uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (59)

closed #192865

City Construction Projects

1009 E Miller DR

Case Date:
8/14/2024

You drove over countless potholes to install a bunch of new roadbumps! Congratulations, you just increased wear and tear and everyone's vehicles without making the roads any safer at all.

closed #131167

City Construction Projects

1016 S Mitchell ST

Case Date:
4/2/2013

A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.

closed #160679

City Construction Projects

1106-1112 South Graywell Drive

Case Date:
8/16/2017

Does the city have a plan for taking in, and disposing of, our old trash bins and cans? Saying that "Residents are encouraged to reuse their old trash cans as yard waste containers" seems ingenuous. How long a yard waste season goes Bloomington have? -- 6 months? Where will I store 2 35-gal. cans and a 20-gal., plus the 3 bins currently used for recycling -- since my garage will be filled up with two 64-vallon containers?

closed #202690

City Construction Projects

1107 S Washington ST

Case Date:
5/14/2025

Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—

closed #198937

City Construction Projects

1109 E Wylie ST

Case Date:
10/21/2024

20x20 site of digging, with tarps in place and visible cones. Neighbors say some crew started this last week, then abandoned it. I certainly did not give anyone permission to enter my property, and if this is a right of way, it does not show on the plat. I want it remediated, repaired, and reimbursement for the costs of this destruction of private property. I'll contact the city attorney tomorrow.

closed #201967

City Construction Projects

1120 W 2nd St

Case Date:
4/9/2025

Why there road work at west 2nd street

closed #199235

City Construction Projects

1202 e 1st st and 1208 1st st

Case Date:
11/6/2024

There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.

closed #165810

City Construction Projects

1301 W Woodhill DR

Case Date:
9/5/2018

Cylinder electric box smashed over on ground next to street light

closed #193002

City Construction Projects

1307 W Gourley PIKE

Case Date:
8/21/2024

Pavement in even, swerving cars due to pavement issues almost caused several accidents

closed #199334

City Construction Projects

1326 S Dunn ST

Case Date:
11/12/2024

The crews installing fiber have left multiple construction signs in this general vicinity from Dunn heading to the west at least one block- they have been abandoned for over a month