Choose types
Indiana University, North Student Housing Project. North Walnut Grove from East 13th Street to East 17th Street. November 1, 2019 to August 28, 2021
Indiana University will be closing North Walnut Grove due to the construction of the North Student Housing Project.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.52101310090174 39.175222108212836,-86.52109893159022 39.17799999281107),LINESTRING(-86.5210238297378 39.175014178304025,-86.52101310090174 39.17417413521264))
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
14th Street (Madison to Woodburn) Sidewalk 14th Street between N. Madison Street and North Woodburn Avenue February 22, 2021 to September 27, 2021
Installation of a new sidewalk on the north side of West 14th Street from North Madison Street to North Woodburn Avenue.
Planning & Transportation
LINESTRING(-86.53603435828074 39.1760075241593,-86.53765499009847 39.176000358787235)
E Gilbert Dr E Gilbert Dr from N Walnut St to N Lavern Dr May 1, 2021 to September 1, 2021 daily until September 1, 2021
E Gilbert Dr will be closed for sanitary sewer replacement.
Planning & Transportation
LINESTRING(-86.53331652707108 39.189363110139965,-86.53298272283654 39.18936728302555,-86.53242279315278 39.18920871319881)
7-Line, 7th Street Protected Bike Lane 7th Street from the B-Line Trail to North Indiana Avenue. June 1, 2021 to October 30, 2021
Eastbound lane closed to through traffic.
Planning & Transportation
LINESTRING(-86.53697688912268 39.168565471661935,-86.52705066426013 39.16851254375996)
17th and Dunn Signal Improvement Project Intersection of 17th Street and Dunn Street. June 1, 2021 to August 20, 2021
The intersection of 17th Street and Dunn Street will be closed to traffic for the 17th and Dunn Signal Improvement Project. Detour signage will be in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.5283516771851 39.17860103144571,-86.52834094834904 39.179274687751104),LINESTRING(-86.5289310343323 39.17897528574562,-86.52787960839846 39.179016869433724))
Discovery Parkway East Discovery Parkway from IU Hospital to Old Range Road. June 28, 2021 to October 30, 2021
Multi-use trail construction. Westbound lane closed to through traffic.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.50080631205216 39.175586339267625,-86.50016470468856 39.17550344207967),LINESTRING(-86.50016470468856 39.17550344207967,-86.50002212527441 39.1755089685619,-86.49965141879764 39.17544265074639,-86.49929497026231 39.17542607128274,-86.4989599086391 39.17543159777108,-86.4988601030492 39.17537633286835,-86.49836820407042 39.175475809661975,-86.49819710877345 39.17553660096658,-86.49665012213008 39.175851609612295,-86.49627228668263 39.17584608315701,-86.49600851476647 39.17576318627525,-86.49586593535233 39.175669236357834))
N Madison St N Madison St from W 11th St to W 14th St August 2, 2021 to September 3, 2021
The street and sidewalks will be closed for bridge rehabilitation. This will be a 30 day full closure with a detour route posted.
Planning & Transportation
LINESTRING(-86.53854407144156 39.173451843732465,-86.5385655291137 39.17410059742869,-86.53770722222893 39.175614332776405,-86.53770722222893 39.175947017495645)
Kensington Place Kensington Place from Wexley Road to S Stratford Drive August 9, 2021 to August 18, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm Monday through Thursday
Street
LINESTRING(-86.51193812759409 39.13803585494438,-86.50946013957137 39.13809675465845)
Kensington Place Kensington Place from South Stratford Drive to Cul-de-sac August 9, 2021 to August 18, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50946918783738 39.13809008249993,-86.50865244778876 39.13809434839612),LINESTRING(-86.50865519775526 39.13809434839612,-86.50865519775526 39.13809434839612),LINESTRING(-86.5086441978893 39.13808794955176,-86.50865244778876 39.13809008249993))
South Wexley Rd/East Wexley Road South Wexley Rd/East Wexley Road from East Rock Creek Drive to South High Street August 9, 2021 to August 18, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm Monday through Thursday
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51236157323885 39.139809028119345,-86.51233788165254 39.13930921588678,-86.5121767788658 39.13889025289927),LINESTRING(-86.51215782559673 39.138882902649186,-86.51216041971144 39.13824248354288,-86.51208460663531 39.13810282737478,-86.51192350384855 39.138018298506864,-86.51078156938937 39.1372391580762,-86.51004239189719 39.137073773384884,-86.50811863509064 39.137073773384884))
625/631 N Walnut 625/631 N Walnut August 9, 2021 to August 20, 2021
Sidewalk replacement, weather permitting, 6:00 am to 4:00 pm Monday through Thursday.
Street
LINESTRING(-86.5336303388399 39.172501649603674,-86.53360619895875 39.17279276170544)
East Covenanter Dr and South Pickwick Place Southwest corner of East Covenanter Dr and South Pickwick Place August 9, 2021 to August 17, 2021
ADA Ramp replacement, weather permitting, 6:00 am to 4:00 pm Monday through Thursday.
Street
LINESTRING(-86.50471677277856 39.15496289562452,-86.50460222613432 39.15501453756511,-86.50463952039057 39.154915385005694)
South Wexley Rd/East Wexley Rd South Wexley Rd/East Wexley Rd from East Rock Creek to South High Street. August 12, 2021 to August 27, 2021
Milling/Paving, weather permitting, from 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51235344043191 39.13983020565803,-86.51234164308356 39.13934524787581,-86.51233377818465 39.13929949696919,-86.51218041265622 39.1389182382579,-86.51215681795952 39.13825026801845),LINESTRING(-86.51216468285841 39.13825941833849,-86.51209389876836 39.138122163412675,-86.511932668341 39.138021509630335,-86.51077652820352 39.13723457509914,-86.51008048465134 39.13707291691651,-86.50953387417817 39.137079017232026),LINESTRING(-86.5095378066276 39.137079017232026,-86.50952600927927 39.137079017232026))
Jackson Creek Trail PH II East Arden Drive from East Queens Way to South Sycamore Court. August 16, 2021 to August 20, 2021
Road closed to through traffic for the installation of a raised cross walk. Detour in place.
Planning & Transportation
LINESTRING(-86.5054165414061 39.14730132660918,-86.5046052414929 39.147282187937236,-86.50443557801296 39.14718888683706,-86.50432452555334 39.147078839226594,-86.50428750806681 39.14671759477406,-86.50428750806681 39.14627979272069)
East 11th Street East 11th Street from North Woodlawn Ave to North Walnut Grove Street August 17, 2021 to August 20, 2021
Resurfacing, weather permitting, from 6:00 am till 4:00 pm
Street
LINESTRING(-86.52080435008983 39.17340236631577,-86.52351835611327 39.17342924876465)
CBU Main Break W Coolidge Dr between S Brown Ave and S Milton Dr August 17, 2021 06:30 am to 15:00 pm
Please be advised that CBU crews have closed W Coolidge Dr between S Brown Ave and S Milton Dr due to water main repair. Normal traffic flow is expected to resume at 3:00pm. Cones are in place.
Utilities
LINESTRING(-86.54217658069012 39.141323061414255,-86.53996331666936 39.14124827928319)
Kensington Place Kensington Place from Wexley Rd to the end of the Cul-de-sac August 19, 2021 to August 27, 2021
Milling/Paving, weather permitting, from 6:00 am to 4:00 pm
Street
LINESTRING(-86.51194237088974 39.13803012948526,-86.50953341165865 39.13807803857986,-86.50864889124352 39.138093369483244)
3913 August 19, 2021 17:00 pm to 19:00 pm
Jordan Avenue from 7th Street to the bridge located just south of 275 N Jordan Avenue (Neal-Marshall Black Culture Center) will be closed for a mural reveal event associated with IU Culture Fest on 8/19 from 5 PM - 7 PM.
External Project
Northeast corner of West 2nd St & South Adams Street Northeast corner of West 2nd St & South Adams Street August 23, 2021 to August 25, 2021
ADA Ramp
Street
LINESTRING(-86.55082882212389 39.16048196512591,-86.55082882212389 39.16039180624594,-86.55068221209838 39.16039180624594)
1501 & 1601 S Olcott Blvd 1501 & 1601 S Olcott Blvd & E South Ct August 25, 2021 to August 27, 2021
ADA Ramp Replacement
Street
GEOMETRYCOLLECTION(LINESTRING(-86.48481246276826 39.14970992128036,-86.48481980887331 39.14963776055214,-86.48472920691101 39.14963965951958),LINESTRING(-86.48472430950764 39.1496434574544,-86.48472186080598 39.14963776055214),LINESTRING(-86.4848369497851 39.149546610052795,-86.48481246276826 39.14960737706545,-86.48471696340259 39.14961117500201),LINESTRING(-86.48425660748603 39.1491231384764,-86.48424681267929 39.149113643568796),LINESTRING(-86.48424926138097 39.149113643568796,-86.48424681267929 39.149119340513494))
East 6th Street East 6th Street between N Dunn Street and N Indiana Ave August 25, 2021
Tree/Stump removal between 6:00 am till noon.
Street
LINESTRING(-86.52826215411966 39.16753545507558,-86.52695163862549 39.16752606896955)
Student Involvement Fair 7th between Indiana and Woodlawn August 26, 2021 07:00 am to 19:00 pm
Student Involvement Fair
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52345551231441 39.168491276664355,-86.5269844493173 39.1685129047751),LINESTRING(-86.5269844493173 39.1685129047751,-86.5269844493173 39.1685129047751),LINESTRING(-86.52698096222538 39.16851560828849,-86.52698793640917 39.1685129047751),LINESTRING(-86.52698096222538 39.16851560828849,-86.52345899940632 39.168491276664355))
Bloomington PrideFest Kirkwood from Indiana to Mid-Block between Walnut and Washington, People's Park, Grant full Block North, half Block South. August 27, 2021 19:00 pm to 03:00 am August 29, 2021
Bloomington PrideFest
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52844115683224 39.16653342404217,-86.5284196624241 39.16655008894557),LINESTRING(-86.5281187407106 39.16655008894557,-86.5281187407106 39.16655008894557,-86.52693654826452 39.16655008894557),LINESTRING(-86.5277903973706 39.16700640728416,-86.5277903973706 39.16700640728416,-86.5281106718501 39.16700856651428),LINESTRING(-86.5277876123751 39.16701936266384,-86.52779318236607 39.166641496443816),LINESTRING(-86.5281106718501 39.16701072574432,-86.5281106718501 39.16701072574432,-86.5281106718501 39.16663717796098),LINESTRING(-86.52810788685463 39.16663717796098,-86.52779318236607 39.16663933720244),LINESTRING(-86.5284196624241 39.16655008894557,-86.53091301376492 39.16656675384499),LINESTRING(-86.5297953045432 39.167300005510555,-86.52985978776753 39.167583305243056),LINESTRING(-86.52981679895132 39.167549975922014,-86.52983829335942 39.16610013516885),LINESTRING(-86.52983829335942 39.16610013516885,-86.52981679895132 39.166116800174876,-86.52979945633591 39.16730004208904,-86.5297953045432 39.167583305243056),LINESTRING(-86.52977381013508 39.167549975922014,-86.52981679895132 39.167549975922014),LINESTRING(-86.52981679895132 39.16756664058451,-86.52975231572697 39.16756664058451),LINESTRING(-86.53293348812733 39.16660008363212,-86.53252509437323 39.16660008363212,-86.53258957759755 39.1665667538451),LINESTRING(-86.53286900490299 39.16661674851969,-86.53286900490299 39.16661674851969),LINESTRING(-86.53119244107037 39.166550088945684,-86.5322671614759 39.1665667538451),LINESTRING(-86.53220267825156 39.16658341874057,-86.53123542988659 39.1665667538451))
10th closed for emergency repair 10th from College to Walnut August 27, 2021 06:00 am to 15:00 pm
Beginning 8/27/21 at 6:00 am, CBU will close 10th St between Walnut and College for a main break repair. The work will take approximately 9 hours. Signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53474281668312 39.171682003406346,-86.53364329535566 39.17169871740347),LINESTRING(-86.53389122689853 39.171682003406346,-86.53365407550285 39.17164857555326))
Night Work: Southbound lane restriction on S Rogers north of W Country Club Dr S Rogers north of W Country Club Dr August 30, 2021 19:00 pm to 06:00 am September 1, 2021
Night work: Lane restriction for a sewer connection to occur over night (7 PM - 6 AM) on 8/30 and 8/31, ending on the morning of 9/1.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53833004167943 39.13694767741836,-86.53827112236239 39.136339508975084),LINESTRING(-86.53827112236239 39.136339508975084,-86.53826658981464 39.13633599332135),LINESTRING(-86.53826658981464 39.13633599332135,-86.5383345738814 39.13694416192911))
W Kirkwood West Kirkwood between N Rogers & N Madison August 30, 2021 to August 31, 2021
Tree removal
Street
LINESTRING(-86.53867896660797 39.16661395442526,-86.53743453184414 39.166607702852644)
W Kirkwood W Kirkwood from N Rogers to N Madison St September 2, 2021 to September 3, 2021
Tree Removal
Street
LINESTRING(-86.53867202009049 39.16661671441824,-86.53744059684603 39.166610484480174)
4th Street Arts Festival 4th Street from Lincoln to Indiana, Grant from Kirkwood to 3rd, Dunn from Kirkwood to 3rd September 3, 2021 08:00 am to 22:00 pm September 5, 2021
4th Street Arts Festival
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52984992918788 39.16461888860306,-86.52984130806155 39.164615546474096,-86.5298266346824 39.165564688534005,-86.52981113411944 39.166567322759164),LINESTRING(-86.52984992918788 39.164615546474096,-86.52982837637208 39.16556470471997,-86.52826794233901 39.165555742924795,-86.52691874624026 39.16554799429824),LINESTRING(-86.52981113411944 39.166567322759164,-86.52981975524575 39.16657734886738,-86.52983308411272 39.16556804995682,-86.52984561862472 39.16461888860306),LINESTRING(-86.52984130806155 39.16461220434496,-86.52983268693524 39.16461888860306),LINESTRING(-86.52691874624026 39.16555802055177,-86.52826795250878 39.1655546784674,-86.52825071025615 39.16654058646358,-86.52825933138247 39.16450525612902),LINESTRING(-86.53109137137756 39.16558141513772,-86.5310956819407 39.16558475722081),LINESTRING(-86.5310956819407 39.16558475722081,-86.5310956819407 39.16558475722081),LINESTRING(-86.52826364194564 39.16451194039729,-86.52824639969299 39.16556136263594,-86.53037150733003 39.165568046803855,-86.53102675000365 39.16558021507777,-86.53109137137756 39.16558141513772),LINESTRING(-86.53108275025124 39.16558141513772,-86.53102671293017 39.16558141513772,-86.53109137137756 39.16558475722081),LINESTRING(-86.5310870608144 39.16557807305449,-86.5310870608144 39.16557807305449,-86.52983268693532 39.165568046803855),LINESTRING(-86.52983268693532 39.165568046803855,-86.53108275025124 39.16558141513772))
South Olcott Blvd South Olcott Blvd from East Moores Pike to East Winston St September 7, 2021 to September 16, 2021
ADA Ramp replacement, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.48495889710372 39.150173299560834,-86.48482232894432 39.149718286949394,-86.48490831630394 39.149322109779774,-86.48489820014393 39.14905929795171,-86.48473128350467 39.14879648514221,-86.48441262446606 39.14854543915402,-86.48422547550688 39.14834538624109,-86.48413948814726 39.148110029144846,-86.48414454622724 39.147858980708094,-86.48417995278709 39.14773345615393,-86.48427099822669 39.14756478218169,-86.48450366990566 39.14736080381485,-86.48498418750356 39.14709013930005,-86.48542929854158 39.146878314171005,-86.48558609902088 39.14676063326834,-86.48570749294035 39.14655665257101,-86.48571255102033 39.145768183162886)
Berkley Ct Berkley Court South/Berkley Court North September 7, 2021 to September 9, 2021
Millin/Paving, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.51263594643605 39.14563891503329,-86.51271325451404 39.14494669466251)
Blue Ridge Neighborhood Association Block Party E Rusgan Drive September 7, 2021 16:00 pm to 21:00 pm monthly on the 30th until October 5, 2021
Blue Ridge Neighborhood Block Party
External Project
LINESTRING(-86.53136535121428 39.20144046719446,-86.53136535121428 39.20144046719446,-86.53204828029861 39.2011275214071)
Sweetbriar Sweetbriar Subdivision September 9, 2021 to September 23, 2021
Paving, weather permitting, 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.5255182064248 39.142058313385775,-86.52544525653272 39.14191013088322,-86.525420939902 39.14176194806873,-86.52542788751077 39.14158412827962,-86.5254973635985 39.14135781153476,-86.52589685110289 39.140549531506764,-86.52523335446517 39.14035284862945,-86.52524030207394 39.13996217553114,-86.52522988066079 39.14036362578764,-86.52483734076525 39.14116445911762,-86.52474007424243 39.141353056973514,-86.52469144098103 39.141765276242324,-86.52580305838453 39.14174641658991,-86.52601496045204 39.141692531840846,-86.52617128164943 39.141609010398355,-86.5263241290424 39.141450049959786,-86.52636234089064 39.141353056973514,-86.52637970991258 39.14120217872923),LINESTRING(-86.52637564267145 39.14119665923735,-86.52618110962584 39.14072246832728,-86.5259171004925 39.1405527287593))
W Kirkwood Avenue lane closure 9/16/2021 CBU repairing leak 900 Block of W Kirkwood Avenue (Waldron to Elm) September 16, 2021 09:30 am to 15:30 pm
Please be advised City Utility Crews have closed the Westbound Lane of the 900 Block of W Kirkwood Avenue all day to repair a leak. Flaggers are in place and directing traffic in both directions via the Eastbound Lane.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54528170367031 39.16665913028092,-86.54373319338285 39.16666050867221),LINESTRING(-86.54372963767611 39.16666050867221,-86.54372963767611 39.16666050867221))
N Walnut St N Walnut St at E 14th St September 20, 2021 to October 1, 2021
N Walnut St will be one lane at E 14th St to complete utility work in the area.
Planning & Transportation
LINESTRING(-86.53354443383776 39.17524006058568,-86.53352297616563 39.176487626807216)
E 14th St E 14th St just east of N Walnut St September 20, 2021 to October 1, 2021
E 14th St will be be one lane just east of N Walnut St for utility work in the area.
Planning & Transportation
LINESTRING(-86.53349245099639 39.17595519579555,-86.53276088822938 39.17595519579555)
Lotus World Music & Arts Festival 6th between college and lincoln. 3rd between college and lincoln. switchyard park September 23, 2021 19:00 pm to 17:30 pm September 26, 2021
Lotus World Music & Arts Festival
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53490798493165 39.16462319336915,-86.53492229562151 39.164634288941016,-86.53111565211947 39.16460100222017),LINESTRING(-86.53490798493165 39.16462319336915,-86.53483643148236 39.168573106355524),LINESTRING(-86.53486505286207 39.16860639119659,-86.53485074217222 39.16856201140499),LINESTRING(-86.53483643148236 39.168573106355524,-86.5310727200499 39.16853982149871),LINESTRING(-86.53108703073976 39.16853982149871,-86.53111565211947 39.16460100222017),LINESTRING(-86.53711733213999 39.14697554468762,-86.53711733213999 39.14697554468762,-86.53711733213999 39.146742569623285),LINESTRING(-86.53711733213999 39.14695890363717,-86.53641995779613 39.14695890363717),LINESTRING(-86.53641995779613 39.14695890363717,-86.5370851456318 39.14697554468762),LINESTRING(-86.53704223028757 39.14672592851775,-86.53640922896005 39.146717607963495),LINESTRING(-86.53641995779613 39.14695890363717,-86.53640922896005 39.146717607963495),LINESTRING(-86.53645214430429 39.146717607963495,-86.53644141546822 39.146717607963495,-86.53710660330393 39.14673424907102))
Sweetbriar Sweetbriar Circle, Sweetbriar Drive and Sweetbriar Court September 23, 2021 to September 27, 2021
Resurfacing 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.5254245873364 39.14175153396903,-86.52586604543113 39.14173631667879,-86.52610639483825 39.14166023017799,-86.52624373735661 39.14152327426936,-86.52635655442528 39.14138251375232,-86.5263859849649 39.14115805721045,-86.52622411699686 39.14078903388278,-86.52610639483825 39.14065207627931,-86.5258513301613 39.140526531575375,-86.52523328882869 39.14035152949333,-86.52473296965466 39.1413520790089,-86.5246888238452 39.141759142612955,-86.5254245873364 39.14175153396903,-86.52545401787606 39.14145860055322,-86.5255913603944 39.14118088333214,-86.52572379782282 39.140906969383394,-86.52584642507135 39.140678706945295,-86.52589547597078 39.14055696667566)
South Olcott South Olcott between East Moores Pike to East Brigs Bend September 23, 2021
ADA ramp replacement, weather permitting from 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.4849680451391 39.15017259875037,-86.4848637452316 39.14986523912273,-86.48480811861427 39.14964954735444,-86.48489851186744 39.14935836241867,-86.48489851186744 39.14905639158317),LINESTRING(-86.48487069855877 39.149034822188185,-86.48473163201544 39.14876520419327,-86.48437701232996 39.14851715472568,-86.48415450586062 39.148193610628056,-86.48412669255194 39.147897027232005,-86.48424489911378 39.14757887274496,-86.48465514541661 39.14726071681977,-86.4854339180591 39.14688863433699,-86.48569814449142 39.14660283051455,-86.48563556454693 39.14338341295823))
Hoosiers Outrun Cancer 5K Run/Walk N. Fess to 17th September 25, 2021 09:00 am to 12:00 pm
Hoosiers Outrun Cancer 5KRun/Walk
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.51897410869393 39.17904717299686,-86.51894481613098 39.17905852643548),LINESTRING(-86.51895946241248 39.17904717299686,-86.51895946241248 39.17905852643548),LINESTRING(-86.51895946241248 39.179069879872316,-86.51898875497544 39.17905852643548),LINESTRING(-86.51895946241248 39.179069879872316,-86.51895946241248 39.179069879872316),LINESTRING(-86.51897410869395 39.17904717299686,-86.51894481613101 39.179069879872316),LINESTRING(-86.5189008772868 39.17399471086253,-86.51547364742181 39.17340428710142),LINESTRING(-86.5130716572603 39.17625417139058,-86.51456557797056 39.17475544186115,-86.51499032013326 39.17425585825228,-86.51509284410358 39.17406283636191,-86.51537112345156 39.17363137374983,-86.51548829370336 39.17342699579899),LINESTRING(-86.51245651343832 39.17885416425966,-86.51238328203108 39.17758256403948,-86.51276408534937 39.17657207960812,-86.51456557797056 39.17475544186115,-86.51492994887546 39.17420933365574,-86.51537112345156 39.17363137374983,-86.51544435485886 39.173438350145204,-86.51509284410358 39.17406283636191,-86.51440446887433 39.17493710774795,-86.5130716572603 39.17625417139058),LINESTRING(-86.51247115971994 39.178854164259576,-86.51600091355492 39.178910931590224,-86.51895946241248 39.17904717299686),LINESTRING(-86.51895946241248 39.17905852643548,-86.51600091355492 39.178910931590224),LINESTRING(-86.51251509856436 39.178854164259576,-86.51251509856436 39.178854164259576,-86.51248580600142 39.17884281078793,-86.51891552356805 39.17905852643548),LINESTRING(-86.51248580600142 39.17884281078793,-86.51248580600142 39.17884281078793),LINESTRING(-86.52364627248404 39.17522095975664,-86.51904734010152 39.17513012723862),LINESTRING(-86.52349980966935 39.172552705637315,-86.52349980966935 39.172552705637315,-86.52361697992113 39.17522095975664),LINESTRING(-86.52361697992113 39.17520960569834,-86.52361697992113 39.17520960569834),LINESTRING(-86.5189008772868 39.17399471086253,-86.51901804753861 39.17513012723862,-86.52358768735816 39.17522095975664),LINESTRING(-86.5283300368748 39.17906261920413,-86.52831841211349 39.179035585512054,-86.52835328639742 39.18473045373298,-86.52834166163616 39.186217170912784),LINESTRING(-86.52834166163616 39.17904459674389,-86.52834166163616 39.17904459674389),LINESTRING(-86.52829516259094 39.18625321215097,-86.52829516259094 39.18625321215097),LINESTRING(-86.5282486635457 39.18632529457193,-86.52829516259094 39.18625321215097),LINESTRING(-86.5283067873522 39.17904459674389,-86.52602372181093 39.1790306340973,-86.52707344048058 39.17902058335096,-86.5283300368748 39.179008551809574),LINESTRING(-86.52704420978559 39.179069879872316,-86.5269416858155 39.17254135114814,-86.52697097837844 39.17163298607284),LINESTRING(-86.52695633209699 39.17257541461021,-86.52349980966935 39.17254135114814),POINT(-86.52695633209699 39.17257541461021))
Elm Street Closed between W 7th and W 8th Elm Street between W 7th and W 8th September 25, 2021 09:00 am to 20:00 pm
Elm Street between W 7th and W 8th closed for mural touch up. Sidewalks will remain open. Signage to be in place.
Parks & Recreation
LINESTRING(-86.54523766557988 39.16954850362856,-86.54526321202836 39.168667146326555)
South Pickwick Place/ East Pickwick Place South Pickwick Place/ East Pickwick Place from Winfield Rd to E Covenanter Dr September 27, 2021 to October 7, 2021
Milling/ Resurfacing, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.50460640013095 39.155005399838075,-86.50498498001181 39.15348293537849,-86.50519628041044 39.152711449781435,-86.50510823857768 39.15210381357815,-86.50501139256164 39.15198774763914,-86.50297762622486 39.151898991203694,-86.50103190172085 39.15189216378093)
South Olcott Blvd South Olcott Blvd from East Winston to South Daniel St September 27, 2021 to October 7, 2021
ADA replacement
Street
LINESTRING(-86.48570442840597 39.145753987546925,-86.48570092752215 39.1443149781193,-86.48562390807571 39.14337553345172,-86.48561690630785 39.142892230443806,-86.48566591868286 39.14271845776477,-86.48594598939704 39.14226773287939,-86.48598099823633 39.14218627626687,-86.48599500177203 39.14204779980929,-86.48592148320955 39.14183058128788,-86.48591098055776 39.141640514531815,-86.48598800000411 39.14145587776315,-86.48608952563804 39.14131739986885,-86.48683521391476 39.140825936907845,-86.48710128109326 39.14058427706652,-86.48735334473609 39.1403263246352,-86.48759490572714 39.14010638549988,-86.48788897997711 39.139970620258566,-86.48812704008422 39.139938036561716)
Elm Street Closed between W 7th and W 8th Elm Street between W 7th and W 8th September 30, 2021 09:00 am to 20:00 pm
Elm Street between W 7th and W 8th closed for mural touch up. Sidewalks will remain open. Signage to be in place.
Parks & Recreation
LINESTRING(-86.54524157085345 39.169534446913275,-86.54526897997864 39.1686844514266)
Fall Pop Market Madison Street Between 6th and 7th Streets October 2, 2021 13:00 pm to 21:00 pm
Fall Pop Market hosted by local businesses.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53735886661978 39.16854776622583,-86.53735886661978 39.16854776622583,-86.53738854844408 39.16854881222861,-86.53741810812096 39.168549853926805),LINESTRING(-86.53739925855241 39.16776174241187,-86.53740060495018 39.16760477008788),LINESTRING(-86.53740274222338 39.167608084151,-86.53740274222338 39.167608084151,-86.53737709494486 39.16760477008788,-86.53739852086701 39.16760556111427,-86.53742197768227 39.16760642711944),LINESTRING(-86.53742197768227 39.16760642711944,-86.53740701676979 39.16760642711944),LINESTRING(-86.53740274222338 39.16760642711944,-86.53740274222338 39.16760642711944),LINESTRING(-86.53739846767695 39.16760642711944,-86.53738778131091 39.168550928760766))
South Olcott Blvd South Olcott Blvd from East Moores Pike to East Winston Place October 4, 2021 to October 28, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.48495560430314 39.15016706280082,-86.48490726159935 39.14997336692886,-86.48483071898501 39.149767173963255,-86.48483474754367 39.14962346335727,-86.48490726159935 39.149298551340195,-86.48489114736473 39.149061114686816,-86.4847420906947 39.1488049321361,-86.48446814870654 39.148598735747214,-86.48429492068462 39.14843627756082,-86.48418212104244 39.148276943206014,-86.4841378068973 39.148017633582924,-86.4841458640146 39.14789578897228,-86.48418212104244 39.14770521108133,-86.48443994879601 39.14740528417505,-86.48543097422395 39.146880409013704,-86.48560017368722 39.146736692513116,-86.48569283053617 39.146586727156176,-86.4857049162121 39.145786906522716)
HarvestHootenanny W. 9th Between N. College and N. Walnut. October 9, 2021 16:00 pm to 01:00 am October 10, 2021
Special Event: Switchyard Park Harvest Hootenanny
Public Works
GEOMETRYCOLLECTION(POINT(-86.53421882690508 39.17048266724356),LINESTRING(-86.5341901022465 39.17048266724356,-86.5341901022465 39.17048266724356,-86.53421882690508 39.17048266724356,-86.5341765847601 39.17048135728086),LINESTRING(-86.53421768001391 39.16992241574329,-86.53424181989503 39.16992241574329),LINESTRING(-86.53361686519459 39.1704651508104,-86.53481581262423 39.170471389120166))
Tamarron HOA Block Party Tamarron Neighborhood October 9, 2021 16:00 pm to 22:30 pm
Tamarron HOA Block Party
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.4854991970757 39.17459741827517,-86.48550053818019 39.17459741827517,-86.4853999553422 39.174830301111996,-86.48520683629302 39.17506942107937,-86.4853999553422 39.174830301111996,-86.48550322038928 39.174598457932404),LINESTRING(-86.4853999553422 39.174830301111996,-86.4853999553422 39.174830301111996))
North Martha Street North Martha Street October 12, 2021 to October 13, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.53161440756543 39.18645534465071,-86.53159897139025 39.18727291302906,-86.5316710068744 39.187444401775,-86.53195914881103 39.18773553287386,-86.53209807438763 39.187787378011535,-86.53291104628025 39.187783389925386)
East 3rd Street East 3rd between South Mitchell Street and South Swain Ave October 12, 2021 to October 14, 2021
Installation of delineators, weather permitting, 6:00 am to 4:00 pm. Signage will be in place.
Street
LINESTRING(-86.51418635714666 39.16426459836424,-86.51526121532487 39.16426459836424)
South Olcott Blvd South Olcott Blvd/ South Kings Ct & South Olcott Blvd/ South Daniel St October 12, 2021 to October 20, 2021
ADA Ramp and sidewalk replacement
Street
GEOMETRYCOLLECTION(LINESTRING(-86.48703187660223 39.14066249199172,-86.48702868292777 39.140679831056275),LINESTRING(-86.48704145762566 39.140721940195334,-86.4869999398575 39.14068973909127,-86.48696480943826 39.14071946318785,-86.4870254892533 39.14066744601058),LINESTRING(-86.48818798676218 39.13993672445835,-86.48808259550451 39.13994167852832,-86.4881336942961 39.13993424742327,-86.48813050062162 39.13985993632946))
IU Homecoming Parade Woodlawn to 17th, E. 13th to Fee, N. Fee to 17th, finish at Assemly Hall October 15, 2021 16:30 pm to 20:30 pm
IU Homecoming Parade
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.51901745551235 39.175122563245765,-86.51879839113559 39.177139180452826,-86.51885315722978 39.178030719095744,-86.51895665866212 39.179073739598465),LINESTRING(-86.51883946570624 39.178030719095744,-86.51895665866212 39.1790603676387),LINESTRING(-86.51885315722978 39.178030719095744,-86.51885315722978 39.17814746736656),LINESTRING(-86.51883946570624 39.17809439999476,-86.51883946570624 39.17809439999476),POINT(-86.51637499146757 39.178922246433416),LINESTRING(-86.51895665866212 39.1790603676387,-86.51895665866212 39.179073739598465),POINT(-86.51890792332397 39.17340308605105),POINT(-86.5235630413303 39.1743159001681),POINT(-86.52105749252101 39.175048265717635),LINESTRING(-86.52363149894805 39.17518624677885,-86.52363149894805 39.17518624677885,-86.5190037639888 39.175111949317994),POINT(-86.52591798338055 39.17899653986791),POINT(-86.52590429185702 39.175228702435504),POINT(-86.52590429185702 39.1760671964017),POINT(-86.52368626504223 39.17903899322383),LINESTRING(-86.52354934980676 39.17901776654904,-86.52354934980676 39.17901776654904,-86.52363149894805 39.17758495118744,-86.52360411590095 39.17518624677885),LINESTRING(-86.52360411590095 39.17518624677885,-86.52365888199513 39.177531883391026),LINESTRING(-86.5236178074245 39.175239316345625,-86.52360411590095 39.17518624677885),LINESTRING(-86.52357972263998 39.1790603676387,-86.52358180711549 39.17752098319269,-86.52360411590095 39.17518624677885),LINESTRING(-86.51902565961701 39.1790603676387,-86.52357972263998 39.179046995676345))
N Elm Street Closed between W 7th and W 8th Streets N Elm Street Closed between W 7th and W 8th Streets October 16, 2021
N Elm Street Closed between W 7th and W 8th Streets for painting
Parks & Recreation
LINESTRING(-86.54527424327324 39.16867702533156,-86.54525023823031 39.169572034461254)
Eastgate Lane Eastgate Lane from bypass to dead end October 18, 2021 to October 20, 2021
Road Repair
Street
LINESTRING(-86.50132769944508 39.170160978078144,-86.50126191555096 39.17014154930888,-86.5010958895325 39.16986711736948,-86.50064479997286 39.16911910275209,-86.50035347129892 39.169036529222325)
N Walnut St N Walnut St from E Kirkwood Ave to E 6th St October 18, 2021 07:00 am to 11:00 am daily until October 22, 2021
The right lane of N Walnut St will have temporary, intermittent lane closures for materials unloading. The adjacent sidewalk will also be closed for short periods of time.
Planning & Transportation
LINESTRING(-86.53360599082411 39.1675285967892,-86.53359880450571 39.167035511026285)
East Daniel Street East Daniel Street From South Forrester St to E Brookstone Court October 20, 2021 to October 25, 2021
ADA ramp replacement
Street
LINESTRING(-86.48846502807864 39.138692358189985,-86.48890060402981 39.13837190480206,-86.48996071902862 39.13791482147681,-86.49052440555367 39.13768627870141,-86.49105286167088 39.13757945954109,-86.49147882932914 39.137562070360076,-86.49171903665514 39.13757449120408,-86.49226030382975 39.13759684871772,-86.49261901343661 39.13760926955561,-86.49324675524859 39.137567038697966,-86.49336525752942 39.137547165344415,-86.4934453266381 39.13755461785266)
CBU closed N Morton St North Morton Street between West 10th & West 11th Street October 20, 2021 08:00 am to 15:00 pm
Please be advised City Utility Crews have closed North Morton Street between West 10th & West 11th Street beginning immediately at 8:15 am and will remain closed all day until approximately 2:30 pm. If you have any questions please don't hesitate to call. Thank you.
Utilities
LINESTRING(-86.53609530101679 39.173225908676386,-86.53609205330672 39.17171276846642)
E Hillside Closure E Hillside between the alley east of S Lincoln and S Grant October 23, 2021 06:00 am to 22:00 pm
Snedegar Construction will closing E Hillside between the alley east of S Lincoln St and S Grant St for a sewer repair on Saturday, 10/23 between the hours of 6am and 10pm. Traffic will be detoured down both Grimes and Miller
Planning & Transportation
LINESTRING(-86.53035319742573 39.150506685143796,-86.53081480518547 39.150506685143796)
E Hillside Drive Lane Restrictions E Hillside between the alley east of S Lincoln and S Grant October 25, 2021 09:00 am to 15:00 pm daily until October 26, 2021
Snedegar Construction will have alternating (both EB and WB) lane closures between the alley east of S Lincoln St and S Grant St for a sewer repair on Monday 10/25 and Tuesday 10/26 between the hours of 9am and 3pm. Flaggers will be present to control the flow of both EB and WB traffic.
