City Construction Projects
3449 E Longview AVE
- Case Date:
- 4/9/2023
Park Ridge neighborhood: Partnered with the traffic calming bumps are stakes with reflectors to bring driver's attention to the speed bumps. Nearly all of the stakes are missing the reflectors or the reflectors are damaged. Some of the pairs of stakes have one of the stakes missing like in front of my house. (A lawn service damaged it and removed it).
So please survey and replace the missing reflectors and a couple of the missing stakes. The stakes with no reflectors appear dangerous. Like "Games of Thrones" dangerous. It was odd at the conclusion of the 2022 Morningside repaving, that the new version of traffic calming bumps was installed (thanks), but the stakes were ignored in terms of reflectors. We appreciate your attention on this item.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 4/11/2023
City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following:
1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.
City Construction Projects
2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
226 S College AVE
- Case Date:
- 6/12/2023
I was walking along the North side of 3rd st with my children and found the railing here was easy to move and break. I can see there were a few stablizing posts but the are not working. It is broken and unsafe and any adult who doesn't know this and leans on this or tips into it could easily fall onto 3rd st. Please fix asap
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
City Construction Projects
2701 E 3rd ST
- Case Date:
- 8/30/2020
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.
City Construction Projects
1398 W 8th ST
- Case Date:
- 9/5/2020
Huge hole in the road on the corner of 8th and Fountain.
City Construction Projects
507 E Kirkwood AVE
- Case Date:
- 9/10/2020
Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.
City Construction Projects
417 W Kirkwood AVE
- Case Date:
- 6/1/2021
This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.
City Construction Projects
105 W 4th ST
- Case Date:
- 1/12/2022
Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.