6/14/2019 15:16:52 Closed by Adam Wason
Anne -
Thank you for the message and note about the conditions of the crosswalks and street surface on Kirkwood. This project was recently put out to bid, and unfortunately the bids came in over $300,000 from the engineer's estimated project costs. With only one bidder for the project, and after outreach to other contractors, we feel like the high cost was due to a capacity issue of local contractors during the summer construction season. We're regrouping and looking to come up with interim and alternate plans.
My best,
Adam Wason
Sent notification to Danna Workman, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=168958
Closed by Adam Wason
Anne -
Thank you for the message and note about the conditions of the crosswalks and street surface on Kirkwood. This project was recently put out to bid, and unfortunately the bids came in over $300,000 from the engineer's estimated project costs. With only one bidder for the project, and after outreach to other contractors, we feel like the high cost was due to a capacity issue of local contractors during the summer construction season. We're regrouping and looking to come up with interim and alternate plans.
My best,
Adam Wason
6/14/2019 14:19:13 Ryan Robling assigned this case to Danna Workman
Sent notification to Danna Workman, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=168958
Ryan Robling assigned this case to Danna Workman
You can use the link to follow progress on this case.
6/14/2019 14:05:37 Anonymous assigned this case to Ryan Robling
Sent notification to Ryan Robling, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=168958
Anonymous assigned this case to Ryan Robling
You can use the link to follow progress on this case.