Choose types

Gilliatte Genral Contractors - 18th St Closed from Dunn to Grant and Grant St Closed from 18th to 19th

18th St from Dunn to Grand and Grant St from 18th to 19th

May 29, 2017 to August 1, 2018
Gilliatte Genral Contractors - 18th St Closed from Dunn to west of Grant and Grant St Closed from 18th to 19th for construction project on NW corner of 17th and Dunn. Please call Dan Backler with City of Bloomington Planning and Transportation (812-349-3522) with questions.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.52964580426826 39.18097861908447,-86.5296189821781 39.18020518004232),LINESTRING(-86.5283672846378 39.180192705149324,-86.52961182962072 39.18020102174489,-86.52972984681736 39.1802176549331,-86.53011301953377 39.18022597152569,-86.53029540974678 39.18023012982164))

Hunters Creek Road, Phase I

2.85 miles east of SR 446

April 2, 2018 to October 1, 2018
This project is phase one of three phases. The road is being reconstructed. The improvements will include 2-10' paved lanes and a 2' aggregate shoulder with improved drainage facilities. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.33120759367742 39.00781679185715,-86.32992013335027 39.00921738565552,-86.32946662365637 39.01039894697425,-86.32989577709874 39.01126595284833,-86.32938079296788 39.01279986028186,-86.32775000988684 39.01573419919441)

Rhorer Road

Old SR 37 South to Walnut St Pike

May 1, 2018 to October 1, 2018
This project is part of the Fullerton Pike Corridor, Phase I. Rhorer Road will be closed for approximately 150 days for the road reconstruction. The intersection of Walnut Street Pike and Rhorer will have restricted lane movements through out the project. The detour route is Old SR 37 South to Fairfax Road. Gordon Pike will remain open during this duration but with construction along the corridor. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.53135322099078 39.121437233312264,-86.52666471963273 39.12144971862483)

Vectren-Miller Gas main replacement

Downtown-various locations

May 7, 2018 to September 1, 2018
Miller Pipeline will have one day one lane closures in 7 locations (as shown on the map and listed below) over the course of this project. Flaggers and signage will be in place. Each segment will be updated with a specific date and time when that is determined over the course of the project. Washington St (between 4th and Kirkwood) Lincoln St (between 4th and Kirkwood) Grant St (between 4th and Kirkwood) Lincoln St (between 6th and 7th) Sixth St (between Walnut and Washington) E Kirkwood Ave (between Walnut and S Washington St) E Fourth St (between Walnut and S Washington St)
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53334595037083 39.16559640665622,-86.53295703006368 39.16559224749483),LINESTRING(-86.53233475757219 39.16634089258267,-86.53234012199023 39.165937457053104),LINESTRING(-86.53107948375322 39.166365847281696,-86.53108484817125 39.16593329791186),LINESTRING(-86.52979738784411 39.166361688165836,-86.52980811668016 39.16589170648615),LINESTRING(-86.53332181048968 39.16756990099017,-86.53276927543264 39.16756574194545),LINESTRING(-86.53233475757219 39.16844329492639,-86.53232939315416 39.167782011943274),LINESTRING(-86.53105266166308 39.16843913593334,-86.53105266166308 39.16764892279255),LINESTRING(-86.53351492953877 39.166586280071925,-86.53236157966235 39.16658004141755))

Union Street & Related Sidewalk Closures

Union Street between 10th St and Student Services

May 7, 2018 to August 3, 2018
Union Street from 10th Street south past the entrance drive for the Student Services building will be closed from May 7-August 3, 2018, for underground utilities work. The service drive for Eigenmann Hall and the loading dock for Cedar Hall also will be unavailable. The Student Services building parking lot will be accessible from Jefferson Street. Sidewalks on the west side of Union Street will be open; sidewalks on the east side of Union Street will be closed. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.50945283246612 39.17150008829023,-86.50945775912348 39.17053949398948,-86.50946087909315 39.169162342135934),LINESTRING(-86.50942601037596 39.17053939612137,-86.50864280534361 39.170551872727174))

Fullerton Pike, Phase I

Rhorer Road

May 7, 2018 to November 29, 2018
This segment of Rhorer Road is to be closed for the road reconstruction project and signal installation. Detour routes are posted for this closure.
Monroe County Highway Department
LINESTRING(-86.53135528781597 39.12145920805793,-86.52659168460553 39.12142591389073)

Woodlawn Reconstruction Project

North Woodlawn Avenue

May 7, 2018 to August 27, 2018
North Woodlawn Avenue from East 7th Street to East 9th Street may have temporary lane restrictions as construction activities are completed.
Indiana University
LINESTRING(-86.52349151445007 39.17040812819309,-86.52349687886812 39.16849085988761,-86.52457512689209 39.16849085988761)

Woodlawn Avenue Closure & 8th Street/Forrest Two-Way Traffic (05/07/2018-08/24/2018)

Woodlawn Avenue

May 7, 2018 to August 11, 2018
Woodlawn Avenue between 7th and 8th Streets will be closed from May 7-August 24, 2018, for underground utilities work. Traffic on 8th Street and Forrest Avenue/University Road will become two-way to serve as a detour. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.52349258772658 39.16943458405507,-86.52349258772658 39.1685162854173),LINESTRING(-86.52349258772658 39.1685162854173,-86.52348829625765 39.1685162854173))

Trades District

W 10th St

May 14, 2018 to October 31, 2018
W 10th St between N Morton st and N Rogers st will be closed for construction.
Planning & Transportation
LINESTRING(-86.53612471891017 39.17168307578683,-86.5366879828033 39.17168307578683,-86.53681136441797 39.17163732895733,-86.53726197553249 39.171258876771816,-86.53737616100199 39.17123808263665,-86.5380091623295 39.17125471794526,-86.53837394275553 39.171387800272555,-86.5385670618046 39.171404435545725)

East/West Grimes Lane at South Walnut Street Closure

East/West Grimes Lane at South Walnut Street

June 4, 2018 to August 3, 2018
East/West Grimes Lane is closed at South Walnut Street to facilitate a sanitary sewer infrastructure project. Signage is in place. This closure is in place for the duration of the project.
Utilities
LINESTRING(-86.53371609521484 39.15336428976556,-86.53372682405092 39.153347650225726)

South Walnut Street Sanitary Sewer Installation Project

South Walnut Street, between Hillside Drive and East Allen Street

June 4, 2018 to August 3, 2018
South Walnut Street, between just north of Hillside Drive and East Allen Street, is reduced to two lanes with one lane of traffic flowing in either direction. This is to facilitate a sanitary sewer infrastructure installation project. Signage is in place.
Utilities
LINESTRING(-86.5337061657822 39.15559845483716,-86.53373835229037 39.151114098869186)

Tapp Road & Rockport Road Intersection Improvement

Tapp Road & Rockport Road

June 10, 2018 to November 23, 2018
Installation of a traffic signal and other improvements at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
LINESTRING(-86.54948049435549 39.136365399922454,-86.54765659222537 39.13631546923446,-86.54875093350344 39.13633211280106,-86.5491586292737 39.135899378790896,-86.5481501186841 39.13688134829175)

South Baytree Lane Water Line Installation Project

June 11, 2018 07:00 am to 14:30 pm July 13, 2018
The City of Bloomington Utilities has scheduled a water line installation project, weather permitting. Signage will be in place. Work will occur during the hours of 7:00 a.m. and 2:30 p.m., Monday through Friday.
Utilities

Traffic Signal Work

2nd Street and Walker Street

June 11, 2018 to August 6, 2018
Traffic signal work, possible lane restrictions.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.54600815263053 39.161440488590074,-86.5462388226058 39.16144568784861),LINESTRING(-86.54614762749931 39.16150495936904,-86.54614092197676 39.161370818488365))

Traffic Signal Work

1st Street and College Avenue

June 11, 2018 to August 6, 2018
Traffic signal and crosswalk work, possible lane restrictions.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53497181895827 39.159450180112685,-86.53497450116728 39.159319154963356),LINESTRING(-86.53489269379234 39.159383627686395,-86.53507374290085 39.159383627686395))

Traffic Signal Work

2nd Street and Rogers Street

June 11, 2018 to August 6, 2018
Traffic signal, crosswalk and sidewalk work, possible lane restrictions.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53848303440942 39.161397214961966,-86.53889073017969 39.16139929466675),LINESTRING(-86.53868688229454 39.16156567084738,-86.53868688229454 39.16125371518589))

Traffic Signal Work

Walnut Street and North Drive

June 11, 2018 to July 23, 2018
Traffic signal and crosswalk work, possible lane restrictions.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53185926989694 39.14416107135267,-86.53182149990563 39.14403887801714,-86.53176539258142 39.14385735941892),LINESTRING(-86.53162323550364 39.144077862734036,-86.53182440117976 39.1440383386057))

South Baytree Lane Water Line Installation Project

South Baytree

June 11, 2018 07:00 am to 14:30 pm July 20, 2018
The City of Bloomington Utilities has scheduled a water line installation project, weather permitting. Signage will be in place. Work will occur during the hours of 7:00 a.m. and 2:30 p.m., Monday through Friday.
Utilities
LINESTRING(-86.52377046418778 39.123852586405405,-86.52265466523758 39.123627858106516,-86.5225151903688 39.12371941416666,-86.52249373269669 39.124168869463375,-86.52271903825394 39.12458502921814)

Tapp Road and Pinehurst Drive

Intersection of Tapp Road and Pinehurst Drive

June 11, 2018 to November 23, 2018
The intersection of Tapp Road and Pinehurst Drive will be closed to traffic during the re-construction of the Tapp Road and Rockport Road Intersection Improvement Project.
Planning & Transportation
LINESTRING(-86.55000246835337 39.13667389442412,-86.55000246835337 39.136357667521)

Traffic Signal Work

Miller Drive and Walnut Street

June 18, 2018 to July 16, 2018
Traffic signal and crosswalk work, possible lane restrictions.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53266389161384 39.14700128527289,-86.53263713513995 39.146912624349994,-86.53260488301548 39.146805752753096),LINESTRING(-86.53246272593772 39.146912879679604,-86.53263572841918 39.146912879679604))

Traffic Signal Work

Grimes Lane and Walnut Street

June 18, 2018 to July 23, 2018
Traffic signal and crosswalk work, possible lane restrictions.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53372461464332 39.15348180419596,-86.53372461464332 39.15335700775955,-86.53372461464332 39.15323013115571),LINESTRING(-86.5338654306166 39.153354927817105,-86.53372863795684 39.15335700775955,-86.53359586861062 39.15337884715191))

Traffic Signal Work

E 10th St

June 25, 2018 to July 18, 2018
Traffic signal work, possible lane restrictions, expect possible delays.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.52696896871385 39.17159241713787,-86.52696896871385 39.17172549882608),LINESTRING(-86.52685631593522 39.17166311681609,-86.5270521171933 39.17166311681609))

Atwater Ave Sidewalk -Indiana University

Atwater Ave

June 27, 2018 to August 8, 2018
The northern lane of Atwater Ave between Faculty Ave and Highland Ave will be closed one block at a time west to east while Indiana University reconstructs the sidewalk on the north side of Atwater Ave. Pedestrians will be routed to the south side of Atwater Ave at Woodlawn and Jordan Ave
Planning & Transportation
LINESTRING(-86.52098577184984 39.16312156617545,-86.517767121032 39.163100769634354)

W 3rd St-Median Installation-Gilliatte

W 3rd St

July 9, 2018 to July 13, 2018
W 3rd street between Landmark Ave and Patterson Dr will have a one lane closure eastbound and westbound. Vehicles will be directed around construction in the northern lane (west) and the southern lane (east). The closures will be in place between the hours of 8pm-6am with only the center turn lane closed during daytime hours. Gilliatte contractor will be constructing a median in the center turn lane during this time.
Planning & Transportation
LINESTRING(-86.5534464247284 39.16440063762835,-86.55258275342563 39.16439647839624)

Utility Work

July 12, 2018
There will be lane restrictions on E 3rd St between Walnut and Washington St and a full closure of Washington St between 3rd and 4th St. Signage will be in place to direct traffic. These closures will be in place from 8pm-6am July 12th, July 16th and August 1st
Planning & Transportation

Utility Work

July 12, 2018
There will be lane restrictions on E 3rd St between Walnut and Washington St and a full closure of Washington St between 3rd and 4th St. Signage will be in place to direct traffic. These closures will be in place from 8pm-6am July 12th, July 16th and August 1st
Planning & Transportation

North College Avenue Road Repair Project

North College Avenue, between West 15th Street and West 17th Street.

July 12, 2018 06:30 am to 14:30 pm
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. To facilitate this work, North College Avenue, between West 15th Street and West 17th Street, will be reduced to one lane. Signage will be in place.
Utilities
LINESTRING(-86.53470314813241 39.17899967794506,-86.53474606347663 39.1768788779726)

South Smith Road

South Smith Road from East 3rd Street to East Brighton Crest Road

July 12, 2018 to July 19, 2018
City of Bloomington Street Department will have LANE RESTRICTIONS for a Resurfacing Project.
Street
LINESTRING(-86.48118931312588 39.16422946024227,-86.48116785545378 39.163929994174,-86.48073870201138 39.162998313808686,-86.48060995597868 39.157607635178834)

E 3rd St

E 3rd St between Walnut and Washington

July 12, 2018
There will be lane restrictions on E 3rd St between Walnut and Washington St and a full closure of Washington St between 3rd and 4th St. Signage will be in place to direct traffic. These closures will be in place from 8pm-6am July 12th, July 16th and August 1st
Planning & Transportation
LINESTRING(-86.53357896935032 39.164606260964376,-86.53239879738375 39.164602101744464)

