City Construction Projects
3449 E Longview AVE
- Case Date:
- 4/9/2023
Park Ridge neighborhood: Partnered with the traffic calming bumps are stakes with reflectors to bring driver's attention to the speed bumps. Nearly all of the stakes are missing the reflectors or the reflectors are damaged. Some of the pairs of stakes have one of the stakes missing like in front of my house. (A lawn service damaged it and removed it).
So please survey and replace the missing reflectors and a couple of the missing stakes. The stakes with no reflectors appear dangerous. Like "Games of Thrones" dangerous. It was odd at the conclusion of the 2022 Morningside repaving, that the new version of traffic calming bumps was installed (thanks), but the stakes were ignored in terms of reflectors. We appreciate your attention on this item.
City Construction Projects
323 S Grant ST
- Case Date:
- 4/5/2023
There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.
City Construction Projects
- Case Date:
- 3/28/2023
At 414 S Lincoln there is a nasty utility cut, no warning sign and no other option than to drive over it. Hope it can be fixed soon. Thanks!
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
City Construction Projects
- Case Date:
- 3/9/2023
Several weeks ago on 8th Street in Hopewell The house in the corner had some kind of construction where the city road was tore up they have since left some of it was fixed but they're still an uneven spot on the road can we get this addressed and fixed?
City Construction Projects
- Case Date:
- 2/11/2023
Stop light is not needed at John Hinkle and 10th per some reporter but is needed at the substantially busier and more dangerous intersection of Smith and 10th.
City Construction Projects
- Case Date:
- 2/4/2023
317 east 3rd street
City Construction Projects
323 1/2 S Lincoln ST
- Case Date:
- 1/27/2023
The signs giving instructions for the back-in parking should have the diagram (map) rotated 180 degrees. The standard for such diagrams is to have the direction of movement going UP the page, not down. Also, the parking spaces are shown on the right side of the diagram; it looks like you are instructed to front into spaces on the right (the small arrows pointing down are hard to notice, while the up-&-right arrow is large).
City Construction Projects
728 W Allen ST
- Case Date:
- 1/24/2023
Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.