City Construction Projects
E 3rd St, Bloomington, IN, USA
- Case Date:
- 12/6/2022
There is an unsecured steel road plate covering up a pot hole, it is not secure and dangerous. It also makes a loud, echoing noise all day and night and residents in neighboring apartment buildings hear the banging all day and all night long. It needs to be secured or the pothole or road issue needs to be fixed. It's been like this for about 10 days.
City Construction Projects
E 19th St, Bloomington, IN, USA
- Case Date:
- 12/12/2022
The apartment construction by Varsity properties on East 19th Street has caused an excessive level of dust on the road. Whenever a vehicle drives by, the dust becomes airborne. In addition, the dust also falls on to nearby vehicles, causing a significant amount of scratches and inconvenience.
No effort has been made to clean up the street. It is especially disgusting to walk on when it rains.
City Construction Projects
Bloomington, IN 47404, USA
- Case Date:
- 12/5/2020
On the lookout deck by the parking lot, there is a missing grate, so there is a leg-sized hole in the concrete. There is also a lot of broken class on the ground at the end of the lookout deck.
City Construction Projects
Bloomington Hospital Heliport, 2651 E Discovery Pkwy, Bloomington, IN 47408, USA
- Case Date:
- 2/19/2024
Why there road work at new hospital
City Construction Projects
Bloomington City Hall, 401 N Morton St, Bloomington, IN 47401, USA
- Case Date:
- 2/27/2024
At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.
City Construction Projects
Bloomington City Hall
- Case Date:
- 7/19/2020
Continual speeders on E Morningside. Someone told me our neighborhood association requested traffic calming. Please do something to keep it from being a drag strip. Definitely open to whatever you think best but multiple of us have complained for some time without changes. Thank you for your good work.
City Construction Projects
939 S High ST
- Case Date:
- 12/15/2020
Tree limbs growing into and touching public utility lines. Several trees have not been pruned.
City Construction Projects
925 E Atwater AVE
- Case Date:
- 8/13/2022
East 914 Atwater utility cut needs filled in
City Construction Projects
831 S Ransom LN
- Case Date:
- 9/9/2022
I met this morning with Mr. Nathan Bell (812-679-7436) who resides at 831 S Ransom Lane. Mr. Bell expressed concern about no speed limit signs along Ransom Lane between 2nd Street and Allen Street as this is a school bus corridor with safety concerns for his children and those of his neighbors. His formal request: install posted speed limit signs along Ransom Lane between 2nd Street and Allen Street.
City Construction Projects
800 N Woodlawn Ave, Bloomington, IN 47408, USA
- Case Date:
- 7/19/2021
The large maple tree at the front of Fire Station #3 was struck by lightning about a year ago, the tree is showing signs of degeneration, and there are Large limbs that hang down over the apron of the fire station that protrude into the driving path of our emergency apparatus. I have asked for the tree to be removed, however the tree has some large deadfall limbs hanging over the sidewalk (Fall Hazard to pedestrians) and about 6-7 limbs that need to be removed to render it safe. This is a huge safety issue and needs to be addressed. The limb that hangs over the apron needs to be removed to allow apparatus to safely enter and exit the bay of Fire Station #3.