3/25/2013 12:37:52 Closed by Anonymous
This is still under control of the contractor building the Bypass project. The contractor is aware of it and will be making the repair when the asphalt plant is opened in April.
There is a cut in the concrete on the E 7th St sidepath (near bypass underpass) that is 1 - 1.5 inches deep. It is jarring to ride over on a bike and may be a tripping hazard for pedestrians.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
This is still under control of the contractor building the Bypass project. The contractor is aware of it and will be making the repair when the asphalt plant is opened in April.
City | Bloomington |
---|---|
State | IN |
Zip | 47408 |
Latitude | 39.168029785156 |
Longitude | -86.500846862793 |
Neighborhood Association | Green Acres |
Township | Bloomington |