City Construction Projects
401 N Morton ST
- Case Date:
- 9/5/1997
Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?
City Construction Projects
401 N Morton ST
- Case Date:
- 6/10/2003
City Construction Projects
401 N Morton ST
- Case Date:
- 10/23/1997
Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?
City Construction Projects
312 N Park Ridge RD
- Case Date:
- 5/12/1997
She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
304 N BRYAN ST
- Case Date:
- 9/10/1997
The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.
City Construction Projects
2610 S Rockport RD
- Case Date:
- 8/31/1998
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.
City Construction Projects
2535 W Evergreen DR
- Case Date:
- 6/12/1997
MR. LUCAS CALLED AND STATED THAT SEWER LINES WERE INSTALLED TWICE IN A YEAR (THE LAST BEING ABOUT 5 WEEKS AGO) AND THAT DAMAGE WAS DONE TO HIS PROPERTY AND HAS NOT YET BEEN REPAIRED.
City Construction Projects
2419 W Evergreen DR
- Case Date:
- 5/19/1997
DENNIS SISCOE IS BUILDING A HOUSE AT 2419 W EVERGREEN DRIVE. APPARENTLY HE HAD TO COME ACROSS THE FRONT YARD OF MR. LUCAS' HOUSE TO HOOK ONTO THE CITY SEWER. IT HAS BEEN OVER TWO WEEKS AND THE TRENCH HAS NOT BEEN PROPERLY COVERED. THERE IS SEVERAL ROCK AND DEBRIS IN HIS YARD. HE WANTED TO KNOW IF THIS LINE HAD BEEN INSPECTED AND WHAT CAN BE DONE TO MAKE SISCOE CORRECT THIS PROBLEM. REFERRED TO THE MONROE COUNTY BUILDING DEPARTMENT.
City Construction Projects
2380 E Linden Hill DR
- Case Date: