uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (29)

closed #198993

City Construction Projects

823 W 8th ST

Case Date:
10/24/2024

AEG was working again in our tree plot yesterday. The storm drain just west of our house, at the alley, is caked with mud and trash. This is the third time they have dug in this plot and the third time they have left a mess. We aren’t cleaning it up this time.

closed #182178

City Construction Projects

709 N Keystone CT

Case Date:
11/30/2022

please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.

closed #192921

City Construction Projects

613 E 12th ST

Case Date:
8/18/2024

Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?

closed #147255

City Construction Projects

555 N Morton ST

Case Date:
8/11/2015

Side walk lift (5")

closed #173663

City Construction Projects

507 E Kirkwood AVE

Case Date:
9/10/2020

Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.

closed #187276

City Construction Projects

500 W 7th ST

Case Date:
2/12/2024

Why there detour sign on seventh street

closed #199477

City Construction Projects

455 N College AVE

Case Date:
11/27/2024

The City of Bloomington was doing road construction repairs outside of people building and broke people light pole and never came back to replace or repair!

closed #155501

City Construction Projects

427 N Washington ST

Case Date:
9/6/2016

Sidewalk has lifted due to tree roots

closed #175969

City Construction Projects

417 W Kirkwood AVE

Case Date:
6/1/2021

This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.

closed #182215

City Construction Projects

409 E 3rd ST

Case Date:
12/5/2022

This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired