uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (48)

closed #44916

City Construction Projects

4037 W STATE ROAD 45

Case Date:
6/19/2003

closed #66048

City Construction Projects

401 N Morton ST

Case Date:
10/23/1997

Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?

closed #103219

City Construction Projects

401 N Morton ST

Case Date:
6/10/2003

closed #118754

City Construction Projects

401 N Morton ST

Case Date:
9/5/1997

Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?

closed #67917

City Construction Projects

312 N Park Ridge RD

Case Date:
5/12/1997

She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.

closed #57792

City Construction Projects

309 N Walnut ST

Case Date:
6/16/1999

sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)

closed #66506

City Construction Projects

304 N BRYAN ST

Case Date:
9/10/1997

The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.

closed #180893

City Construction Projects

300 E Smith AVE

Case Date:
8/4/2022

A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.

closed #61981

City Construction Projects

2610 S Rockport RD

Case Date:
8/31/1998

Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.

closed #119217

City Construction Projects

2535 W Evergreen DR

Case Date:
6/12/1997

MR. LUCAS CALLED AND STATED THAT SEWER LINES WERE INSTALLED TWICE IN A YEAR (THE LAST BEING ABOUT 5 WEEKS AGO) AND THAT DAMAGE WAS DONE TO HIS PROPERTY AND HAS NOT YET BEEN REPAIRED.