Planning & Transportation
LINESTRING(-86.530818561453 39.1505196839168,-86.530357379057 39.1505196839168)
800 block of W 6th Street 800 Block of W 6th Street between N Waldron St and N Maple St October 26, 2021 to October 27, 2021
Tree/stump removal
Street
LINESTRING(-86.54372697562314 39.16763083220775,-86.54217969611925 39.167627595855095)
Lane Closure on N Walnut 1800 North Walnut October 28, 2021 to December 1, 2021
CenterPoint Energy (through Miller Pipeline) will be closing the eastern most lane at approximately 1800 N Walnut daily to perform natural gas work. It is anticipated that the lane will open each afternoon after work has been completed, and remain open on weekends. Wright Traffic Control will be setting up all signage, barricades, and an arrowboard.
Planning & Transportation
LINESTRING(-86.533988814937 39.18303537795694,-86.53368425852737 39.18157600677213)
Lane Restriction - Fire Hydrant Installation 500 Block of N Woodlawn between 9th St. and 10th St. November 2, 2021
Please be advised that CBU crews have closed one lane on the 500 block of N. Woodlawn between 9th St. and 10th St. for a fire hydrant installation. Normal traffic flow is expected to resume at 4:00pm. We will be flagging.
Utilities
LINESTRING(-86.52348407756588 39.17164507226471,-86.52346368335724 39.17043215090328)
CBU Water Main Break Patterson/Grimes W Patterson/W Grimes between S Rogers St and S Walnut St November 5, 2021
Please be advised that CBU crews have closed W Patterson/W Grimes between S Rogers St and S Walnut St due to a water main break. Normal traffic flow is expected to resume by tomorrow.
Utilities
LINESTRING(-86.53864248086047 39.15381173465414,-86.53787022962386 39.153744123020005,-86.53707306687309 39.15345435823281,-86.5362260822344 39.15334811122099,-86.53480613676167 39.153338452072205,-86.53371003812192 39.153338452072205)
IUSF Little 500 Street Sprints E 7th November 6, 2021 09:00 am to 19:00 pm
Indiana University Student Foundation Street Sprints
Public Works
GEOMETRYCOLLECTION(POINT(-86.51935288613069 39.16845302641363),POINT(-86.52074795555696 39.16850294578097),POINT(-86.52116647638483 39.16841974681577),POINT(-86.51935288613069 39.168461346310636),LINESTRING(-86.52222887540944 39.16847798610172,-86.51935288613069 39.168461346310636),LINESTRING(-86.51936361743397 39.168461346310636,-86.51935288613069 39.168461346310636),LINESTRING(-86.51934215482741 39.168461346310636,-86.51935288613069 39.16845302641363))
Road Closed on N Elm Street between 7th and 8th Street N Elm Street between 7th and 8th Street November 6, 2021 09:00 am to 12:00 pm
Road Closed on N Elm Street between 7th and 8th Street
Parks & Recreation
LINESTRING(-86.54524656883277 39.169551165341005,-86.54526846131287 39.168661299652115)
Landscape maintenance on the West 3rd Street medians from Patterson Drive to Yancy Lane. West 3rd Street from Patterson Drive to Yancy Lane. November 8, 2021 07:30 am to 15:30 pm November 10, 2021
Landscape maintenance on the West 3rd Street medians from Patterson Drive to Yancy Lane. Lane closures from 7:30 am to 3:30 pm Monday 11/8 to Wednesday 11/10. One lane in the eastbound street and one lane in the westbound street adjacent to the medians will be temporarily closed to provide a safety zone for Parks staff.
Parks & Recreation
LINESTRING(-86.55316810609916 39.16435202658778,-86.57179336549859 39.16460158023588)
N Headley Rd N Headley Rd/N Hinkle Rd from E Maplecrest Dr to E Gramercy Park Dr November 15, 2021 to July 6, 2022
The southbound lane of N Hinkle Rd/ N Headley Rd will be closed for the construction of improvements to the Lake Griffy causeway.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.51174219411425 39.19061370527572,-86.51183395760373 39.192427270196475,-86.51229277505114 39.19306734075863,-86.51229277505114 39.19370740549047,-86.5121551298169 39.19427634702424,-86.51311864645642 39.19672985461864,-86.51334805518013 39.19886326984221,-86.5142656900749 39.20039217756835),LINESTRING(-86.51431157181965 39.2006055108848,-86.51343981866961 39.20035662195261,-86.51022809653789 39.20177883254502),LINESTRING(-86.50999868781419 39.20213438069416,-86.50981516083526 39.203521001280876,-86.50825518151413 39.20440984623457))
Road Closure for Crane Placement on W 6th West 6th St between N Morton and N College November 18, 2021
Road closure on W 6th St between N Morton and N College Ave. Road will be closed for approximately 12-15 hours.
Planning & Transportation
LINESTRING(-86.53611477507312 39.167591527771805,-86.53487644201549 39.16757404905047)
ALL WAY STOP E Atwater Ave/ S Jordan Ave November 18, 2021 to December 2, 2021
Signal in All Way Stop until further notice due to accident
Street
LINESTRING(-86.51639730479823 39.16315125642424,-86.51638311353449 39.16294494597557,-86.5163937569823 39.16306047990139,-86.51656050433134 39.16306047990139,-86.51621636618546 39.16306047990139)
Downtown Holiday Lighting Ceremony: Kirkwood Closed between N. College and S. Walnut Kirkwood Closed between N. College and S. Walnut November 26, 2021 15:00 pm to 20:00 pm
Kirkwood Closed between N. College and S. Walnut
External Project
LINESTRING(-86.53482819242878 39.16659111399508,-86.5336288328401 39.16658588995588)
N Morton Closed for Holiday Market N Morton at 8th Street November 27, 2021 06:00 am to 18:00 pm
Holiday Market road closure on N Morton Street, North of 8th Street and South at Showers Parking Lot
Parks & Recreation
LINESTRING(-86.53613091015114 39.16958128911554,-86.53614052972829 39.169021947011714)
Westbound lane restriction on W 1st Street between Wylie and Walker, flaggers present Westbound lane restriction on W 1st Street between Wylie and Walker, flaggers present November 29, 2021 09:00 am to 18:00 pm December 4, 2021 daily until December 4, 2021
Westbound lane restriction on W 1st Street between Wylie and Walker, flaggers present
Planning & Transportation
LINESTRING(-86.54351671493305 39.15946458063033,-86.54482417966786 39.15946924176566)
N Dunn St N Dunn St from SR 45/46 Bypass to N Old SR 37 December 2, 2021 to December 4, 2021
N Dunn St will be closed for utility work. A detour route will be in place.
Planning & Transportation
LINESTRING(-86.52822293115224 39.18658664009155,-86.52856625390615 39.203149840446684,-86.52908123803701 39.204812596682245,-86.52848042321767 39.20561070569434,-86.52882374597156 39.20773895205673)
Westbound lane restriction on W 1st Street between Wylie and Walker, flaggers present Westbound lane restriction on W 1st Street between Wylie and Walker, flaggers present December 6, 2021 to December 8, 2021
Westbound lane restriction on W 1st Street between Wylie and Walker, flaggers present
Planning & Transportation
LINESTRING(-86.54349776140894 39.15947497410849,-86.54476023265744 39.15948054664673)
S Walnut St S Walnut St from E 3rd St to E 4th St December 8, 2021 to December 23, 2021
The left lane will be closed for work on the 4th Street Parking Garage. Two through lanes will remain.
Planning & Transportation
LINESTRING(-86.53366169519849 39.16468005821716,-86.53365368802065 39.16558645495837)
South Jordan Ave S Jordan Ave between E 3rd and E Atwater December 9, 2021 to December 10, 2021
Repair Signal
Street
LINESTRING(-86.5166880077027 39.16305827011524,-86.51609807275662 39.16305224813752,-86.51638532979779 39.16305224813752,-86.5164008633329 39.16422590880103)
E Atwater Ave East Atwater Ave from South Faculty Ln to South Jordan December 9, 2021 to December 10, 2021
Signal Repair
Street
LINESTRING(-86.52107744382214 39.16310047225949,-86.51626054331115 39.16306743104127)
N Adams St N Adams St from W 7th St to W Fountain Dr December 13, 2021 to December 17, 2021
N Adams St will be fully closed for repairs on the railroad overpass.
Planning & Transportation
LINESTRING(-86.54963768792743 39.168744041458865,-86.54963768792743 39.1697588240707)
Night Work and S Strong Drive Lane Restriction S Strong Drive Lane Restriction for Street Cut (Night Work 7 AM - 7 PM for 2 nights on 12/15 and 12/16) December 15, 2021 19:00 pm to 07:00 am December 17, 2021
S Strong Drive Lane Restriction for Street Cut (Night Work 7 AM - 7 PM for 2 nights)
Planning & Transportation
LINESTRING(-86.54414934864249 39.15478665313498,-86.54396810061537 39.153797191686266,-86.54424359761659 39.15342051804649,-86.54509908830457 39.153049464429955,-86.54538908514797 39.15248725825262,-86.54538908514797 39.151936291841054)
Road Closure for Crane Placement on W 6th West 6th St between N Morton and N College December 16, 2021
Road closure on W 6th St between N Morton and N College Ave. Road will be closed for approximately 12-15 hours.
