4/8/2021 13:48:09 Closed by Chris Axsom
Jim, thank you for your Ureport. Pickwick is on the schedule to be repaving tentatively in May.
Other: As rain come downhill on the street, it sometimes overwhelms our drainage tunnel. Over the years this created a line of crumble in Pickwick, in the last two years this has become a serious hazard for bicycles, pedestrians and not too good for our cars. Is there a chance we could get some blacktop put down on this? I'll be taking bids to resurface my driveway this summer, and it would be best if the street was repaired before this work gets done. Thank you! Jim Murray 1306 S Pickwick Pl Bloomington, IN 47401 812-339-8876 (home) 812-345-5513 (mobile) jmurray@iu.edu
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
Jim, thank you for your Ureport. Pickwick is on the schedule to be repaving tentatively in May.
Supervisor will check into your concern.
City | Bloomington |
---|---|
State | IN |
Zip | 47401 |
Latitude | 39.153213500977 |
Longitude | -86.505378723145 |
Neighborhood Association | Covenanter |
Township | Perry |
Status | Case Date | Category | |
---|---|---|---|
closed | 3/8/2023 | Recycling | |
closed | 7/24/2021 | Potholes, Other Street Repair | |
closed | 10/5/2000 | Yard Waste |