North Madison Street

July 16, 2018 to July 26, 2018
City of Bloomington Street Department will have LANE RESTRICTIONS for a Handicap Ramp Installation Project.
Street

Culvert Replacement

Flatwoods Road

July 16, 2018 to July 18, 2018
We will be replacing a culvert pipe at this location. The road will be closed during this project. Weather permitting.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.68426312280315 39.25268308384466,-86.65915764642374 39.25235076250388),LINESTRING(-86.65915764642374 39.25235076250388,-86.6591147310795 39.252317530283136))

Pavement Overlay

Kirby Road

July 16, 2018 to July 19, 2018
Highway crews will be working on a pavement overlay for Kirby Road. This will be performed under flagging conditions. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.61019123864753 39.13667389442412,-86.61062039208991 39.1648955844916)

North Madison Street

North Madison Street from West 17th Street to West 15th Street.

July 16, 2018 to July 26, 2018
City of Bloomington Street Department will have LANE RESTRICTIONS for a Handicap Ramp Installation Project.
Street
LINESTRING(-86.53774138687018 39.17899006883417,-86.53773065803412 39.17684431759977)

W 6th St

July 17, 2018 to July 18, 2018
Snedegar Construction will have W 6th st closed between the alley and College Ave from 6am-6pm while they install a fireline.
Planning & Transportation

E 10th St

July 17, 2018 to July 19, 2018
Case Construction will have one lane closed on E 10th St between Lincoln St and Grant St while they replace sidewalk on the north and south side of 10th St
Planning & Transportation

E 10th St

July 17, 2018 to July 19, 2018
Case Construction will have one lane closed on E 10th St between Lincoln St and Grant St while the replace sidewalk on the north and south side of 10th St
Planning & Transportation

E 10th St

July 17, 2018 to July 20, 2018
Case Construction will have one lane closed on E 10th St between Lincoln St and Grant St while they replace sidewalk on the north and south side of 10th St
Planning & Transportation

No Parking on East side North Lincoln between E 7th and E 6th St

North Lincoln between E 7th and E 6th Street

July 17, 2018 to July 18, 2018
Tree Removal
Street
LINESTRING(-86.5310621620475 39.167553273026954,-86.53105679762946 39.168534800928)

W 6th St

W 6th St between Morton and College Ave

July 17, 2018 to July 18, 2018
Snedegar Construction will have W 6th st closed between the alley and College Ave from 6am-6pm while they install a fireline. Signage and a detour will be in place.
Planning & Transportation
LINESTRING(-86.53549171758267 39.16757821907879,-86.53489358497234 39.16757406003458)

E 3rd St

E 3rd between Walnut and Washington

July 17, 2018 20:00 pm to 06:00 am August 2, 2018
There will be lane restrictions on E 3rd St between Walnut and Washington St and a full closure of Washington St between 3rd and 4th St. Signage will be in place to direct traffic. These closures will be in place from 8pm-6am July 12th, July 16th and August 1st
Planning & Transportation
LINESTRING(-86.53359021578274 39.164617063473855,-86.53239931498013 39.16461290425457)

E 10th St

E 10th St, N Lincoln St to N Grant St

July 17, 2018 to July 24, 2018
Case Construction will have one lane closed on E 10th St between Lincoln St and Grant St while they replace sidewalk on the north and south side of 10th St
Planning & Transportation
LINESTRING(-86.53098175605464 39.171704966758654,-86.52982304176021 39.171704966758654)

No Parking South Side of 400 Block of E 7th

400 Block of East 7th Street between North Grant Street & North Dunn Street- No Parking on South side of the street.

July 18, 2018 to July 20, 2018
No Parking on South side of the 400 block of East 7th for tree removal.
Street
LINESTRING(-86.52826237665025 39.16851974578816,-86.52977514253463 39.168523904776436)

W 11th St

July 19, 2018 to July 20, 2018
Milestone Contractors will have a one lane closure on W 11th St between Rogers and Morton St from 7am-5pm while they install a storm structure for the Trades District Project. Flaggers and signage will be in place to direct traffic.
Planning & Transportation

One Lane Traffic

July 19, 2018 07:00 am to 09:00 am
Pritchett Brothers Construction will have a lane on Kirkwood closed to do work on the Carmichael Building. Signage and personnel will be in place to direct traffic.
Planning & Transportation

East 2nd Street Road Repair Project

East 2nd Street, between South High Street and South Eastside Drive.

