closed #181800

City Construction Projects

7th & Washington, Bloomington, IN 47408, USA

Case Date:
10/12/2022

Hi there! It seems like every week there is an accident at the intersection of N Washington and 7th street. I’m wondering if you could put a stop sign there since it’s really dangerous for people driving and pedestrians crossing. Thanks!

closed #182597

City Construction Projects

728 W Allen ST

Case Date:
1/24/2023

Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.

closed #182178

City Construction Projects

709 N Keystone CT

Case Date:
11/30/2022

please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.

closed #176608

City Construction Projects

704 N. Parkridge Road, Bloomington, IN 47408, USA

Case Date:
7/18/2021

At 704 N. Park Ridge Road Ms. Kaye Hill reports that the sidewalk in front of her house is sinking and is adjacent to a storm drain. Sidewalk sink is helping to collect water and contribute to some flooding from recent rains. There are green and orange paint marks on the sidewalk there and it may already be on the list for repair. Please contact Kaye and take a look at the site to determine what can be done and advise Kaye. Thank you.

closed #181115

City Construction Projects

608 W Wylie St, Bloomington, IN 47403, USA

Case Date:
8/19/2022

Hi, I live on W Wylie Street between Rogers and Fairview, and I'm super concerned about the detour down our street. On the face of it, this seems like a good solution, because our street is one-way and there is a construction detour sign on Rogers that would route people the right way and bypass the construction on Second Street. As a resident, I can tell you that people race down this street the wrong way *all the time*, and with the construction detour they are now racing in the opposite direction as well. This is a one-lane street with the other lane used for on-street parking. I'm waiting for a bad head-on collision. Someone drove the wrong way down Wylie going at least 40 mph while I was writing this. Thanks for listening and doing anything you can to make this safer. I know they're breaking the law, but I don't want anyone to get hurt or killed. Thank you.

closed #173663

City Construction Projects

507 E Kirkwood AVE

Case Date:
9/10/2020

Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.

closed #181310

City Construction Projects

500 W Fairway LN

Case Date:
9/1/2022

New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.

closed #187276

City Construction Projects

500 W 7th ST

Case Date:
2/12/2024

Why there detour sign on seventh street

closed #175969

City Construction Projects

417 W Kirkwood AVE

Case Date:
6/1/2021

This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.

closed #174081

City Construction Projects

417 S Mitchell ST

Case Date:
11/8/2020

The retaining drainage Channel wall below the driveway is falling apart. This is a serious safety hazard. Additionally, tons of weeds are growing inside the channel that need removal and cleanup. This over growth is another reason why the cracks are appearing and the channel walls are falling apart. Please take action promptly. Thanks.