9/21/2022 15:35:36 Closed by Anonymous
Our paving schedule is already set for 2022. We will re-evaluate this area for our 2023 schedule.
Other: The road needs re-paved. It was great that the potholes got filled, but the road itself just needs an actual coat of ashpalt on it or something. Every time it rains, more if it washes down the sewer drains on the street.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
Our paving schedule is already set for 2022. We will re-evaluate this area for our 2023 schedule.