July 19, 2018 07:00 am to 15:00 pm
The City of Bloomington Utilities will be doing a street repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.51268757653801 39.16099310430417,-86.50846041513054 39.16100974203604)

The Bryan Park Kids Triathlon

Woodlawn Drive, S. Manor Drive and E. Southdowns Drive, South Hawthorne Drive, East Sheridan Dr

July 21, 2018 08:00 am to 10:30 am
Participants will cross Woodlawn to the start line at the intersection of S. Manor Drive and E. Southdowns Drive. The biking portion of the triathlon will take place from S. Manor Drive and E. Southdowns Drive, turning onto South Hawthorne Dr. and then onto E. Sheridan Drive, making a .15 loop five times. The biking portion will take approximately 30 minutes.
Public Works
LINESTRING(-86.52171496618618 39.155945882888545,-86.52049307100467 39.155955126764724,-86.52050499197 39.155765627695274,-86.52172688715152 39.15579798121249,-86.52170304522085 39.15593663901117)

South Sare Road

July 23, 2018 to August 3, 2018
There will be single lane restrictions, both directions. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street

South Sare Road

July 23, 2018 to August 3, 2018
There will be single lane restrictions, both directions. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street

East 11th Street Stormwater Project

July 23, 2018 08:00 am to 15:00 pm
The City of Bloomington Utilities has scheduled a stormwater infrastructure installation project. Signage is in place.
Utilities

East 11th Street Stormwater Project

July 23, 2018 08:00 am to 15:00 pm
The City of Bloomington Utilities has scheduled a stormwater infrastructure installation project. Signage is in place.
Utilities

Pritchett Brothers

500 E. 5th

July 23, 2018
meters 500A&B, 501A, 502A&B, 503A, 504A&B, 505A&B, 506A&B, 507A&B
Controller
GEOMETRYCOLLECTION(LINESTRING(-86.52698953672002 39.166497325124396,-86.52808816848479 39.16647070621897),LINESTRING(-86.52805383673326 39.166523943004364,-86.52695520496852 39.16644408831888))

400 Block of East 7th Street

400 Block of East 7th Street between North Grant Street & North Dunn Street- No Parking on South side of the street.

July 23, 2018 to July 24, 2018
Stump removal
Street
LINESTRING(-86.52826326886903 39.16852045566131,-86.52978408138047 39.16852877363752)

Stanford Road

Approximately 1,680' north of SR 45 (5928 address)

July 23, 2018 to July 25, 2018
This road will be closed for a culvert replacement project. You can get to the north of this project by taking Elwren Road off of SR 45 to Stanford Road. The project is subject to weather permitting.
Monroe County Highway Department
POINT(-86.66628159356696 39.094919665133915)

Kirkwood Ave - Dunn to Indiana - One Lane Traffic

Kirkwood Ave - Dunn to Indiana

July 23, 2018 07:00 am to 09:00 am
Pritchett Brothers Construction will have a lane on Kirkwood closed to do work on the Carmichael Building. Signage and personnel will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.5281604272757 39.16654988791362,-86.5269963485632 39.16653741059787)

South Baytree Lane Water Line Installation Project

South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive.

July 23, 2018 07:00 am to 14:30 pm July 27, 2018
The City of Bloomington Utilities has scheduled a water line installation project, weather permitting. Signage will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52377582860585 39.123863549262325,-86.52266002965564 39.12362633607381,-86.52248836827869 39.1238593876343,-86.52271367383595 39.12457102244903),LINESTRING(-86.52271367383595 39.12457102244903,-86.52269758058185 39.12457102244903))

W 11th St

W 11th St between Rogers and Morton St

July 23, 2018
Milestone Contractors will have a one lane closure on W 11th St between Rogers and Morton St from 7am-5pm while they install a storm structure for the Trades District Project. Flaggers and signage will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.53846896958919 39.17328003736401,-86.5361300833282 39.173284196070824)

East 11th Street Stormwater Project

East 11th Street, between North Fee Lane an North Walnut Grove Street.

