City Construction Projects
1009 E Miller DR
- Case Date:
- 8/14/2024
You drove over countless potholes to install a bunch of new roadbumps! Congratulations, you just increased wear and tear and everyone's vehicles without making the roads any safer at all.
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
1106-1112 South Graywell Drive
- Case Date:
- 8/16/2017
Does the city have a plan for taking in, and disposing of, our old trash bins and cans? Saying that "Residents are encouraged to reuse their old trash cans as yard waste containers" seems ingenuous. How long a yard waste season goes Bloomington have? -- 6 months? Where will I store 2 35-gal. cans and a 20-gal., plus the 3 bins currently used for recycling -- since my garage will be filled up with two 64-vallon containers?
City Construction Projects
1107 S Washington ST
- Case Date:
- 5/14/2025
Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—
City Construction Projects
1109 E Wylie ST
- Case Date:
- 10/21/2024
20x20 site of digging, with tarps in place and visible cones. Neighbors say some crew started this last week, then abandoned it.
I certainly did not give anyone permission to enter my property, and if this is a right of way, it does not show on the plat.
I want it remediated, repaired, and reimbursement for the costs of this destruction of private property.
I'll contact the city attorney tomorrow.
City Construction Projects
1120 W 2nd St
- Case Date:
- 4/9/2025
Why there road work at west 2nd street
City Construction Projects
1202 e 1st st and 1208 1st st
- Case Date:
- 11/6/2024
There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.
City Construction Projects
1301 W Woodhill DR
- Case Date:
- 9/5/2018
Cylinder electric box smashed over on ground next to street light
City Construction Projects
1307 W Gourley PIKE
- Case Date:
- 8/21/2024
Pavement in even, swerving cars due to pavement issues almost caused several accidents
City Construction Projects
1326 S Dunn ST
- Case Date:
- 11/12/2024
The crews installing fiber have left multiple construction signs in this general vicinity from Dunn heading to the west at least one block- they have been abandoned for over a month