Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave. Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-08-2696 3115 S Walnut Street August 24, 2026 to November 2, 2026
Lane closure
Engineering
LINESTRING(-86.53139870895787 39.12769739955425,-86.53140961008194 39.12672067237892)
Bloomington Convention Center 3rd Street Reconstruction 301 W 3rd St August 25, 2026 to September 18, 2026
Closure of West 3rd Street between College and Walnut for median replacement, paving, sidewalk, and curb replacement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5347579372061 39.16455566132365,-86.53376586388922 39.16454885433669),LINESTRING(-86.53376293741924 39.164655497056714,-86.53476671661598 39.16466230403336))
Kirkwood between Rogers and Pine: lane restrictions, flagging through this corridor. Kirkwood between Rogers and Pine August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping. Between the dates of Oct 5th and Oct 24th, weather permitting, the intersection of Rogers and Kirkwood will be an active 4-way stop.
Engineering
LINESTRING(-86.53871888988866 39.16662737783176,-86.54842546717605 39.166689987041195)
Patterson between Grimes and 3rd St: lane restrictions, flagging through this corridor. Patterson between Grimes and 3rd St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53683370113019 39.153335691690245,-86.54181064011533 39.15394251541889,-86.54345396926207 39.155920722835276,-86.54825061004615 39.16056525193349)
Rogers St between Patterson and 1st St: lane restrictions, flagging through this corridor. Rogers St between Patterson and 1st St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53874184326119 39.15381014075365,-86.53864911379202 39.159143194572096)
Grimes between Walnut and Patterson: lane restrictions, flagging through this corridor. Grimes between Walnut and Patterson August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.5337353862689 39.153353907205144,-86.53684373653472 39.153348112847794)
Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving. August 31, 2026 to September 21, 2026
This is part of the Grimes, Kirkwood, Patterson, and Rogers Project. There will be lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving.
Engineering
LINESTRING(-86.55182187657726 39.164185707317955,-86.54156797754104 39.15386356919683,-86.53832990370971 39.153776382533636,-86.5372055726374 39.15349738475152,-86.5340799301977 39.15330557321778)
Eagleson Ave Bridge Replacement Intersection at N Eagleson Ave and Law Lane September 8, 2026 to September 24, 2026
Utility relocation
Indiana Department of Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.51542449379579 39.17358169585677,-86.51532960803156 39.173564181844085,-86.51538382846826 39.173420566776116,-86.51522568552792 39.17341356115551,-86.51524375900681 39.17336452179194,-86.51539738357744 39.173382035854274,-86.51544256727468 39.173259437326266,-86.51552841629943 39.17326994577991,-86.51550582445081 39.173385538666224,-86.51563233880309 39.17340305272333),LINESTRING(-86.51563233880309 39.17340305272333,-86.51561426532419 39.17345909767678,-86.51550130608109 39.1734450864426,-86.51543353053523 39.173574690252195))
Milling and Resurfacing on S Kennedy Dr S Kennedy Dr from E Burks Dr to E Rhorer Rd September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on S Kennedy Dr from E Burks Dr to E Rhorer Rd for milling and resurfacing.
Street
LINESTRING(-86.52802762495278 39.12580206579102,-86.52823982105016 39.12566784215548,-86.52834755137653 39.1255741387111,-86.52846181081357 39.12541205678332,-86.52851077914374 39.125298092704526,-86.52851730825442 39.125194258605546,-86.52849772092236 39.12446741562701,-86.52849772092232 39.12350250099192,-86.52850751458838 39.12296928849625,-86.52850425003305 39.122094262554725,-86.5285075145884 39.12147376000405)
Milling and Resurfacing on E Kennedy Ct E Kennedy Ct from S Kennedy Dr to the Cul-De-Sac September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on E Kennedy Ct from S Kennedy Dr to the cul-de-sac for milling and resurfacing.
