City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
Since Roger Street is closed, all people who live off of high Street have to take high Street up to Morse Pike/Hillside. With these signs now up on both sides, it is down to one lane for no reason. There's no reason to have the northbound traffic on high Street blocked.
City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure.
Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.
City Construction Projects
414 E Cottage Grove AVE
- Case Date:
- 5/26/2025
Cavity forming alongside water meter in ROW close to SW corner of lot.
City Construction Projects
3549 N Hackberry ST
- Case Date:
- 5/18/2025
Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.
City Construction Projects
Hillside Dr
- Case Date:
- 5/16/2025
Why there road work on that intersection
City Construction Projects
1107 S Washington ST
- Case Date:
- 5/14/2025
Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—
City Construction Projects
- Case Date:
- 5/2/2025
Construction equipment is parked on the sidewalk. The city would not let businesses park this equipment on the street, blocking access for cars. Why do you allow them to block access for pedestrians? Thank you.
West 2nd street just east of eucild street northwest of street
City Construction Projects
320 N Jacob DR
- Case Date:
- 4/30/2025
Cut pavement hole by city 3 months ago and never blacktop. Hole is still there and very, very annoying!! I believe it’s a job unfinished or forgotten by city workers transportation department!
Thank you
City Construction Projects
1120 W 2nd St
- Case Date:
- 4/9/2025
Why there road work at west 2nd street
City Construction Projects
723 W Allen ST
- Case Date:
- 3/29/2025
Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown