open #167620

City Construction Projects

3625 E Morningside DR

Case Date:
2/26/2019

the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.

open #188054

City Construction Projects

Miller & Highland

Case Date:
4/18/2024

I've lived in this neighborhood for over 20 years, and the city put a hazard sign on the sidewalk months/years ago, but nothing else has been done to correct the problem, which can be quite dangerous at night

open #192921

City Construction Projects

613 E 12th ST

Case Date:
8/18/2024

Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?

closed #121873

City Construction Projects

502 N INDIANA AVE

Case Date:
8/1/1995

WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.

closed #121928

City Construction Projects

3110 N DAVID DR

Case Date:
7/12/1995

closed #122099

City Construction Projects

1204 E Wylie ST

Case Date:
5/17/1995

A section of sidewalk was removed last fall and was never replaced.

closed #125024

City Construction Projects

Case Date:
2/7/2012

Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east

closed #125721

City Construction Projects

Case Date:
4/13/2012

Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction? Thanks, Gerry Matthews

closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.

closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.