Street
LINESTRING(-86.52851245036472 39.123641951437946,-86.52933919879443 39.12364663304322)
Milling and Resurfacing on E Burks Dr E Burks Dr from S Walnut St to S Walnut Street Pike September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on E Burks Dr from S Walnut St to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.5313342413561 39.1266892063247,-86.531249841952 39.12667283805965,-86.52975175252922 39.1266646539257,-86.52921370632808 39.1266646539257,-86.52909765714745 39.12666056185839,-86.52895523315301 39.12664010151818,-86.52875478456828 39.126545983876696,-86.52833278754778 39.12614905157022,-86.52807958933549 39.125891248977155,-86.52800046489413 39.12580531456976,-86.52784221601145 39.125682550948795,-86.52771034194255 39.1256170769301,-86.52758901779914 39.12557206350695,-86.52738856921442 39.125563879245135,-86.5267502987209 39.125580247767886)
Milling and Resurfacing on S Burks Ct S Burks Ct from Dead End to Dead End September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on S Burks Ct from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.52740339387977 39.12594511879834,-86.52735289802405 39.124327827232975)
Milling and Resurfacing on E Willow Ct E Willow Ct from S Kennedy Dr to the Dead End September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on E Willow Ct from S Kennedy Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.52851958117762 39.12503047609698,-86.52943375925072 39.12504420240535)
ROW2026-09-2722 102 South Clark Street September 11, 2026 to November 30, 2026
alley improvements
Engineering
LINESTRING(-86.5053187808586 39.166797797806396,-86.50532098828194 39.166640350008095)
CBU - Stormwater Maintenance Intersection of South Maple Street and West Fourth Street, along with a section of West Fourth Street extending east from South Maple Street to the alleyway. September 14, 2026 to September 25, 2026
Beginning August 31st, City of Bloomington Utilities (CBU) will begin a phased project in the area of South Fairview Street and West Fourth Street to allow crews to complete stormwater maintenance. Phase 2: The second phase will include the closure of the intersection of South Maple Street and West Fourth Street, along with a section of West Fourth Street extending east from South Maple Street to the alleyway. This phase is projected to begin September 14th at 7:00 a.m. and is expected to continue through September 25th.
Utilities
LINESTRING(-86.54228299150671 39.16565046765817,-86.54163568525371 39.165645905188995)
Lane Restriction for Pole Placement Bloomfield Rd. West bound lane of Bloomfield Rd just east of the intersection with S Weimer Rd September 16, 2026
One day lane closure for removal and replacement of pole for ATT. Turn lane will be utilized for lane shift.
Engineering
LINESTRING(-86.56432541629154 39.15427887721577,-86.56419480209851 39.15436542953455)
ROW2026-07-2633 803 S Madison Street September 16, 2026
Temp road closure- detour to Rogers
Engineering
LINESTRING(-86.5363054909716 39.159335213990545,-86.53631628635291 39.15748108800241)
CBU - Sanitary Sewer Maintenance Alleyway intersection at North Lincoln Street. September 16, 2026
Beginning at 7:00 a.m. on Wednesday, September 9, City of Bloomington Utilities (CBU) will begin a sanitary sewer main replacement project in the alleyway between North Washington Street and North Lincoln Street. The project is expected to take approximately one week to complete. Most of the work will take place in the alleyway, with the intersection at North Lincoln Street scheduled to close on the final day of the project. Residents in the area should watch for construction equipment and crews working near the project site and use caution when traveling around the work area. Residents whose parking is disrupted as part of the work will be provided with temporary parking permits on Tuesday, September 8. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
POINT(-86.5309806958041 39.17733015872244)
Fiber Boring near Walnut and Winslow Intersection North bound lane of S Walnut, south of Winslow. West bound lane of Winslow at intersection. September 17, 2026 to September 18, 2026
