Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to November 1, 2026
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE
Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave.
Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-08-2696 3115 S Walnut Street August 24, 2026 to November 2, 2026
Lane closure
Engineering
LINESTRING(-86.53139870895787 39.12769739955425,-86.53140961008194 39.12672067237892)
Rogers St between Patterson and 1st St: lane restrictions, flagging through this corridor. Rogers St between Patterson and 1st St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53874184326119 39.15381014075365,-86.53864911379202 39.159143194572096)
Kirkwood between Rogers and Pine: lane restrictions, flagging through this corridor. Kirkwood between Rogers and Pine August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53871888988866 39.16662737783176,-86.54842546717605 39.166689987041195)
Grimes between Walnut and Patterson: lane restrictions, flagging through this corridor. Grimes between Walnut and Patterson August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.5337353862689 39.153353907205144,-86.53684373653472 39.153348112847794)
Patterson between Grimes and 3rd St: lane restrictions, flagging through this corridor. Patterson between Grimes and 3rd St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53683370113019 39.153335691690245,-86.54181064011533 39.15394251541889,-86.54345396926207 39.155920722835276,-86.54825061004615 39.16056525193349)
Milling and Resurfacing Project on S. Liberty Drive S. Liberty Drive from State Road 48 to the End of City Maintenance September 8, 2026 to November 2, 2026
Advanced Notification of a Paving Project on S. Liberty Drive from State Road 48 to the End of City Maintenance located just south of Kroger's most southern entrance. This project will be completed by November 2, 2026 and official dates will be updated when we have them.
Street
LINESTRING(-86.57913564386885 39.16455809781095,-86.57917610892733 39.164307105457226,-86.57915992290394 39.163977676633806,-86.57915587639803 39.16257439204213,-86.5791356438688 39.16191865413978)
ROW2026-09-2722 102 South Clark Street September 11, 2026 to November 30, 2026
alley improvements
Engineering
LINESTRING(-86.5053187808586 39.166797797806396,-86.50532098828194 39.166640350008095)
Eagleson Ave Bridge Replacement Bridge on N Eagleson Ave at Law Lane September 18, 2026 to June 1, 2027
Bridge replacement.
Monroe County Highway Department
LINESTRING(-86.51546650649244 39.17336681187555,-86.51560040404867 39.17292161307793)
ROW2026-08-2704 S Banta between Ralston and Country Club September 18, 2026 to October 9, 2026
Lane restrictions
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5447746995723 39.13850685470166,-86.54476818194182 39.136297608116735),LINESTRING(-86.5441238198063 39.136275983024746,-86.54411266011527 39.13659048048555,-86.54402338333638 39.13668569500413,-86.54394898597903 39.136703006668114,-86.54387830835216 39.136677039073675,-86.54388574831266 39.13625001546649,-86.54387458862166 39.13695114082569))
Eagleson Ave Bridge Replacement N Eagleson Ave between Law Lane and E 10th Street September 24, 2026 to November 1, 2027
Bridge replacement
Indiana Department of Transportation
LINESTRING(-86.51546629646931 39.17336703341775,-86.51561227214475 39.17286274839222)
Lane Restrictions on S Walnut St for a Paver Patch S Walnut St from W Country Club Dr to W Gordon Pike September 28, 2026 06:00 am to 16:00 pm October 1, 2026
Lane Restrictions on S Walnut St from W Country Club Dr to W Gordon Pike for paving.
Street
LINESTRING(-86.53113566443574 39.1359252487878,-86.5314083639414 39.134799040867335,-86.5314231044552 39.134341692406736,-86.53143784496902 39.13321545915886,-86.53142310445527 39.13110015005901,-86.53138625317074 39.12867032471195,-86.53137888291381 39.126640641635674,-86.53137888291381 39.12530845165509,-86.5313715126569 39.12333013163368,-86.53137074615186 39.12148962659603)
Lane Restrictions and No Parking on S Muller PKWY S Muller PKWY from W 3rd St to the End of City Maintenance September 28, 2026 06:00 am to 16:00 pm October 1, 2026
Milling and Resurfacing on S Muller PKWY from E 3rd St to the End of City Maintenance
Street
LINESTRING(-86.5627347672702 39.164382525391176,-86.56277689904742 39.16431019275362,-86.56285213436385 39.16423552672717,-86.56289426614104 39.16420519363126,-86.56304172736127 39.16413519412933,-86.56339683805486 39.16400919485022,-86.56387232525472 39.16384119546038,-86.56440800070776 39.163647528999206,-86.56451333015077 39.163591528959216,-86.56461865959378 39.163519195508314,-86.56469020320996 39.16346585797453,-86.56499926351097 39.163362018629044,-86.5650713775812 39.16333406185598)
Lane Restrictions and No Parking on S Basswood Dr S Basswood Dr from W Bloomfield Rd to the Dead End September 28, 2026 06:00 am to 16:00 pm October 8, 2026
Milling and Resurfacing on S Basswood Dr from W Bloomfield Rd to the Dead End
Street
LINESTRING(-86.56899602166523 39.149839858562416,-86.56915701054706 39.14995889812553,-86.56928217071071 39.150006044597774,-86.56939074460773 39.149997334398506,-86.56948434279485 39.14997120379422,-86.5697314420088 39.149881198305195,-86.56992238231052 39.149828937000706,-86.5701395301046 39.14981441996477,-86.57036042182618 39.14984926084597,-86.570521410708 39.14992184595965,-86.57080220526932 39.15015702121386,-86.57132854583824 39.150628218804485,-86.57185269568599 39.15109566045152,-86.57202866027778 39.15125534477471,-86.57223083236188 39.15150503226289,-86.57227950341918 39.15156890566408,-86.57236935767881 39.15177213882768,-86.57245921193844 39.152016017849206,-86.57250413906824 39.15214086035459,-86.57250595562098 39.153959353679994,-86.57250973300363 39.15473851107754,-86.57242663058503 39.15493476364827,-86.57230812873034 39.15513171299125,-86.57229301919968 39.15525473636734,-86.57226657752105 39.155409979844535,-86.57221362225494 39.155559643556614,-86.57208896862704 39.155723673679375,-86.57200586620844 39.155802759494804,-86.57193787332051 39.15584962512125,-86.57180188754462 39.155934568989636,-86.57161301841147 39.15604294550039,-86.5714017534326 39.15617747546858,-86.57125443550873 39.156318071505524,-86.57117133309013 39.156444021883374,-86.57114111402883 39.15652896503417,-86.57110711758484 39.156687134765804,-86.57109956281955 39.15680359782354,-86.57114111402885 39.156947121664416,-86.57119022000347 39.15707599996594,-86.5712393259781 39.15721073611962,-86.57124688074342 39.15735425912999,-86.57124310336077 39.157483136685755,-86.57122043906477 39.15759736886733,-86.5711600009421 39.157726245977756,-86.57108445328885 39.157852193834884,-86.57101268301824 39.157975212454375,-86.57086914247702 39.158101159865794,-86.57071804717052 39.15819195902256,-86.57055561971598 39.1582769000631,-86.57027987078155 39.15832962203669,-86.56982536372796 39.158341935344225,-86.56871481322493 39.158341935344225,-86.56839373569855 39.158344864341075,-86.5681444284427 39.15842394721028,-86.56792534024822 39.15857918369497,-86.56765336869648 39.15877542555333,-86.56753429120486 39.15885785533911,-86.56664282889632 39.15930598715488)
ROW2026-09-2761 402 E 19th September 28, 2026 to October 2, 2026
Lane restrictions
Engineering
LINESTRING(-86.52945138454076 39.18100929931484,-86.52963338668984 39.18101396313071,-86.52963489078476 39.18090902776612)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.