9/24/2024 16:54:47 Closed by Kyle Baugh
AEG has been made aware and is scheduling repairs as soon as possible.
Other: Fiber contractors did not tunnel deep enough when they crossed the B-Line (what a surprise!). In the section of the trail between 1st and Dodds there is now a sort of "speed bump" spanning the width of the trail pavement from where they crossed from one side to the other.
AEG has been made aware and is scheduling repairs as soon as possible.
Kyle - this is related to the fiber project. Can you advise?