July 23, 2018 08:00 am to 15:00 pm
The City of Bloomington Utilities has scheduled a stormwater infrastructure installation project. Signage is in place.
Utilities
LINESTRING(-86.5210024244842 39.173403758785014,-86.51894248796076 39.17332058474446)

Pavement Markings

Roundabout at East Rogers Road and South Sare Road

July 23, 2018
The roundabout at East Rogers Road and South Sare Road will have Lane Restrictions for pavement markings on Monday, July 23, 2018 from 8:00PM to 6:00AM July 24, 2018. Flaggers will be in place. If you have any questions, please call City of Bloomington Street Department 812-349-3448.
Street
LINESTRING(-86.4965145605435 39.13618371718101,-86.4966593998303 39.13596735005237,-86.49705636676451 39.135904936333986,-86.49661112006804 39.135671924629946,-86.49636435683867 39.13563863718076,-86.49594056781432 39.13580507426954,-86.49579036410947 39.13586748807646,-86.49624633964201 39.13597151096491,-86.49632680591246 39.136008959167185,-86.49646628078123 39.1362752569199,-86.4964984672894 39.13620036077876)

South Sare Road

South Sare Road from East Moores Pike to East David Drive.

July 23, 2018 to August 2, 2018
There will be single lane restrictions, both directions. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.49830354915079 39.15043801625984,-86.49892582164225 39.14973912313715,-86.49905456767496 39.14930647153548,-86.49901165233072 39.147467672555706,-86.49896873698647 39.14701836595407,-86.498700516085 39.14655241533771,-86.49849666819986 39.14638600365575,-86.4974774287742 39.145861804285914,-86.49717702136454 39.14555393934424,-86.49700535998758 39.14516286572001,-86.49694098697123 39.1443557494558,-86.49683369861066 39.143939706529636),LINESTRING(-86.49687661395483 39.14398963181054,-86.49659766421728 39.1430909713354,-86.4965118335288 39.13858085384183))

South Covenanter Drive

July 24, 2018 to July 25, 2018
Closed for tree removal
Street

Snow Road

9035 Snow Road, between Lee Phillips Road and Rockeast Road

July 24, 2018 to July 26, 2018
This segment of roadway will be closed for a culvert replacement project. Weather permitting.
Monroe County Highway Department
POINT(-86.65263451409912 39.01957301572642)

South Covenanter Drive

South Covenanter Drive closed between E Ruby Lane and South High Street

July 24, 2018 to July 25, 2018
Closed for tree removal
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50850231665464 39.15418536375421,-86.50891618130919 39.1542012128441),LINESTRING(-86.50891618130919 39.1542012128441,-86.50936571947463 39.15461324324332))

East 11th Street Stormwater Improvement Project

East 11th Street, between North Fee Lane and North Walnut Grove Street.

July 24, 2018 07:00 am to 15:00 pm
The City of Bloomington Utilities has scheduled a stormwater infrastructure improvement project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52095950914001 39.17341106801416,-86.51891030145264 39.17331125916405)

N College Ave

N College Ave between 14th and 11th St

July 24, 2018
Goodman Construction will have the western lane of College Ave closed between 14th and 11th St to mill and pave an old sanitary sewer patch. The work will take place between the hours of 9am-4pm. An arrow board and signage will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.53476752114867 39.175941559399575,-86.53482116532895 39.173321624420566)

S. Walnut Street

July 24, 2018 19:00 pm to 07:00 am July 26, 2018
There will be single lane restrictions, both directions, just north of Rhorer Road/Gordon Pike for a fire hydrant relocation. The work will be performed from 7:00 pm to 7:00 am both nights. This is weather permitting.
Monroe County Highway Department

S. Walnut Street

Just north of Rhorer Road/Gordon Pike

July 25, 2018 19:00 pm to 07:00 am July 27, 2018
There will be single lane restrictions, both directions, just north of Rhorer Road/Gordon Pike for a fire hydrant relocation. The work will be performed from 7:00 pm to 7:00 am both nights. This is weather permitting.
Monroe County Highway Department
POINT(-86.531398666626 39.12180969476307)

Rogers St - One Lane South of 11th

Rogers St. - Between 10th and 11th

July 25, 2018 07:00 am to 16:00 pm daily for 2 times
Milestone will have Rogers Street down to one lane for utility work south of 11th Street. Flaggers will be directing traffic
Planning & Transportation
LINESTRING(-86.53861344655387 39.173089659529325,-86.5386778195702 39.169629520907904)

Milestone Lane Restriction on North Rogers

Rogers Street from 10th to 11th

July 25, 2018 to July 26, 2018
Milestone will have Rogers Street down to one lane between 10th and 11th Street from 7/25 at 7 am until 7/26 at 4 pm. Signage and flaggers will be in place.
Planning & Transportation
LINESTRING(-86.53852261376947 39.17322538025425,-86.53854407144159 39.171378888719374)

East Hector Drive/East Deckard Drive Stormwater Project

East Hector Drive at East Deckard Drive

July 26, 2018 08:30 am to 15:00 pm
East Hector Drive at East Deckard Drive is closed to all traffic to facilitate a stormwater infrastructure installation project. Signage is in place.
Utilities
POINT(-86.48088730645749 39.173827944861586)

East 1st Street

July 30, 2018 to August 2, 2018
There will be single lane restrictions, both directions. At times could have intermittent road closures. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street

East 1st Street

East 1st Street from South Park Avenue to South Highland Avenue.

