 39.153759705664356,-86.53703465500617 39.153421344968336,-86.53685028700136 39.15338321971754,-86.53589157337636 39.153364157084354),LINESTRING(-86.53589157337636 39.153364157084354,-86.53589771897653 39.15336892274311))
Bloomington Convention Center Skywalk Work 302 S College Ave June 30, 2026 to July 24, 2026
Weddle Brothers is requesting approval of a temporary right-of-way closure at South College Avenue to accommodate completing the enclosure at the connector portion of the Bloomington Convention Center Expansion Project that will span from the new expansion on the east side of South College Avenue to the west side of College Avenue. The request includes temporary closures of: the western sidewalk, the existing eastern pedestrian diversion, and College Avenue south of 3rd Street, as necessary to safely complete the work. The closure(s) are proposed from June 30, 2026 through July 24, 2026. Pedestrian and vehicular traffic will be maintained, shifted, or rerouted in accordance with the approved maintenance of traffic plan. In addition to the right-of-way closure requests Weddle Brothers has also submitted a noise permit application that would only be used to meet the deadline of reopening the right-of-way on July 24, 2026.
External Project
LINESTRING(-86.5349109547624 39.164474784477534,-86.53491999233634 39.16405201798375)
ROW2026-04-2445 3108 E Kensington July 1, 2026 to July 31, 2026
Lane closures for DUKE
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52377876868866 39.12147233493138,-86.51759706206178 39.121453659579146),LINESTRING(-86.51142514858715 39.12147230267135,-86.50918756618826 39.1214641908073),LINESTRING(-86.4966328198572 39.14318153318331,-86.49661612728588 39.14296662473882,-86.4965894191718 39.14249019885966,-86.49657940362901 39.14218207388387),LINESTRING(-86.4965856533735 39.14085691567303,-86.49655754002136 39.13854313720762),LINESTRING(-86.49560844654047 39.13591188944821,-86.49547215998619 39.13593760288052,-86.49525115476307 39.13594045992798,-86.49489386298568 39.13594045992798,-86.49368938451963 39.135914746496695))
ROW2026-04-2431 3274 E Moores Pike July 1, 2026 to July 31, 2026
Lane closures for Duke
Engineering
LINESTRING(-86.49811144528441 39.150457070952484,-86.49709813604936 39.1504711033063,-86.49540627152295 39.150407957691925,-86.49356060113054 39.150351828209324,-86.49099113842736 39.15028868248788,-86.48686552225608 39.150183439492906,-86.48454337226009 39.15020881077777)
ROW2026-06-2561 ROW2026-06-2562 ROW2026-06-2563 714 West 4th Street July 1, 2026 to July 15, 2026
Lane closures for gas work.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54165276176894 39.16564274090413,-86.54100653453756 39.16564080640583,-86.54095806963407 39.16564066132483),LINESTRING(-86.54095404632055 39.16564378069373,-86.54165678508245 39.16564274090413))
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Washington and Walnut July 2, 2026 to July 11, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53350765891176 39.16658814056919,-86.53237594463717 39.16658289133295)
CBU - Sanitary Sewer Maintenance East Cottage Grove Avenue between North Walnut Street and North Washington Street July 2, 2026 to July 17, 2026
CBU crews will be installing a sewer main along East Cottage Grove Avenue, beginning at North Washing Street. East Cottage Grove will be closed to thru traffic for the duration of work.
Utilities
LINESTRING(-86.53234700778071 39.1725398169591,-86.53354407035673 39.17254764834726)