Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to November 1, 2026
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave. Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-04-2447 113 S Smith RD July 15, 2026 to August 31, 2026
lane closures
Engineering
LINESTRING(-86.48132271673016 39.16632563686514,-86.48125087291123 39.16632935030836,-86.48121554353493 39.164972820328785,-86.48128738735385 39.16497096357139,-86.48131612488133 39.166325946536375)
Bloomington Convention Center Lane Closure 302 S College July 25, 2026 to August 24, 2026
Western south bound lane and bike lane closure to accommodate pedestrian diversion on the west side of S College Ave for sidewalk and curb line reconstruction.
Engineering
LINESTRING(-86.5349446900974 39.16452373958214,-86.5349446900974 39.163997727760346)
ROW2026-05-2474 310 N Jefferson Street August 3, 2026 to August 21, 2026
Lane restrictions for sidewalk work
Engineering
LINESTRING(-86.5071578466025 39.16883087062939,-86.50714796867838 39.168292877351405)
ROW2026-08-2680 1455 W Bloomfield Road August 11, 2026 to August 25, 2026
Lane closures for street cuts associated with gas line work.
Engineering
LINESTRING(-86.55757770438115 39.158068628057634,-86.55720860858987 39.15822159653399,-86.55639617360107 39.158626221222875,-86.5552294915024 39.159351579169254,-86.55526767382565 39.15928743216932,-86.55638344616015 39.15859003536977,-86.55719800238911 39.15818705529415,-86.55748012733301 39.158076852177714,-86.5575734619009 39.15806698323348)
City Utilities Unscheduled Road Closing West Graham Drive West Graham Dr CLOSED between S Broadview Dr & S Brown Avenue August 13, 2026 daily until August 27, 2026
W Graham Dr CLOSED between S Broadview Dr & S Brown Ave for 2 hrs to repair a damaged sewer main.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54317835115764 39.139906967284645,-86.54317835115764 39.139906967284645),LINESTRING(-86.54317835115764 39.13992188378282,-86.54205135392318 39.13989205078332),LINESTRING(-86.54205135392318 39.13989205078332,-86.54203981470236 39.13988608418191))
Fiber Boring Project Lane Closures West bound lane of Dodds from just east of Walnut, through across the One Way portion between Walnut and College and then westbound lane on Dodds to just west of Madison St. August 14, 2026 08:00 am to 17:00 pm daily until August 25, 2026
Variety of lane closures for boring project moving along the described location over the course of a week or so.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53344747155212 39.15742307390377,-86.53428839394094 39.15744225222301),LINESTRING(-86.53429828714553 39.15743841655956,-86.53446152502102 39.15746910186115,-86.53466928231707 39.157549650714174),LINESTRING(-86.53514910273893 39.15744992354922,-86.53759767087111 39.157492115828575))
Milling and Paving on E Miller Dr E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St August 17, 2026 06:00 am to 16:00 pm August 27, 2026
Lane Restrictions on E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St for milling and resurfacing.