Planning & Transportation
LINESTRING(-86.53608153755968 39.167581396102804,-86.53488239855322 39.167581396102804)
S Nancy St Road Closure S Nancy St between E Hillside and E Viva December 21, 2021 to December 22, 2021
Snedegar Construction will be closing S Nancy St from E Hillside Dr to E Viva Dr for a sewer repair at app 1401 S Nancy Dr. Local traffic will remain open. Plates will be used overnight
Planning & Transportation
LINESTRING(-86.5110759400307 39.15252945996238,-86.5110894436615 39.15064454099064)
N Pete Ellis Dr N Pete Ellis Dr from E Longview Ave to E 10th St December 27, 2021 to January 14, 2022
There will be a full street closure for storm sewer work. A detour route will be posted.
Planning & Transportation
LINESTRING(-86.49489507917538 39.16702220467607,-86.4949165368475 39.16826991669524)
graduate 100 S. Lincoln January 1, 2022 to January 2, 2022
meters 107A&B
Controller
GEOMETRYCOLLECTION(LINESTRING(-86.53093517881287 39.16564486160436,-86.53096951318375 39.16595097489497),LINESTRING(-86.53093517881287 39.16567148031464,-86.53093517881287 39.16567148031464))
High & Hillside closed for water main break High & Hillside January 9, 2022
Due to emergency repair on broken water main, the intersection of S High St and E Hillside Dr/E Moores Pike will be closed from 2pm Sunday until the repair is complete.
Utilities
LINESTRING(-86.50842863213369 39.15249189718281,-86.50840610722831 39.15046571741354,-86.50935212438395 39.150483184464434,-86.50718979945677 39.15046571741354)
Freeze Fest / Maker Way Closed Maker Way between N Rogers Street and N Madison Street January 17, 2022 to January 23, 2022
Maker Way closed between N Rogers Street and N Madison Street for Freeze Fest
Parks & Recreation
LINESTRING(-86.53853706495691 39.172261851654696,-86.53737548625985 39.17225775878239)
Emergency Road Closure - Water Main Break E Hunter Ave & S Highland Ave January 18, 2022 12:00 pm to 16:00 pm
Please be advised City Utilities will be closing the intersection of E Hunter Avenue & S Highland Avenue today, 1/18, beginning at Noon for approximately 4 hours to repair a water main break.
Utilities
POINT(-86.51771439865527 39.16220000615451)
Road Closure for Crane Placement on W 6th Road closure on W 6th St between N Morton and N College Ave. Road will be closed for approximately 12-15 hours. January 19, 2022
Road closure on W 6th St between N Morton and N College Ave to accommodate a crane. Road will be closed for approximately 12-15 hours.
Planning & Transportation
LINESTRING(-86.53607785371827 39.167573138026,-86.53488572784376 39.167573138026)
Road Closure - 700 Block of N Washington Ave. The 700 block of N Washington Ave. between E Cottage Grove Ave and E 11th St. January 19, 2022
Please be advised that CBU crews have closed the 700 block of N Washington Ave. between E Cottage Grove Ave. and E 11th St. for scheduled repairs. Work will begin at 7:00 am and normal traffic flow is expected to resume by 4:00 pm. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.5323305979868 39.173489851873484,-86.53234288810117 39.17253707047783),LINESTRING(-86.53234903315834 39.17254183441693,-86.53233674304398 39.17252754259866))
Freeze Fest / N Madison Street closed between W 10th and W 11th N Madison Street closed between W 10th and W 11th January 20, 2022 to January 23, 2022
Freeze Fest / N Madison Street closed between W 10th and W 11th
Parks & Recreation
LINESTRING(-86.53731321737716 39.17319279956007,-86.5372884389303 39.171325636121196)
E Longview Ave E 7th St to N Pete Ellis Dr January 24, 2022 to February 5, 2022
The street will be closed for utility work.
Planning & Transportation
LINESTRING(-86.49648703408803 39.166930704923686,-86.49498499703968 39.16696397757471)
Road closure (West 12th Street) West 12th Street between North Lindbergh Drive and North Monroe Street. January 24, 2022 to March 7, 2022
Please be advised that CBU crews will be closing sections of West 12th Street between North Lindbergh Drive and North Monroe Street intermittently due to water main replacement. Normal traffic flow is expected to resume by March 7. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.55252374482752 39.17423042542441,-86.54714859796168 39.17417220429081),LINESTRING(-86.54713786912562 39.174163886982086,-86.54714859796168 39.174163886982086))
South Cedarwood Circle Bloomington, IN S Cedarwood Circle January 25, 2022 09:00 am to 13:00 pm
CBU to close both lanes of the 3400 block of S Cedarwood Circle to intersection at S Claybridge Drive for approx. 4 hours (9am to 1pm) on Tuesday, Jan. 25th to repair a leaking water service line. Contact Utilities at 812-339-1444 with questions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.50495073123297 39.13013350949086,-86.50495073123297 39.13013350949086),LINESTRING(-86.5049554838616 39.130137196174275,-86.5049554838616 39.130137196174275),LINESTRING(-86.50644780926018 39.129941801688915,-86.50644780926018 39.12993442830151),LINESTRING(-86.5056208518737 39.12986806778002,-86.50644780926018 39.12992705491331),LINESTRING(-86.5056208518737 39.12986806778002,-86.50644305663153 39.129930741607495),LINESTRING(-86.5056208518737 39.12987175447728,-86.50495073123273 39.130118762755444))
Water Main Break- N Lincoln St closed N Lincoln St between E 17th St and E 16th St January 27, 2022 09:00 am to 17:00 pm
Please be advised that CBU crews have closed the 1200 block of N Lincoln with the nearest cross street being 17th St, due to a Main Break in that area. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53095545259791 39.17895486102745,-86.53093945454397 39.178595221919466),LINESTRING(-86.53096554890129 39.178565568895124,-86.53096554890129 39.17779596701138))
CBU Closed W. 15th 1304 W 15th January 27, 2022 to January 28, 2022
Please be advised City Utilities has Closed the road in front of 1304 West 15th Street beginning now, 2:30pm Thursday, January 27th. It will remain closed overnight until Friday, January 28th.
Utilities
POINT(-86.55107542765472 39.17665905597019)
S Lincoln St E 2nd St to E Smith Ave January 31, 2022 09:00 am to 15:00 pm daily until February 3, 2022
S Lincoln St will be closure daily between 9am and 3pm for sewer repairs.
Planning & Transportation
LINESTRING(-86.53120554757669 39.161440501941854,-86.53120554757669 39.162721587632404)
3400 Block S Cedarwood Circle February 7, 2022 to February 8, 2022 daily once
City Utilities is closing both lanes of the 3400 block of S Cedarwood Circle at S Claybridge Drive for approx. 4 hours to repair a water service line.
Utilities
Road Closure on S Huntington Drive S Huntington Drive from E Hillside to E Thorton February 10, 2022 09:00 am to 13:00 pm
CenterPoint Energy will be closing S Huntington Dr from E Hillside to E Thorton for approximately 4 hours to perform gas work. Sidewalks shall remain open and barricades will be in place. Local access to properties will be maintained.
Planning & Transportation
LINESTRING(-86.52076629667727 39.150476185364965,-86.52076629667727 39.149328364281075)
CBU Lane Closure N Dunn Street between E 19th Street & E 20th Street February 16, 2022
Please be advised City Utilities will be closing 1 lane of N Dunn Street between E 19th Street & E 20th Street allowing for 1 lane of traffic flow on Wednesday, February 16th between 9 am - 2 pm for water main maintenance.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52839238442479 39.18175216625528,-86.52839238442479 39.18175216625528),LINESTRING(-86.52835937370916 39.18102290117744,-86.52837587906699 39.18179054841826))
E Atwater Ave At S Woodlawn Ave February 16, 2022 09:00 am to 15:00 pm daily until February 18, 2022
The eastbound right lane will be closed daily for utility work.
Planning & Transportation
LINESTRING(-86.52319825959816 39.16310768949418,-86.52221120668067 39.16309105225852)
900 block of West Cottage Grove Ave. closed between North Diamond Street and West 10th Street February 19, 2022 to February 20, 2022
900 block of West Cottage Grove Avenue
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54484473819478 39.17259189796715,-86.54485546703087 39.17262516793994,-86.54421173686734 39.172641802920424),LINESTRING(-86.54421173686734 39.172641802920424,-86.54420100803128 39.17263348543065))
17th Street, Shoulder work Westbound 17th Street from Wills Drive to Dunn Street. February 27, 2022 to March 8, 2022
Lane restrictions on westbound 17th Street as construction crews perform work on the norther right-of-way of 17th Street.
Planning & Transportation
LINESTRING(-86.54128357614347 39.17907590465572,-86.53100932506565 39.17906314128092)
S College Ave W 4th St to W Kirkwood Ave February 28, 2022 09:00 am to 15:00 pm daily until March 2, 2022
The southbound left lane will be closed for utility repairs.
Planning & Transportation
LINESTRING(-86.53485335183707 39.1656589240211,-86.53481043649283 39.1664741141806)
Tapp & Deborah Signal Installation The intersection of West Tapp Road and South Deborah Drive February 28, 2022 to July 1, 2022
Lane restrictions will be in place for the construction of a new traffic signal at the intersection of West Tapp Road and South Deborah Drive.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.56816662571836 39.13664684166346,-86.56755599776871 39.13662624908605),LINESTRING(-86.56786573658376 39.13679098953668,-86.56787458626418 39.13647523666771))
S Rogers Street S Rogers Street between Charlie Street and S Old State Rd 37 March 7, 2022
Manhole overflowing.
Utilities
LINESTRING(-86.53931145238212 39.10184530831208,-86.5378970093537 39.099279146298215)
Lane Closures East 8th Street and N Overhill Drive March 8, 2022 to March 10, 2022
Lane Closures for water main maintenance
Utilities
GEOMETRYCOLLECTION(POINT(-86.50115364102716 39.16807165310939),POINT(-86.50102221278541 39.16826920603958),POINT(-86.50102221278541 39.16826920603958),POINT(-86.50102221278541 39.16826920603958),POINT(-86.50102221278541 39.16826920603958),POINT(-86.50372440381587 39.16950382895857),POINT(-86.50280174578783 39.16922630632149),POINT(-86.50213119353411 39.1689975638856),POINT(-86.50144063739175 39.16776596485016),POINT(-86.50143918360834 39.16852444299698))
CBU Road Closing West 7th Street from North College Avenue to North Morton Street . March 9, 2022
City of Bloomington Utility crews will be closing West 7th Street from North College Avenue to North Morton Street on Wednesday, March 9th beginning at 8 am through 2 pm. Street parking will be unavailable during these hours as well.
Utilities
LINESTRING(-86.53613966453203 39.16857312628596,-86.534858063897 39.168567636708445)
Flagging for lane restriction on N Kinser Pike 8:30 AM - 3 PM on 3/14-3/16 N Kinser Pike and W Gourley Pike March 14, 2022 08:30 am to 15:00 pm daily for 3 times
Flagging operation in the northbound lane with signage; work to remove and replace bus pad.
Planning & Transportation
LINESTRING(-86.53765962120876 39.18471645769711,-86.53765312011998 39.18504400200317)
E 3rd ST S Lincoln St to S Grant St March 15, 2022 08:00 am to 16:00 pm daily until March 18, 2022
The southernmost eastbound lane will be closed for daytime curb work.
Planning & Transportation
LINESTRING(-86.53100629776397 39.164618217114224,-86.52989049881376 39.1645849433535)
W 15th W 15th between N Maple St and N Fairview St. March 16, 2022 to March 18, 2022
Closed for tree/stump removal
Street
LINESTRING(-86.54207896958353 39.1766193551494,-86.54103299933848 39.176623962186625)
Planned Traffic Signal Outage East Atwater and S Eagleson (formally Jordan) intersection March 17, 2022 08:00 am to 17:00 pm
Duke Energy will be performing a pole replacement which will require the deactivation of the traffic signal at the intersection of E Atwater Ave and S Eagleson (formally Jordan) Avenue. The signalized intersection will be converted to a four-way stop for the duration of the outage. This work is anticipated to take approximately 8 hours. Inclement weather date is set for 3/18/2022
Planning & Transportation
LINESTRING(-86.51637483943362 39.16321976314407,-86.51636930658485 39.16288944048546,-86.51636930658485 39.163061036865344,-86.51655742344329 39.16306532676947,-86.51620885397028 39.163061036865344)
North Lincoln St North Lincoln St between E 15th St and E 16th St March 21, 2022 to March 23, 2022
Tree and Stump removal from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.53096500648813 39.17775931476922,-86.530984439153 39.1768554687815)
E Longview Road Closure East Longview between S Williamsburg Dr and N Pete Ellis Dr March 21, 2022 to April 3, 2022
E Longview Ave between S WIlliamsburg Dr and N Pete Ellis Dr will be closed to vehicular traffic from 3/21/22 to 4/03/22 while Shiel Sexton completes sewer lateral work. Pedestrian and bike traffic will be maintained through the placement of a walkaround in a port of E Longview, which will be protected from construction activities
Planning & Transportation
LINESTRING(-86.49664838888798 39.16697168215208,-86.4953573981518 39.16697168215208,-86.49499678621432 39.16692415258902)
Kirkwood Closure for Street Dining E. Kirkwood Ave. Indiana to Dunn, Dunn to Grant, and Half block from Walnut to Alley. March 21, 2022 to October 31, 2022
Kirkwood has been closed through October 31st to all East West traffic in the areas outlined. North/South roads are still passable and open during the duration of the temporary closure. Any questions please contact Department of Public Works @ 812-349-3410.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53344102010841 39.1665727662801,-86.53288173397176 39.1665727662801),LINESTRING(-86.5298001770228 39.1665727662801,-86.52834164650959 39.16655576149904),LINESTRING(-86.52815521779738 39.16655576149904,-86.52700374633957 39.16653875671389))
Park Ridge Resurfacing Project Park Ridge Road between East Third Street and East Cambridge Drive. March 28, 2022 to May 31, 2022
Lane restrictions will be in place for the milling and repaving of Park Ridge Road..
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.47630335771912 39.16430900858737,-86.47629070200456 39.16484869165171,-86.47567057199083 39.16542761979008,-86.47546808055777 39.16622241167639,-86.47512637626451 39.168312377110055),LINESTRING(-86.47512637626451 39.168312377110055,-86.47511372054996 39.16832218900791))
South College Ave South College Ave from West 17th Street to West 11th St March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.53473820744001 39.17897917561743,-86.53475003914141 39.175952464411694,-86.53480919764839 39.17329710592628)
Varsity Lane Varsity Lane from East 20th St to North Dunn March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.53089925412182 39.181826501047425,-86.53091937068936 39.18217474955142,-86.53111248973842 39.18245334711244,-86.53121575478546 39.18265709686847,-86.53121307257642 39.183219484712026,-86.53111651305193 39.1834128369793,-86.53098776701921 39.183530303419616,-86.53070881728165 39.18364465109329,-86.53031185034745 39.183672718221146,-86.53001814846029 39.183654006803835,-86.52982100609768 39.1835957934737,-86.52967750791541 39.18351471054061,-86.52942806247701 39.18323403812698,-86.52926847104061 39.183082266651326,-86.52910619739521 39.18302405284766,-86.52892917160025 39.1829939063947,-86.52865692738524 39.18298662966271,-86.52846112612716 39.1829939063947,-86.52834847334853 39.18299598546082)
North Old State Road 37 North Old State Road 37 from North Walnut Street to North Hillview Dr March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.5347530121348 39.20706091122989,-86.53306124091634 39.20759535182029,-86.53220234168235 39.20793819835964,-86.53142152419692 39.20809953732845,-86.53066673396098 39.20818020667389,-86.53012016172117 39.20818020667389,-86.52946948048331 39.20818020667389)
East 15th Street East 15th Street from North Walnut Street to North Dunn St March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.53350367235312 39.176850170715596,-86.53098237779889 39.17686961854395,-86.52927642725477 39.176872859848174,-86.5283544613357 39.17687123919609)
Hidden River Project E 3rd St & Lincoln intersection March 28, 2022 to April 11, 2022
The innermost lanes on 3rd street will be closed at 3rd and Lincoln to construct the mid-block crosswalk. This closure will likely be up for approximately two weeks.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53110311648565 39.16557493965371,-86.53112913003248 39.16407234278475),LINESTRING(-86.53234525977369 39.164606827419846,-86.53046578673212 39.164571531159964))
South Swain Ave South Swain Ave from East 3rd Street to dead end of Swain. March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51527184108245 39.164253239382305,-86.51524230685894 39.161032036078865,-86.51522261737664 39.16014656098409,-86.51520292789432 39.1597343532589),LINESTRING(-86.51521277263548 39.15971908625977,-86.5151635489297 39.159444279708225))
North Walnut Street North Walnut Street from East 11th Street to East 17th Street March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.53347770329434 39.17896500892439,-86.53357503327392 39.17442210376993,-86.53359552379597 39.1732783890906)
South High Street South High Street from East 2nd Street to East Arden Dr. March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50843634342287 39.160967595417986,-86.50844247291226 39.154083532458316,-86.50842675016015 39.15046235000415,-86.50837958190387 39.149019514959974),LINESTRING(-86.50838482282123 39.14901138622801,-86.50833765456487 39.14730433172244))
South Dunn Street South Dunn Street from East Kirkwood to East 3rd Street March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.52825630766554 39.16654613649763,-86.52825001424183 39.16553609848438,-86.52823428068255 39.16503595351929,-86.52822484054698 39.164621196460644,-86.52828148136051 39.16446993151297)
South Smith Road South Smith Road from East Hagan St to East Brighton Ave/East Brighton Crest March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.48075419895216 39.162943435774594,-86.48066512987552 39.16113884520945,-86.48067674758116 39.15994977188299,-86.48061091391581 39.15923211436734,-86.48057993336741 39.157565559262)