July 30, 2018 to August 2, 2018
There will be single lane restrictions, both directions. At times could have intermittent road closures. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.52372322422882 39.159314267484945,-86.5177043471994 39.15926435307472)

Southshore Drive maintenance

Between Richardson Road and Brown County Line

July 30, 2018 to August 2, 2018
This section will be closed for some embankment stabilization work to be completed and a culvert pipe repair.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.38880063109663 39.2511396243556,-86.38232041411665 39.25090699446204,-86.37927342467574 39.25097346022466,-86.37165356688764 39.250807295699985,-86.369379053643 39.2503752660931,-86.36873532347943 39.250342032936175),LINESTRING(-86.36860657744671 39.250308799763474,-86.36864949279095 39.250342032936175))

Old Myers Road

Between Old SR 37 North and Little Horse Road

July 30, 2018 to August 1, 2018
The section of roadway will be closed for a culvert replacement. Weather permitting.
Monroe County Highway Department
POINT(-86.5036946278873 39.2296874176954)

South Baytree Lane Water Line Installation Project

South Baytree Lane at East Pepperridge Drive

July 30, 2018 07:00 am to 15:00 pm
The City of Bloomington Utilities is doing a water line installation project, weather permitting. Signage is in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52266732661396 39.124554469935106,-86.52247420756488 39.12368885450809,-86.5233432432857 39.12361394498066,-86.52379385440021 39.12384699658216),LINESTRING(-86.52379385440021 39.12384699658216,-86.52375093905597 39.12385531983938))

South Sage Court Water Line Installation Project

South Sage Court at East Pepperridge Drive

July 31, 2018 07:00 am to 15:00 pm August 24, 2018
The City of Bloomington Utilities has scheduled a water line installation project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52443565202314 39.12384788195561,-86.52451075387556 39.123602345428196,-86.52484334779342 39.12351078921586)

East 12th Street Road Repair Project

East 12th Street, between North Washington Street and North Grant Street

July 31, 2018 07:00 am to 14:00 pm
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53227843118283 39.174385205033815,-86.52972496820065 39.17436857046576)

East 8th Street Road Repair Project

East 8th Street, between North Washington Street and North Lincoln Street.

July 31, 2018 07:00 am to 10:00 am
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53232134652713 39.16950279039219,-86.52976788354496 39.16949447253117)

East 1st Street closed

East 1st Street closed between South Woodlawn Avenue and South Hawthorne Drive.

July 31, 2018
Closed for tree and stump removal
Street
LINESTRING(-86.52021298142839 39.15930076148172,-86.5226243947259 39.15930870620551)

City of Bloomington Utilities Sanitary Sewer Repair Project

200 block South Smith Road

July 31, 2018 21:00 pm to 04:00 am August 1, 2018
The City of Bloomington Utilities has scheduled a sanitary sewer repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.48125208688343 39.16623379523216,-86.48116625619497 39.16430393541856)

City of Bloomington Utilities Sanitary Sewer Repair Project

200 Block South Smith Road

July 31, 2018 21:00 pm to 04:00 am August 1, 2018
The City of Bloomington Utilities has scheduled a sanitary sewer repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.48129500222767 39.166200522235755,-86.48123062921131 39.16427066150922)

Old Meyers Road

Between Little Horse Road and Boltinghouse Road

July 31, 2018 to August 2, 2018
The section of road will be closed for a culvert replacement. Weather permitting.
Monroe County Highway Department
POINT(-86.4872603048962 39.22594722270128)

Intersection improvements with water and sewer line replacements.

Walnut Street Pike, from Rhorer Road to approximately 400' south

August 3, 2018 to September 7, 2018
Walnut Street Pike will be closed south of the Rhorer Road intersection. Traffic will be able to travel between Rhorer Road to the east of the intersection and Walnut St Pike to the north of the intersection. Detour will use Winslow Road, Walnut Street/Old SR 37 South and Fairfax Road.
Monroe County Highway Department
POINT(-86.52669943643191 39.12142681279482)

Winslow Farms Block Party

2000 block S. Sweetbriar Circle and a portion of S. Sweetbriar Drive after 2241 Sweetbriar Drive