Street
LINESTRING(-86.53256239686438 39.14690604822934,-86.53085123032614 39.14691987177696,-86.52908658983357 39.14691987177696,-86.52726847538666 39.14691526392804,-86.52694763166075 39.14691987177696,-86.52676938514635 39.146970558095035,-86.52654954777859 39.147007420848894,-86.52619899630027 39.147021244376646,-86.52605639908874 39.147025852218576,-86.52574743846378 39.14699820516225)
West side Chick-Fil-a electric feed 2511 W 3rd St August 17, 2026 07:30 am to 15:30 pm August 21, 2026
WO# 59075858 single lane, bike lane, and sidewalk closure to accommodate a stand up new riser, aerial work, and pulling cable through existing conduit to feed the new Chick-fil-A site on 3rd St. Closures to take place between 7:30-3:30. 8/10/26 - 8/14/26
External Project
LINESTRING(-86.56845501197719 39.16446233251838,-86.56802106689351 39.16446032981952)
subsurface utility engineering (SUE) fieldwork along N. Dunn Street 1701 N Dunn St August 17, 2026 08:00 am to 17:00 pm daily until August 21, 2026
Perform subsurface utility engineering (SUE) fieldwork along N. Dunn Street, from E. Vernon Avenue north to approximately 500 feet north of E. Tamarack Trail. Work includes hydro-excavating up to ten 2-foot-by-2-foot test holes in grassy areas to verify the location and depth of gas lines for a proposed trail and drainage project. Each test hole will be backfilled and the previously removed sod restored upon completion. No paved surfaces will be disturbed. The northbound lane of N. Dunn Street will be temporarily closed near active work areas, with flaggers directing traffic around each work zone. Traffic impacts are expected to last no more than two days.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.528492564003 39.18663499227401,-86.52859038389741 39.19848709348537),LINESTRING(-86.5283295308455 39.18587679410908,-86.52839474410847 39.179229573391126))
West 2nd Street Modernization and Safety Improvements Intersection of S Rogers Street and West 2nd Street August 17, 2026 to August 23, 2026
Full closure of the intersection
Engineering
LINESTRING(-86.53872317278663 39.16147416273694,-86.53872484916727 39.16143516830414,-86.53877178782503 39.16143516830414,-86.53877011144439 39.161367577902894,-86.53871982002538 39.1613662780868,-86.538721496406 39.16132728359426,-86.53865276479999 39.16132598377749,-86.53865276479999 39.16136367845465,-86.53860247338098 39.16136367845465,-86.53860582614223 39.16143516830414,-86.5386477356581 39.16143386848938,-86.53865276479999 39.16147026329463,-86.53871982002538 39.16147156310876)
ROW2026-08-2688 134 East 7th Street August 17, 2026 to September 11, 2026
Lane closures- Short term.
Engineering
LINESTRING(-86.50773129680023 39.16821038694164,-86.50827276774513 39.16820778756244)
Patterson, Grimes and Rogers pavement improvement project South Rogers from Dodds Street to 1st Street August 18, 2026 to August 20, 2026
Road Closed from the north leg of Dodds St to 1st Street-open to local traffic only **Rogers closed to Truck traffic** Dodds St to 3rd street
Engineering
LINESTRING(-86.53865836653654 39.157538288588256,-86.53865836653654 39.15932789921044)
Lane Restrictions on E 3rd St for Tree Removals E 3rd St between S Indiana Ave and S Eagleson Ave August 18, 2026 08:30 am to 15:00 pm August 19, 2026
One lane will be closed on E 3rd St between S Indiana Ave and S Eagleson Ave for tree removals.
Street
LINESTRING(-86.52694217205205 39.16431563411339,-86.52591934413871 39.16428941799873,-86.522656438564 39.16425337082515,-86.51997257193194 39.164269755906304,-86.5164391664132 39.1642664788904)
CBU - Stormwater Maintenance West Seventh Street between North Fairview Street and North Rogers Street. August 19, 2026 to August 20, 2026
Beginning Wednesday, August 19, 2026, at 9:00 a.m., City of Bloomington Utilities (CBU) will implement a lane restriction on West Seventh Street between North Fairview Street and North Rogers Street to allow crews to complete stormwater maintenance in the area. Traffic will be maintained through the work zone, though motorists should expect minor delays and are encouraged to use caution while traveling through the area. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.54033237738312 39.16862241101509,-86.53982863839558 39.16861758948346)
ROW2026-07-2629 1112 S Stull Avenue August 19, 2026 to August 21, 2026
lane closures for street cuts
Engineering
LINESTRING(-86.52489508369956 39.15407316787113,-86.52488670179639 39.153441388945424)
Milling and Paving on S High St S High St from E Arden Dr to the roundabout August 19, 2026 06:00 am to 16:00 pm August 27, 2026
Lane Restrictions for milling and paving on S High St from E Arden Dr to the roundabout for milling and paving.
Street
LINESTRING(-86.50834750234071 39.14726375049864,-86.50830810995471 39.14532686555654,-86.50830023147752 39.14402539557844,-86.50825296061431 39.14175784127093,-86.50821356822834 39.13964359693628,-86.50813576131124 39.13652171387639)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.