closed #170322
City Construction Projects
600 W 6th ST
- Case Date:
- 9/12/2019
I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.
I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.
Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.
Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.
Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.