East Buick Cadillac Blvd East Buick Cadillac Blvd from South College Mall Road to South Clarizz Blvd March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.4977981743464 39.15815448922967,-86.49721113752015 39.15816817920751,-86.49656672115448 39.15821609410884,-86.49584285619578 39.15838379600666,-86.49545885466281 39.158513850264455,-86.49472616208267 39.15876711312919,-86.49394491758456 39.159010107723475,-86.49357415748376 39.159143583270264,-86.49326077692237 39.15932155027207,-86.49309305211487 39.15937630925899,-86.49214849661999 39.15936261951626,-86.49146876976852 39.159359197080136,-86.49067869764897 39.159417378471176)
South Sare Road South Sare Road from East Moores Creek to East Rhorer Rd March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.49826803209908 39.1504445765965,-86.4989208334828 39.14970690655028,-86.49910734816385 39.14898369311652,-86.49897678788712 39.148217078762684,-86.49899543935523 39.14734920337909,-86.4989394849509 39.1469441912044,-86.4986597129293 39.14651024700245,-86.49832398650338 39.14629327389821,-86.49752197337482 39.145888255647435,-86.49705568667217 39.14538197955659,-86.49692512639517 39.14426815933885,-86.49662670290549 39.14327004572917,-86.49657074850116 39.14214172634598,-86.4964774911606 39.136094783559145,-86.49675726318222 39.13583437722974,-86.49655209703305 39.1355884370343),LINESTRING(-86.49655209703305 39.1355884370343,-86.49653344556498 39.135139955642984,-86.4978017453962 39.13366428703219,-86.49925655990849 39.132622619982044,-86.501103055251 39.13139285432598,-86.50192371984768 39.13071285703717,-86.50237393587216 39.130046047444154,-86.5027842681705 39.12956859409519,-86.50332157235228 39.12815235344104,-86.50421684282138 39.12658972479227,-86.50546649118449 39.12551901477718,-86.50736894093139 39.12439041092588,-86.509756328849 39.12318944081528,-86.51048373610514 39.122900047365846,-86.51100597721214 39.122683001498615,-86.51134170363802 39.1223501965367,-86.51154686978721 39.12204632976355,-86.5115841727234 39.12152541224586))
East Blue Ridge Dr to North Dunn St East Blue Ridge Dr to North Dunn St March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53448712045295 39.19685853199397,-86.53418186148477 39.19700450015418),LINESTRING(-86.53454557429792 39.19702463366971,-86.53417861404893 39.19700450015418),LINESTRING(-86.53416887174146 39.19701205022318,-86.53349015765262 39.19736941922787),LINESTRING(-86.53347716790933 39.197376969257675,-86.53248345254484 39.1963929418705,-86.53184695512185 39.19586191369319,-86.53145076795037 39.19608086892555,-86.53107406539392 39.196216771830024,-86.53071035258077 39.19633002404956,-86.53047004232923 39.19648857685033,-86.53030117566598 39.19673018043008,-86.530281691051 39.196876148856944,-86.53031416540931 39.19706490068344,-86.53040509361259 39.19724106859732,-86.53055122822502 39.19738703596275,-86.5307753012974 39.1975053196399,-86.53067138335075 39.19766638645453,-86.53047328976503 39.19790798598413,-86.5300933397727 39.19821250087438,-86.52987900900781 39.198320716591894,-86.52947957440053 39.19844906525006,-86.52927498594312 39.19849436472049,-86.52854106544518 39.19851198117334))
East 2nd Street East 2nd Street between South High St to South Woodscrest Dr March 28, 2022 to April 1, 2022
Lane restriction from 6:00 am to 4:00 pm, weather permitting, for crack sealing.
Street
LINESTRING(-86.5084347720021 39.16101008772958,-86.50247082478828 39.160963718332)
CBU Lane Restriction E 3rd St Hydrant Repair E 3rd St between Woodcrest/Hillsdale and Clark March 29, 2022 08:00 am to 15:00 pm
Please be advised that CBU crews have closed one lane of E 3rd St between Woodcrest/Hillsdale and Clark to repair a hydrant. Normal traffic flow is expected to resume at 3:00pm. Road signs are in place.
Utilities
LINESTRING(-86.5049396691327 39.164267848966176,-86.50246231276776 39.16424697075112)
North Lincoln St North Lincoln between East 15th Street to East 16th Street March 29, 2022 to March 30, 2022
Road closed for tree and stump removal
Street
LINESTRING(-86.530952729743 39.17688900746347,-86.53098568497474 39.17774482255558)
W Countryside Ln W Countryside Lane from S Sunflower Dr to W Adams Hill Cir March 30, 2022 to April 1, 2022
Roadway repair, 6:00 am to 4:00 pm
Street
LINESTRING(-86.5541379009403 39.14098631895524,-86.553764150228 39.14109743922947,-86.55340908705129 39.14127136626311,-86.55310385730292 39.141508099590624,-86.55271764823351 39.14180763857843,-86.55245602273492 39.14203953885493,-86.55208227202259 39.14225694467038,-86.55178327145273 39.14232941312633,-86.5513908332048 39.14239221906115,-86.55084889467196 39.14240671273046)
Walnut Street Traffic Signals. The intersection of 11th Street and Walnut Street and the intersection of 14th Street and Walnut Street. April 1, 2022 to July 29, 2022
Lane restrictions will be in place for the construction of new traffic signals at 11th and Walnut and 14th and Walnut.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53363370488768 39.175966543620945,-86.5333855020016 39.175966543620945),LINESTRING(-86.5337282583681 39.17330025069447,-86.53346823629695 39.17330025069447),LINESTRING(-86.53353915140727 39.17306202028945,-86.53349187466705 39.176113140986985))
Jill Behrman 5k N. Fee Lane, E. 7th Street, Indiana Avenue, N. Union Street, and E. 10th Street April 2, 2022 07:00 am to 14:30 pm
Jill Behrman 5K
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.5153362216914 39.16886338026379,-86.51534713308642 39.16887183973512,-86.51703839931365 39.16886338026379,-86.51721298163388 39.168770326011355,-86.51761670324942 39.168770326011355,-86.51787857672976 39.16869419062235,-86.51805315905 39.16877878549394,-86.51929705808165 39.168761866527774,-86.51928614668662 39.16848270299823,-86.52123928639419 39.16844040539712),LINESTRING(-86.51617639910752 39.168905677610525,-86.51615457631749 39.16887183973512),LINESTRING(-86.51616548771248 39.16888029920554,-86.51617639910752 39.16888029920554),LINESTRING(-86.51616548771248 39.16888029920554,-86.51615457631749 39.16888875867485),LINESTRING(-86.51155113515094 39.17265322350556,-86.51538136676464 39.173445180188764,-86.51564788903713 39.171544814766094,-86.5125134598893 39.17158744619451,-86.51234848993415 39.16856055055442,-86.513514018724 39.16871110960483,-86.51460515822544 39.168702650114085,-86.5153362216914 39.16886338026379,-86.51616548771248 39.16888029920554),LINESTRING(-86.51538136676464 39.173445180188764,-86.51892642999982 39.1740109972516,-86.5191002076094 39.171639923886346,-86.52031665087638 39.17166686835097,-86.52021238431064 39.16889153426527,-86.52090749474891 39.16859513288992),LINESTRING(-86.52510909276418 39.166777360997145,-86.52510909276418 39.166777360997145,-86.52513659498109 39.166943678381614,-86.5251035923208 39.1671313180355,-86.5249715816797 39.1672294022008,-86.52476806527464 39.16730616362608),LINESTRING(-86.5251035923208 39.16696500109475,-86.52512009365095 39.166943678381614),LINESTRING(-86.52251288348901 39.16676883188987,-86.52251288348901 39.16676883188987,-86.5220288444716 39.166841329268436,-86.52155030589753 39.16686265201264,-86.52247438038538 39.16677309644362,-86.52273840166761 39.16690103293584,-86.5228209083183 39.1670119110409,-86.52293641762928 39.167144111629995,-86.52326644423208 39.1672592538761,-86.5236184726084 39.167323221709125,-86.52476256483142 39.16730616362602),LINESTRING(-86.52476256483142 39.16730616362602,-86.52476256483142 39.16730616362602),LINESTRING(-86.52123928639419 39.16844040539712,-86.52086825091844 39.167992748203886,-86.52083524825815 39.16772408547163,-86.5208737513618 39.16747674427111,-86.52111577087052 39.167216608621715,-86.5215448054546 39.16685845684796),LINESTRING(-86.52552162601769 39.16665795340168,-86.52552162601769 39.16665795340168,-86.5251035923208 39.16675177367233,-86.52585715306385 39.16658545583411,-86.5263961965151 39.166534281035524,-86.52690773774943 39.166538545603515),LINESTRING(-86.52690773774943 39.166547074738645,-86.52697359779606 39.16851077288757,-86.52122816400745 39.16845976843439),LINESTRING(-86.52123912857576 39.16845126768857,-86.52122816400745 39.16846826917916))
International Food & Art Festival 4th between Dunn and Grant, Dunkirk Square Parking Lot April 10, 2022 10:00 am to 20:00 pm
International Food & Art Festival
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.5297901789802 39.16556033302183,-86.52918383462449 39.165557119355356,-86.52827812525982 39.16555231903365),LINESTRING(-86.5292013909254 39.16505728475224,-86.52918674559004 39.16505955574519),LINESTRING(-86.52918674559004 39.16555235947956,-86.52918674559004 39.165556901433405),LINESTRING(-86.52918674559004 39.16555463045654,-86.5291808874559 39.16555917241024),LINESTRING(-86.52918674559004 39.16563184362951,-86.52918674559004 39.16563184362951),LINESTRING(-86.52918967465709 39.165629572655064,-86.52918674559 39.16563184362951))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.