AT&T boring south under Winslow on the east side of Walnut to the pole location just south of the Marathon.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53085657049357 39.13597246667538,-86.53104897429013 39.135969568891824,-86.53109179445148 39.13578572403466,-86.53119738171388 39.13533239171659),LINESTRING(-86.53118927113954 39.13533239171659,-86.53122171323065 39.135338682742855,-86.53111898025156 39.13578953357501))
CBU - Emergency Water Utility Maintenance South Rogers Street will be closed to through traffic between West Dodds Street and West Allen Street during the work. September 17, 2026
Beginning Thursday, September 17, 2026, at 9:00 a.m., City of Bloomington Utilities (CBU) will complete emergency utility maintenance on South Rogers Street. The project is expected to be completed in one day and will require the closure of a section of South Rogers Street. South Rogers Street will be closed to through traffic between West Dodds Street and West Allen Street during the work. Motorists and residents should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53866394760514 39.15747746358721,-86.5387314168376 39.155614388696534)
CBU - Service line maintenance South Olive Street will be closed to through traffic between East Hillside Drive and East Thornton Drive September 17, 2026
Beginning Thursday, September 17, 2026, at 9:00 a.m., City of Bloomington Utilities (CBU) will complete emergency utility maintenance on South Rogers Street. The project is expected to be completed in one day and will require the closure of a section of South Olive Street. South Olive Street will be closed to through traffic between East Hillside Drive and East Thornton Drive during the work. Motorists and residents should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.51880016995558 39.1505022887965,-86.518814761119 39.149478246302095)
ROW2026-09-2745 718 N Indiana Avenue September 18, 2026
Lane closure with flaggers
Engineering
LINESTRING(-86.5269550170356 39.17339374390329,-86.52694038684926 39.17301662444055,-86.52697330489131 39.173049705173895,-86.52698061998447 39.17337862136998,-86.5269550170356 39.17339468905948)
Eagleson Ave Bridge Replacement Bridge on N Eagleson Ave at Law Lane September 18, 2026 to June 1, 2027
Bridge replacement.
Monroe County Highway Department
LINESTRING(-86.51546650649244 39.17336681187555,-86.51560040404867 39.17292161307793)
ROW2026-08-2704 S Banta between Ralston and Country Club September 18, 2026 to November 27, 2026
Lane restrictions
Engineering
GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(LINESTRING(-86.5447746995723 39.13850685470166,-86.54476818194182 39.136297608116735),LINESTRING(-86.5441238198063 39.136275983024746,-86.54411266011527 39.13659048048555,-86.54402338333638 39.13668569500413,-86.54394898597903 39.136703006668114,-86.54387830835216 39.136677039073675,-86.54388574831266 39.13625001546649,-86.54387458862166 39.13695114082569)),LINESTRING(-86.54084658864161 39.13981643190684,-86.54077242692142 39.13845805311453)),LINESTRING(-86.54086666227509 39.14039829889762,-86.54085065006508 39.139897399751106),LINESTRING(-86.54217431075038 39.14127175924975,-86.54203020261927 39.139922237771685),LINESTRING(-86.54328981417132 39.14131315521354,-86.54327380225448 39.14085365875334,-86.54322576621078 39.14058872250348,-86.54317773016707 39.13994293632396),LINESTRING(-86.53997784166545 39.14122036193632,-86.53983234945547 39.139856423779236))
2026 Witch Fest 6th between College and Walnut September 19, 2026
2026 Witch Fest
Public Works
LINESTRING(-86.53481048758431 39.16757506315474,-86.53368127424257 39.16756619696881)
ROW2026-09-2728 1827 S Maxwell September 21, 2026 to September 23, 2026
Lane restrictions
Engineering
LINESTRING(-86.51505322577529 39.146246903352534,-86.5150568833628 39.14585640092906)
S Basswood Drive - Sidewalk Maintenance. S Basswood Drive from S Copper Beech Way to S Copper Beech Way. September 21, 2026 to September 24, 2026
Sidewalk & Curb Ramp Repair - Portion of sidewalk may be temporarily closed or restricted. Please use posted detours and follow safety signage. Also, lane restrictions will be in effect. Flaggers will be present to direct traffic.
Street
LINESTRING(-86.57109283881236 39.15666481125703,-86.57117175914723 39.15643022394784,-86.57129452411256 39.15625003316467,-86.57161020545198 39.15604604304198,-86.57202234497844 39.15578425485134,-86.57215826333291 39.15561426199821,-86.57224595259385 39.155485067155155,-86.5722678749091 39.155338872704505)