August 4, 2018 14:00 pm to 19:00 pm
Winslow Farm Community Association requests the Board’s permission to close a public street to hold a neighborhood block party on Saturday, August 4th (raindate, Sunday, August 5th) from 2:00 p.m. until 7:00 p.m. so their neighborhood can get together for a neighborhood block party. Pending Board approval the Petitioner will be closing down a portion of the 2000 block S. Sweetbriar Circle and a portion of S. Sweetbriar Drive after 2241 Sweetbriar Drive. A noise permit is part of the resolution so music may be played during the event.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52541495429969 39.141772971035124,-86.5259156335341 39.14173136532668,-86.52622698204301 39.141569565129686,-86.52640579586821 39.141241340589175,-86.5263521516879 39.14097783544841,-86.52614949593206 39.14071432906738,-86.52577398666998 39.140510920230156,-86.52526734711661 39.140362986115036),LINESTRING(-86.52540443772685 39.14175447955577,-86.52494548203484 39.14174523381425,-86.52470706338298 39.14172674245455))

Prospect Hill Neighborhood Association Street Painting Party

the intersection of Fairview and Howe Street

August 4, 2018 10:00 am to 19:00 pm
The Prospect Hill Neighborhood Assocation will be hosting a Street Mural Painting Party on Saturday, August 4th from from 10:00 a.m. until 7:00 p.m. Prospect Hill Neighborhood is requesting permission to paint and close the intersection of Fairview and Howe Street to install a public art project in the street.
Public Works
LINESTRING(-86.54105186608044 39.16239604851239,-86.54087007193206 39.162393737754996,-86.54095351836199 39.16239604851239,-86.54095649868519 39.16248154622775)

South Sare Road

South Sare Road from East Moores Pike to East David Drive

August 6, 2018
There will be single lane restrictions, both directions. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.49830223437368 39.15041707623709,-86.49896742220938 39.1496516212749,-86.49905325289784 39.14928553117605,-86.4989888798815 39.14717215565176,-86.49890304919302 39.146839334824904,-86.49855972643911 39.14637338302333,-86.49750830050526 39.14579093893363,-86.49714352007925 39.14542482875322,-86.49697185870228 39.1450753581683,-86.49688602801382 39.143960368989156,-86.49662853594837 39.14352768186444,-86.49654270525991 39.138618160900506)

Culvert Replacement

Between Eller Road and SR 45

August 6, 2018 to August 7, 2018
This segment of roadway will be closed for a culvert replacement. The road should reopen at the end of the day on Tuesday. This project is weather permitting. Please use caution in this area.
Monroe County Highway Department
POINT(-86.64293488214112 39.1210741056297)

Gifford Road

Between Cave Road and Gifford Road

August 6, 2018 to August 7, 2018
This segment of roadway will be closed for a culvert replacement.
Monroe County Highway Department
POINT(-86.63514289379196 39.15154845841468)

North Woodlawn Avenue

North Woodlawn Avenue from East 7th Street to East 9th Street

August 7, 2018 to August 9, 2018
Street Department will have road CLOSED. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.52347413155861 39.17042860565169,-86.52349558923073 39.16849054295693)

W. Maple Grove Road

Between SR 46 and Matthews Road

August 8, 2018 to August 9, 2018
This segment of roadway will be closed for a culvert replacement.
Monroe County Highway Department
POINT(-86.62924565148936 39.24570400494861)

East Rogers Road and South Sare Road Roundabout

East Rogers Road and South Sare Road Roundabout.

August 9, 2018 to August 10, 2018
There will be single lane restrictions, both directions for pavement markings. The work will be performed from 6:00 PM to 6:00 AM, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.49650452866935 39.13634563254041,-86.49651257529639 39.136214564372096,-86.49654476180456 39.13610638093826,-86.49665473237417 39.13600651915951,-86.49675397410773 39.13595450776032,-86.49708120360754 39.13590457678097),LINESTRING(-86.49708120360754 39.13590457678097,-86.49681566491508 39.13581095609922,-86.49666546121023 39.135725657147475,-86.49661718144796 39.135679886935634,-86.49652598634145 39.13527835607471),LINESTRING(-86.49650721087836 39.13528251702806,-86.49645893111608 39.1354635182588,-86.49632482066535 39.13567780647077,-86.49630604520225 39.135704852509434,-86.49582056537054 39.135844243467005,-86.4958152009525 39.13589209403057,-86.49612901940726 39.135950346846755,-86.49631140962026 39.13603980643484,-86.49638114705466 39.13610638093826,-86.4964991642513 39.13633939120459),LINESTRING(-86.4974352551975 39.13582343886398,-86.49744598403356 39.13583384116623),LINESTRING(-86.49744061961553 39.135825519324555,-86.49744330182456 39.13583176070594))